Planning application
Land Lying To The West Of Hague Lane Chesterfield
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Engineering works to facilitate the creation of a wetland, including channel creation, excavation works to the River Doe Lea embankment and associated works
As published by the council, reference CHE/25/00483/FUL
Application record
- Reference
- CHE/25/00483/FUL
- Type
- Full Application
- Status
- Awaiting decision
- Received
- 30 Jun 2025
- Validated
- 17 Jul 2025
- Ward
- Staveley North
- Parish
- Staveley Town Council
Site history
Applications at this address on the Chesterfield register
This site has had 2 applications since 2025.
-
CHE/26/00099/FUL Decided
Land Lying To The West Of Hague Lane Chesterfield
Installation of 1no. Temporary Construction Access Point
Timeline
Dates from the published record
-
30 Jun 2025
Received by Chesterfield
-
17 Jul 2025
Validated
Checked as complete and ready for consideration.
-
22 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 11 September 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Chesterfield took a median of 71 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in London
178 applications on PlanIndex · across 41 councils · 98% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itApplicant on file, registered in Leeds
3 applications on PlanIndex · across 3 councils
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
97 documents on file for this application
- DWT COMMENTS ON TECHNICAL NOTE
- DERBYSHIRE WILDLIFE TRUST COMMENTS
- DRAFT SECTION 106 AGREEMENT
- TECHNICAL NOTE RESPONSE TO DWT COMMENTS
- DERBYSHIRE WILDLIFE TRUST COMMENTS
- DRAFT HMMP
- ENVIRONMENT AGENCY COMMENTS
- BNG EXPLANATORY NOTE
- REVISED BIODIVERSITY NET GAIN ASSESSMENT
- BIODIVERSITY NET GAIN ASSESSMENT METRIC (REDLINE BOUNDARY)
- BNG BASELINE CA (REDLINE BOUNDARY)
- BNG POST-DEV CA (REDLINE BOUNDARY)
- INFILL AND INFLOW STRUCTURES
- REVISED FLOOD RISK ASSESSMENT
- DERBYSHIRE WILDLIFE TRUST COMMENTS
- STRATEGIC PLANNING COMMENTS
- ENVIRONMENT AGENCY COMMENTS
- LETTER FROM ARUP PROVIDING FURTHER INFORMATION
- 6169 SALIX - RIVER DOE LEA WETLAND FLOOD RISK COVER NOT V1.0
- 6169 SALIX - RIVER DOE LEA WETLAND WFD COMPLIANCE ASSESSMENT V1.0
- WETLAND GENERAL ARRANGEMENT
- INFILL AND INFLOW STRUCTURES
- WETLAND AND OUTFALL SECTIONS
- WETLAND LONG SECTION
- SITE BOUNDARY AND LOCATION PLAN
- CONSTRAINTS AND ACCESS PLAN
- DERBYSHIRE WILDLIFE TRUST COMMENTS
- ENVIRONMENT AGENCY COMMENTS
- INVERTEBRATE ASSESSMENT SURVEY REPORT
- BREEDING BIRD SURVEY REPORT
- LEAD LOCAL FLOOD AUTHORITY COMMENTS
- DCC ARCHAEOLOGIST COMMENTS
- VEHICLE TRACKING ANALYSIS
- RESPONSE TO ENVIRONMENT AGENCY COMMENTS
- GEOARCHAEOLIGICAL ASSESSMENT
- ENVIRONMENT AGENCY COMMENTS
- DESIGN SERVICES DRAINAGE
- ANNEX A- NATURAL ENGLAND STANDING ADVICE
- NATURAL ENGLAND COMMENT
- YORKSHIRE WATER COMMENTS
- CLLR LISMORE COMMENT
- LANDSCAPE OVERVIEW 8 OF 8
- DETAILED LANDSCAPE PROPOSAL 1 OF 8
- DETAILED LANDSCAPE PROPOSAL 2 OF 8
- DETAILED LANDSCAPE PROPOSAL 3 OF 8
- DETAILED LANDSCAPE PROPOSAL 4 OF 8
- DETAILED LANDSCAPE PROPOSAL 5 OF 8
- DETAILED LANDSCAPE PROPOSAL 6 OF 8
- DETAILED LANDSCAPE PROPOSAL 7 OF 8
- ARBORICULTURAL IMPACT ASSESSMENT
- BIODIVERSITY NET GAIN ASSESSMENT
- STATUTORY METRIC
- BASELINE HABITAT CONDITIONS ASSESSMENT
- SITE BOUNDARY PLAN
- SITE LOCATION PLAN
- EXISTING SITE LEVELS
- APPLICATION FORM
- DRAFT HEADS OF TERMS FOR S106
- WETLAND GENERAL ARRANGEMENT
- WETLAND GENERAL ARRANGEMENT DOWNSTREAM TAPER DETAILS
- (SUPERSEDED) DETAILED LANDSCAPE PROPOSAL 1 OF 8
