Skip to content
PlanIndex Get alerts
Menu

Planning application

Ellesmere Port Library Civic Way Ellesmere Port CH65 0BG

Granted Cheshire West and Chester 24/01070/FUL Full applications

Works: Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Replacement of existing windows at Ellesmere Port Library (original Building)

As published by the council, reference 24/01070/FUL

Application record

Reference
24/01070/FUL
Category
Full applications
Status
Approved
Decision
Approval
Received
15 Apr 2024
Validated
8 May 2024
Decided
12 Nov 2024
Ward
Central and Grange
Decision by
Delegated Decision
Postcode
CH65 0BG

Timeline

Dates from the published record

  1. 15 Apr 2024

    Received by Cheshire West and Chester

  2. 8 May 2024

    Validated

    Checked as complete and ready for consideration.

  3. 12 Nov 2024

    Decision issued: Approval

  4. 6 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

13 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Ellesmere Port Library Civic Way Ellesmere Port Cheshire CH65 0BG

    19/02388/FUL Submitted 24 Jun 2019 24m away

    Proposed access ramp with removal of existing side emergency exist door and replacement with normal entrance and exist door

    Granted Full applications 10 docs
  • The Portal Wellington Road Ellesmere Port CH65 0BA

    25/03517/ADV Submitted 7 Nov 2025 72m away

    90% historically approved · decision due ~2 Jan

    Erection of a flagpole outside of The Portal to allow the flying of various flags in Category 2 such as National flag, House flag, Rainbow flag, Specific award schemes, NHS flag etc. (Retrospective)

    Decided Advertising
  • Ellesmere Port Bus Station Wellington Road Ellesmere Port CH65 0BY

    19/03953/DEM Submitted 28 Oct 2019 80m away

    Demolition of former ticket office

    Granted Other Demolition 12 docs
  • First Floors of 5,7, 29,31and 33  Marina Walk Ellesmere Port CH65 0BJ

    25/03363/LDC Submitted 27 Oct 2025 80m away

    90% historically approved · decision due ~22 Dec

    Lawful development certificate for a proposed change of use from retail (Class E(a)) to indoor sport and recreation (Class E (d))

    Decided Lawful development
  • Ellesmere Port Bus Station Wellington Road Ellesmere Port CH65 0BY

    19/02366/FUL Submitted 21 Jun 2019 85m away

    Demolition of existing ticket office and bus shelters and development of a three storey public services and office building and associated external public realm, landscaping, access, servicing, car and cycle parking areas

    Granted Full applications Demolition 50 docs
  • Ellesmere Port Bus Station Wellington Road Ellesmere Port CH65 0BY

    20/03289/DIS Submitted 9 Sep 2020 85m away

    Discharge of conditions 3 (Sustainable Urban Drainage), 5 (Land Contamination Remediation),13 (Construction Method Statement), 14 (Phasing of Demo/ Construction Traffic), 19 (Highways Works), 23 (Large Scale Drawings), 24 (North West Stairwell Design), 25 (BREEAM), 26 (Solar PV Energy Output Scheme), 29 (Local Employment and Procurement Scheme) on 19/02366/FUL

    Granted Conditions 59 docs

In Cheshire West and Chester

  • 26/01813/FUL Granted

    25 Dublin Croft Great Sutton Ellesmere Port CH66 2TD

    Two storey side extension with single storey front porch extension

    15 Jun 2026 Full applications
  • 26/01781/FUL Granted

    Barnholt Norley Hall Farm Town Farm Lane Norley Northwich WA6 8NH

    Single-storey front porch extension and installation of photovoltaic panels to the rear south-facing roof elevation.

    11 Jun 2026 Full applications
  • 26/01635/FUL Granted

    26 Arrowcroft Road Guilden Sutton Chester CH3 7ES

    Single storey rear/side extension

    28 May 2026 Full applications
  • 26/01833/FUL Granted

    6 Oaklands Crescent Tattenhall Chester CH3 9QT

    Two storey side extensions above existing garage and single storey rear extension and render to all walls.

    16 Jun 2026 Full applications
  • 26/02168/FUL Granted

    31 Appleton Road Upton Chester CH2 1JH

    Single storey rear extension

    14 Jul 2026 Full applications