Skip to content
PlanIndex Get alerts
Menu

Planning application

Progroup Ltd South Road Stanlow Ellesmere Port CH65 4LD

Awaiting decision Cheshire West and Chester 20/02370/NMA Amendment

Relates to 19/01947/REM

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Non Material Amendment to 19/01947/REM (Increase in lower section of building height by 500mm to 11.5m, adjustment to external landscaping layout near building to the north elevation, omission of substation, adjustment to location of smoking and cycle shelters, and timber fence enclosure added to north west of building and front of building)

As published by the council, reference 20/02370/NMA

Application record

Reference
20/02370/NMA
Type
Amendment
Status
Awaiting decision
Received
7 Jul 2020
Validated
7 Jul 2020
Ward
Gowy Rural
Postcode
CH65 4LD

Site history

Applications at this address on the Cheshire West and Chester register

This site has had 5 applications since 2020: 3 approved, 0 refused.

  • 20/02670/DIS Granted

    Progroup Ltd South Road Stanlow Ellesmere Port CH65 4LD

    Discharge of condition 3 for Phase 1 only (landscaping) on planning permission 19/01947/REM

    Decided 2 Dec 2020 Conditions
  • 20/02102/DIS Granted

    Progroup Ltd South Road Stanlow Ellesmere Port CH65 4LD

    Discharge of Condition 6 (Acoustic Report) of 19/01947/REM (Erection of 2 manufacturing buildings (phase 2) with production areas, offices, high bay warehouse, vehicle loading building with associated parking hardstanding, landscaping, vehicle link to Phase 1 and construction of Conveyor bridge link to phase 1)

    Decided 11 Nov 2021 Conditions
  • 20/00176/S73 Withdrawn

    Progroup Ltd South Road Stanlow Ellesmere Port CH65 4LD

    Variation of conditions to the planning permission 17/04443/S73 (and the associated reserved matters approval 19/01947/REM) for the construction of a manufacturing facility (2 manufacturing buildings (phase 2) with production areas, offices, high bay warehouse, vehicle loading building with associated parking hardstanding, landscaping, vehicle link to Phase 1 and construction of Conveyor bridge link to phase 1) (variation of construction work start hours from 8:00am to 7:30am (Mondays to Saturdays))

    Decided 24 Jun 2020 Amendments
  • 20/00037/DIS Granted

    Progroup Ltd South Road Stanlow Ellesmere Port CH65 4LD

    Discharge of Condition 17 (Piling) of 19/01947/REM (Erection of 2 manufacturing buildings (phase 2) with production areas, offices, high bay warehouse, vehicle loading building with associated parking hardstanding, landscaping, vehicle link to Phase 1 and construction of Conveyor bridge link to phase 1 (Following 17/04443/S73))

    Decided 21 Feb 2020 Conditions

Timeline

Dates from the published record

  1. 7 Jul 2020

    Received by Cheshire West and Chester

  2. 13 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 1 September 2020, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Cheshire West and Chester took a median of 58 days over the applications it decided in the last year.

Cases linked to this one on the register

  • 19/01947/REM Granted

    Site of Former Cabot Carbon Ltd Lees Lane Ellesmere Port Cheshire

    Erection of 2 manufacturing buildings (phase 2) with production areas, offices, high bay warehouse, vehicle loading building with associated parking hardstanding, landscaping, vehicle link to Phase 1 and construction of Conveyor bridge link to phase 1 (Following 17/04443/S73)

    Decided 13 Nov 2019 Reserved matters

Documents

Plans, drawings, consultee responses and the officer's report

5 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Cheshire West and Chester for determination, against a statutory target of eight weeks. Over the last year Cheshire West and Chester decided amendment applications in a median of 93 days. More in our guide to how long planning decisions take.