- (SUPERSEDED) DETAILED LANDSCAPE PROPOSAL 2 OF 8
- (SUPERSEDED) DETAILED LANDSCAPE PROPOSAL 3 OF 8
- (SUPERSEDED) DETAILED LANDSCAPE PROPOSAL 4 OF 8
- (SUPERSEDED) DETAILED LANDSCAPE PROPOSAL 5 OF 8
- (SUPERSEDED) DETAILED LANDSCAPE PROPOSAL 6 OF 8
- (SUPERSEDED) DETAILED LANDSCAPE PROPOSAL 7 OF 8
- (SUPERSEDED) LANDSCAPE OVERVIEW 8 OF 8
- WETLAND GENERAL ARRANGEMENT INFILL AND INFLOW SECTIONS
- WETLAND GENERAL ARRANGEMENT WETLAND AND OUTFALL SECTIONS
- VISUALISATIONS PART 1
- VISUALISATIONS PART 2
- VISUALISATIONS PART 3
- POST-DEVELOPMENT HABITATS CONDITION ASSESSMENT
- PRELIMINARY ECOLOGICAL APPRAISAL
- HISTORIC ENVIRONMENT DESK-BASED ASSESSMENT
- HABITAT MANAGEMENT AND MONITORING PLAN PART 1
- HABITAT MANAGEMENT AND MONITORING PLAN PART 2
- STAVELEY SEWAGE TREATMENT WORKS GROUND ENGINEERING DESK STUDY REPORT
- STAVELEY STW GROUND ENGINEERING DESK STUDY REPORT
- FLOOD RISK ASSESSMENT
- APPENDIX A OPENDATA FLOOD MAPS
- FLOOD RISK ASSESSMENT PART B APPENDIX A- STAVELEY WETLAND TOPOGRAPHY
- FLOOD RISK ASSESSMENT PART B APPENDIX- STAVELEY WETLAND TOPOGRAPHY - DETAILED
- FLOOD RISK ASSESSMENT PART B APPENDIX A FLOOD MAPS
- FLOOD RISK ASSESSMENT PART C APPENDIX B- DEVELOPMENT PROPOSALS
- FLOOD RISK ASSESSMENT PART D APPENDIX C- MODEL TECHNICAL NOTE
- FLOOD RISK ASSESSMENT PART D APPENDIX C
- FLOOD RISK ASSESSMENT PART D APPENDIX C
- FLOOD RISK ASSESSMENT PART D APPENDIX C
- TREE CONSTRAINTS PLAN (TCP01) (ARBORICULTURAL SURVEY REPORT PART 2)
- ARBORICULTURAL SURVEY PART 3
- ARBORICULTURAL SURVEY PART 4
- ARBORICULTURAL SURVEY REPORT PART 5
- PLANNING DESIGN AND ACCESS STATEMENT
- COVER LETTER
- ARBORICULTURAL SURVEY REPORT
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Chesterfield for determination, against a statutory target of eight weeks. Over the last year Chesterfield decided full applications in a median of 168 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Land Lying To The West Of Hague Lane Chesterfield
Decision due ~11 Sep
Engineering works to facilitate the creation of a wetland, including channel creation, excavation works to the River Doe Lea embankment and associated works
Awaiting decision Full applications 97 docs -
Sewage Farm Unnamed Track From Hague Lane To Sewage Works Mastin Moor Derbyshire
EIA Screening Opinion for the development of a solar farm
Decided Outline 2 docs -
Sewage Farm Unnamed Track From Hague Lane To Sewage Works Mastin Moor Derbyshire
EIA Screening Opinion for the development of a solar farm
Decided Outline 2 docs
Other full applications
In Chesterfield
-
CHE/26/00769/FUL Awaiting decision
Cannon Mill Dock Walk Chesterfield Derbyshire S40 2AB
Change of use to office accommodation, external alterations and associated works
-
CHE/25/00783/FUL Refused
4 Station Road Barrow Hill Chesterfield Derbyshire S43 2NL
Erection of a rear dormer roof and further works to the rear, to facilitate change of use to form a separate ground floor shop and 2 upper floor flats
-
CHE/26/00054/FUL Decided
Field To The East Of Hundall Lane Old Whittington Chesterfield Derbyshire
Installation of a menage and extension to hardcore outside of existing stables
-
CHE/26/00749/FUL Awaiting decision
Barrow Hill Railway Centre Campbell Drive Barrow Hill Chesterfield Derbyshire S43 2PR
Alterations to roofing and walling, with repairs to surface water drainage system
-
CHE/26/00266/FUL Decided
6-22 Lordsmill Street Chesterfield Derbyshire S41 7RW
Change of use from warehouse, offices and retail to individual units comprising Use Class E commercial units and B8 warehousing and retention of external alterations