Proposal
Discharge of conditions 25 (operational noise - residential receptors) and 26 (operational noise - SPA receptors) of 24/00261/FUL
As published by the council, reference 26/02352/DIS
Application record
- Reference
- 26/02352/DIS
- Type
- Conditions
- Status
- Awaiting decision
- Received
- 27 Jul 2026
- Validated
- 27 Jul 2026
- Ward
- Gowy Rural
- Parish
- Ince
Site history
Applications at this address on the Cheshire West and Chester register
This site has had 3 applications since 2025: 1 approved, 0 refused.
-
26/02393/NMA Granted
Land At Protos (Ince Resource Recovery Park) Grinsome Road and Marsh Lane Ince
Non-material amendment to planning permission 24/00261/FUL - Amendment to the approved drawings listed at condition 2.
-
25/02684/DIS Decided
Land At Protos (Ince Resource Recovery Park) Grinsome Road and Marsh Lane Ince
Application to discharge condition 12 (Piling Risk Assessment) of planning permission 24/00261/FUL (Full planning permission for the construction and operation of a post-combustion Carbon Dioxide (CO2) Capture Facility).
Timeline
Dates from the published record
-
27 Jul 2026
Received by Cheshire West and Chester
-
11 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 21 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Cheshire West and Chester took a median of 56 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
4 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Cheshire West and Chester for determination, against a statutory target of eight weeks. Over the last year Cheshire West and Chester decided condition discharge and variation applications in a median of 78 days. More in our guide to how long planning decisions take.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Protos Ince Biomass Power Plant Marsh Lane Ince
92% historically approved · decision due ~17 Jul
Erection and operation of a Carbon Capture Plant to serve the Ince Bio Power facility
Awaiting decision Full applications 151 docs -
Ince Resource Recovery Park Grinsome Road Ellesmere Port Cheshire
Installation of 33kv underground electricity cables
Granted Full applications 23 docs -
Ince Bio Power Plant Marsh Lane Ince Chester
Erection of Part B8 (Storage) with laboratory and workshop and B1 (Office) building with additional parking, ancillary to Ince Bio Power Plant
Granted Full applications 19 docs -
Area 8 Ince Resource Recovery Park Grinsome Road Ellesmere Port
Amendments to 18/01543/S73 / APP/A0665/W/18/3213090 erection of an Energy from Waste Facility (up to 49MW) and associated development including access and landscaping at Protos (Plot 8)
Granted Amendments 29 docs -
Plot 8 Ince Resource Recovery Park Grinsome Road Ellesmere Port Cheshire
To confirm no objection to the Unilateral Undertaking/Legal Agreement (Application ref: 18/01543/S73, Appeal ref: PP/A0665/W/18/3213090)- Final Habitat Creation and Management Plan and that it can be approved
Granted Amendments 9 docs -
Plot 8 Ince Resource Recovery Park Grinsome Road Ellesmere Port
Amendment to 18/01543/S73 - Relocate bottom ash conveyor from north eastern external elevation of EFW Facility internally into the main building
Granted Amendments 24 docs
Other condition discharge and variation applications
In Cheshire West and Chester
-
26/02648/FUL Awaiting decision
Highgrove Kingswood Lane Saughall Chester CH1 6DE
Retrospective planning application for the retention and modification of rear dormer extension.
-
25/00084/DIS Granted
Land At Wrexham Road Chester
Application to discharge conditions 7 (sustainable drainage scheme) and 8 (foul drainage scheme) of planning permission 23/03377/FUL (Erection of 150 dwellings and provision of infrastructure including internal road layout, landscaping, childrens play area and associated works (Re-submission of 22/03064/FUL)
-
26/02224/DIS Granted
Moulton Methodist Church Main Road Moulton Winsford CW9 8PL
Discharge of conditions 1(start on site), 5 (window and door details), 6 (boundary treatments), 9 (cycle store), 12 (mitigation measures in Bat Survey) and 13 (bat boxes) of 24/03199/FUL
-
26/02207/S73 Granted
Land At Hoofield Hall Hoofield Lane Huxley Chester
Variation to condition 2 of planning permission 17/01865/FUL (Conversion of Cubicle building for dairy cattle to dwellinghouse) to allow for the installation of new apertures in the rear elevation
-
25/03835/S73 Granted
Gordale House and Oakroyd Chester High Road Neston CH64 8TF
Replacement of two dwellings - removal of condition 4 (Self and custom build housing statement) and addition of Biodiversity Net Gain, variation of condition 2 (approved plans) and variation of condition 3 (materials) of the planning permission 24/02671/FUL