Planning application
Protos Ince Biomass Power Plant Marsh Lane Ince
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Erection and operation of a Carbon Capture Plant to serve the Ince Bio Power facility
As published by the council, reference 26/01591/FUL
Application record
- Reference
- 26/01591/FUL
- Category
- Full applications
- Status
- Awaiting decision
- Received
- 22 May 2026
- Validated
- 22 May 2026
- Ward
- Gowy Rural
- Parish
- Ince
- Postcode
- CH2 4NR
Timeline
Dates from the published record
-
22 May 2026
Received by Cheshire West and Chester
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 17 July 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Cheshire West and Chester took a median of 56 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
151 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Cheshire West and Chester for determination, against a statutory target of eight weeks. Over the last year Cheshire West and Chester decided full applications in a median of 70 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Ince Resource Recovery Park Grinsome Road Ellesmere Port Cheshire
Installation of 33kv underground electricity cables
Granted Full applications 23 docs -
Ince Bio Power Plant Marsh Lane Ince Chester
Erection of Part B8 (Storage) with laboratory and workshop and B1 (Office) building with additional parking, ancillary to Ince Bio Power Plant
Granted Full applications 19 docs -
Land At Protos (Ince Resource Recovery Park) Grinsome Road and Marsh Lane Ince
97% historically approved · decision due ~21 Sep
Discharge of conditions 25 (operational noise - residential receptors) and 26 (operational noise - SPA receptors) of 24/00261/FUL
Awaiting decision Conditions 4 docs -
Area 8 Ince Resource Recovery Park Grinsome Road Ellesmere Port
Amendments to 18/01543/S73 / APP/A0665/W/18/3213090 erection of an Energy from Waste Facility (up to 49MW) and associated development including access and landscaping at Protos (Plot 8)
Granted Amendments 29 docs -
Plot 8 Ince Resource Recovery Park Grinsome Road Ellesmere Port Cheshire
To confirm no objection to the Unilateral Undertaking/Legal Agreement (Application ref: 18/01543/S73, Appeal ref: PP/A0665/W/18/3213090)- Final Habitat Creation and Management Plan and that it can be approved
Granted Amendments 9 docs -
Plot 8 Ince Resource Recovery Park Grinsome Road Ellesmere Port
Amendment to 18/01543/S73 - Relocate bottom ash conveyor from north eastern external elevation of EFW Facility internally into the main building
Granted Amendments 24 docs
Other full applications
In Cheshire West and Chester
-
26/00725/FUL Withdrawn
14 The Coppice Cuddington Northwich Cheshire CW8 2XF
Erection of additional storey to dwelling, alterations to windows and doors, and rendering the property.
-
26/01579/FUL Granted
42 Littler Lane Winsford CW7 2NF
Demolition of existing conservatory, erection of two storey side extension, alterations to windows and doors, to include external rendering and cladding
-
26/02251/FUL Refused
Sleepers Croft Ashton Road Delamere Northwich WA6 6PA
Single storey rear extension to replace existing Pergola.
-
26/01887/FUL Withdrawn
5 Wyndham Crescent Great Sutton Ellesmere Port CH66 4SN
Single storey rear and first floor side and rear extension
-
26/02273/FUL Granted
Tresco 14 Lawn Drive Upton Chester CH2 1ER
Demolition of conservatory and construction of single-storey rear extension together with conversion of garage to ancillary accommodation, including an increase in the height of the garage roof. Render to existing front extensions, rear extension and part of garage conversion.