Planning application
Ellesmere Port Fire Station Wellington Road Ellesmere Port CH65 0EZ
Works: Extension Demolition Small domestic
Read from the description, not a valuation. How we read the register
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Part demolition of existing Fire Station. Single storey extension, erection of substation, installation of solar panels, and alterations to remaining site including installation of security fencing,
As published by the council, reference 26/02443/FUL
Application record
- Reference
- 26/02443/FUL
- Category
- Full applications
- Status
- Awaiting decision
- Received
- 4 Aug 2026
- Validated
- 28 Aug 2026
- Postcode
- CH65 0EZ
Timeline
Dates from the published record
-
4 Aug 2026
Received by Cheshire West and Chester
-
28 Aug 2026
Validated
Checked as complete and ready for consideration.
-
4 Sep 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 23 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Cheshire West and Chester took a median of 58 days over the applications it decided in the last year.
What happens while it is decided
The process from here
This application is with Cheshire West and Chester for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Stanney Lane Clinic & Family Service Building Stanney Lane Ellesmere Port CH65 9AE
90% historically approved · decision due ~30 Apr
Demolition of the redundant Stanney Lane Clinic and Park Family Centre buildings
Decided Demolition -
Ellesmere Port Library Civic Way Ellesmere Port Cheshire CH65 0BG
Proposed access ramp with removal of existing side emergency exist door and replacement with normal entrance and exist door
Granted Full applications 10 docs -
Ellesmere Port Library Civic Way Ellesmere Port CH65 0BG
Replacement of existing windows at Ellesmere Port Library (original Building)
Granted Full applications Windows or glazing 13 docs -
The Portal Wellington Road Ellesmere Port CH65 0BA
90% historically approved · decision due ~2 Jan
Erection of a flagpole outside of The Portal to allow the flying of various flags in Category 2 such as National flag, House flag, Rainbow flag, Specific award schemes, NHS flag etc. (Retrospective)
Decided Advertising -
Ellesmere Port Bus Station Wellington Road Ellesmere Port CH65 0BY
Demolition of existing ticket office and bus shelters and development of a three storey public services and office building and associated external public realm, landscaping, access, servicing, car and cycle parking areas
Granted Full applications Demolition 50 docs -
Ellesmere Port Bus Station Wellington Road Ellesmere Port CH65 0BY
Discharge of conditions 3 (Sustainable Urban Drainage), 5 (Land Contamination Remediation),13 (Construction Method Statement), 14 (Phasing of Demo/ Construction Traffic), 19 (Highways Works), 23 (Large Scale Drawings), 24 (North West Stairwell Design), 25 (BREEAM), 26 (Solar PV Energy Output Scheme), 29 (Local Employment and Procurement Scheme) on 19/02366/FUL
Granted Conditions 59 docs
Other full applications applications
In Cheshire West and Chester
-
26/01813/FUL Granted
25 Dublin Croft Great Sutton Ellesmere Port CH66 2TD
Two storey side extension with single storey front porch extension
-
26/01781/FUL Granted
Barnholt Norley Hall Farm Town Farm Lane Norley Northwich WA6 8NH
Single-storey front porch extension and installation of photovoltaic panels to the rear south-facing roof elevation.
-
26/01635/FUL Granted
26 Arrowcroft Road Guilden Sutton Chester CH3 7ES
Single storey rear/side extension
-
26/01833/FUL Granted
6 Oaklands Crescent Tattenhall Chester CH3 9QT
Two storey side extensions above existing garage and single storey rear extension and render to all walls.
-
26/02168/FUL Granted
31 Appleton Road Upton Chester CH2 1JH
Single storey rear extension