About amendment applications

An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Prowell Ltd South Road Stanlow Ellesmere Port CH65 4LY

    20/00171/DIS Submitted 16 Jan 2020 0m away

    Discharge of Condition 10 (Drainage) of 19/01947/REM (Erection of 2 manufacturing buildings (phase 2) with production areas, offices, high bay warehouse, vehicle loading building with associated parking hardstanding, landscaping, vehicle link to Phase 1 and construction of Conveyor bridge link to phase 1 (Following 17/04443/S73))

    Granted Conditions 15 docs
  • Progroup Ltd South Road Stanlow Ellesmere Port CH65 4LD

    20/02670/DIS Submitted 27 Jul 2020 0m away

    Discharge of condition 3 for Phase 1 only (landscaping) on planning permission 19/01947/REM

    Granted Conditions 11 docs
  • Progroup Ltd South Road Stanlow Ellesmere Port CH65 4LD

    20/02102/DIS Submitted 19 Jun 2020 0m away

    Discharge of Condition 6 (Acoustic Report) of 19/01947/REM (Erection of 2 manufacturing buildings (phase 2) with production areas, offices, high bay warehouse, vehicle loading building with associated parking hardstanding, landscaping, vehicle link to Phase 1 and construction of Conveyor bridge link to phase 1)

    Granted Conditions 8 docs
  • Progroup Ltd South Road Stanlow Ellesmere Port CH65 4LD

    20/00176/S73 Submitted 17 Jan 2020 0m away

    Variation of conditions to the planning permission 17/04443/S73 (and the associated reserved matters approval 19/01947/REM) for the construction of a manufacturing facility (2 manufacturing buildings (phase 2) with production areas, offices, high bay warehouse, vehicle loading building with associated parking hardstanding, landscaping, vehicle link to Phase 1 and construction of Conveyor bridge link to phase 1) (variation of construction work start hours from 8:00am to 7:30am (Mondays to Saturdays))

    Withdrawn Amendments 6 docs
  • Site of Former Cabot Carbon Ltd Lees Lane Ellesmere Port Cheshire

    19/01947/REM Submitted 20 May 2019 0m away

    Erection of 2 manufacturing buildings (phase 2) with production areas, offices, high bay warehouse, vehicle loading building with associated parking hardstanding, landscaping, vehicle link to Phase 1 and construction of Conveyor bridge link to phase 1 (Following 17/04443/S73)

    Granted Reserved matters 57 docs
  • Progroup Ltd South Road Stanlow Ellesmere Port CH65 4LD

    20/00037/DIS Submitted 2 Jan 2020 0m away

    Discharge of Condition 17 (Piling) of 19/01947/REM (Erection of 2 manufacturing buildings (phase 2) with production areas, offices, high bay warehouse, vehicle loading building with associated parking hardstanding, landscaping, vehicle link to Phase 1 and construction of Conveyor bridge link to phase 1 (Following 17/04443/S73))

    Granted Conditions 4 docs

In Cheshire West and Chester

  • 26/02326/NMA Granted

    269 Chester Road Hartford Northwich CW8 1LP

    Non material amendment to planning permission 25/02713/FUL, amendment to the approved extension roof design.

    24 Jul 2026 Amendments
  • 26/02120/FUL Granted

    79 High Street Frodsham WA6 7AN

    Erection of porch (retrospective)

    8 Jul 2026 Amendments
  • 26/02674/NMA Decided

    Mecca Bingo Hall Brookdale Place Chester CH1 3DY

    Non material amendment to 23/03823/FUL (to reconfigure the fixed and opening panes of the doorway and changes to steps and ramped access)

    24 Aug 2026 Amendments
  • 26/00401/FUL Granted

    Sewage Disposal Works Roddy Lane Kingsley Frodsham WA6 8HX

    Installation of MCC Kiosk on the existing Kingsley WwTW and extension to Kingsley WwTW to accommodate new chemical dosing units and change of use to operational land (Part retrospective)

    6 Feb 2026 Amendments
  • 26/01788/FUL Granted

    15 Pear Tree Drive Wincham Northwich CW9 6EZ

    Garage conversion and erection a pitched roof to existing attached garage. Pitched roof over front porch and front extension (retrospective).

    12 Jun 2026 Amendments