Site of Former Cabot Carbon Ltd Lees Lane Ellesmere Port Cheshire

Granted Cheshire West and Chester 19/01947/REM Approval of Reserved Matters

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of 2 manufacturing buildings (phase 2) with production areas, offices, high bay warehouse, vehicle loading building with associated parking hardstanding, landscaping, vehicle link to Phase 1 and construction of Conveyor bridge link to phase 1 (Following 17/04443/S73)

As published by the council, reference 19/01947/REM

Application record

Reference
19/01947/REM
Type
Approval of Reserved Matters
Status
Approved
Decision
Approval
Received
20 May 2019
Validated
20 May 2019
Decided
13 Nov 2019
Ward
Gowy Rural
Decision by
Delegated Decision

Timeline

Dates from the published record

  1. 20 May 2019

    Received by Cheshire West and Chester

  2. 13 Nov 2019

    Decision issued: Approval

  3. 6 Sep 2026

    Added to PlanIndex

Cases linked to this one on the register

6 later applications on the register refer to this one:

  • 20/02670/DIS Granted

    Progroup Ltd South Road Stanlow Ellesmere Port CH65 4LD

    Discharge of condition 3 for Phase 1 only (landscaping) on planning permission 19/01947/REM

    Decided 2 Dec 2020 Conditions
  • 20/02370/NMA Awaiting decision

    Progroup Ltd South Road Stanlow Ellesmere Port CH65 4LD

    Non Material Amendment to 19/01947/REM (Increase in lower section of building height by 500mm to 11.5m, adjustment to external landscaping layout near building to the north elevation, omission of substation, adjustment to location of smoking and cycle shelters, and timber fence enclosure added to north west of building and front of building)

    Submitted 7 Jul 2020 Amendments
  • 20/02102/DIS Granted

    Progroup Ltd South Road Stanlow Ellesmere Port CH65 4LD

    Discharge of Condition 6 (Acoustic Report) of 19/01947/REM (Erection of 2 manufacturing buildings (phase 2) with production areas, offices, high bay warehouse, vehicle loading building with associated parking hardstanding, landscaping, vehicle link to Phase 1 and construction of Conveyor bridge link to phase 1)

    Decided 11 Nov 2021 Conditions
  • 20/00176/S73 Withdrawn

    Progroup Ltd South Road Stanlow Ellesmere Port CH65 4LD

    Variation of conditions to the planning permission 17/04443/S73 (and the associated reserved matters approval 19/01947/REM) for the construction of a manufacturing facility (2 manufacturing buildings (phase 2) with production areas, offices, high bay warehouse, vehicle loading building with associated parking hardstanding, landscaping, vehicle link to Phase 1 and construction of Conveyor bridge link to phase 1) (variation of construction work start hours from 8:00am to 7:30am (Mondays to Saturdays))

    Decided 24 Jun 2020 Amendments
  • 20/00171/DIS Granted

    Prowell Ltd South Road Stanlow Ellesmere Port CH65 4LY

    Discharge of Condition 10 (Drainage) of 19/01947/REM (Erection of 2 manufacturing buildings (phase 2) with production areas, offices, high bay warehouse, vehicle loading building with associated parking hardstanding, landscaping, vehicle link to Phase 1 and construction of Conveyor bridge link to phase 1 (Following 17/04443/S73))

    Decided 11 Nov 2021 Conditions
  • 20/00037/DIS Granted

    Progroup Ltd South Road Stanlow Ellesmere Port CH65 4LD

    Discharge of Condition 17 (Piling) of 19/01947/REM (Erection of 2 manufacturing buildings (phase 2) with production areas, offices, high bay warehouse, vehicle loading building with associated parking hardstanding, landscaping, vehicle link to Phase 1 and construction of Conveyor bridge link to phase 1 (Following 17/04443/S73))

    Decided 21 Feb 2020 Conditions

Documents

Plans, drawings, consultee responses and the officer's report

57 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Cheshire West and Chester granted permission on 13 November 2019, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About reserved matters applications

A reserved matters application fills in the detail held back from an earlier outline permission, judged against that permission rather than the principle of development. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Prowell Ltd South Road Stanlow Ellesmere Port CH65 4LY

    20/00171/DIS Submitted 16 Jan 2020 0m away

    Discharge of Condition 10 (Drainage) of 19/01947/REM (Erection of 2 manufacturing buildings (phase 2) with production areas, offices, high bay warehouse, vehicle loading building with associated parking hardstanding, landscaping, vehicle link to Phase 1 and construction of Conveyor bridge link to phase 1 (Following 17/04443/S73))

    Granted Conditions 15 docs
  • Progroup Ltd South Road Stanlow Ellesmere Port CH65 4LD

    20/02670/DIS Submitted 27 Jul 2020 0m away

    Discharge of condition 3 for Phase 1 only (landscaping) on planning permission 19/01947/REM

    Granted Conditions 11 docs
  • Progroup Ltd South Road Stanlow Ellesmere Port CH65 4LD

    20/02370/NMA Submitted 7 Jul 2020 0m away

    83% historically approved · decision due ~1 Sep

    Non Material Amendment to 19/01947/REM (Increase in lower section of building height by 500mm to 11.5m, adjustment to external landscaping layout near building to the north elevation, omission of substation, adjustment to location of smoking and cycle shelters, and timber fence enclosure added to north west of building and front of building)

    Awaiting decision Amendments 5 docs
    Small domestic
  • Progroup Ltd South Road Stanlow Ellesmere Port CH65 4LD

    20/02102/DIS Submitted 19 Jun 2020 0m away

    Discharge of Condition 6 (Acoustic Report) of 19/01947/REM (Erection of 2 manufacturing buildings (phase 2) with production areas, offices, high bay warehouse, vehicle loading building with associated parking hardstanding, landscaping, vehicle link to Phase 1 and construction of Conveyor bridge link to phase 1)

    Granted Conditions 8 docs
  • Progroup Ltd South Road Stanlow Ellesmere Port CH65 4LD

    20/00176/S73 Submitted 17 Jan 2020 0m away

    Variation of conditions to the planning permission 17/04443/S73 (and the associated reserved matters approval 19/01947/REM) for the construction of a manufacturing facility (2 manufacturing buildings (phase 2) with production areas, offices, high bay warehouse, vehicle loading building with associated parking hardstanding, landscaping, vehicle link to Phase 1 and construction of Conveyor bridge link to phase 1) (variation of construction work start hours from 8:00am to 7:30am (Mondays to Saturdays))

    Withdrawn Amendments 6 docs
  • Progroup Ltd South Road Stanlow Ellesmere Port CH65 4LD

    20/00037/DIS Submitted 2 Jan 2020 0m away

    Discharge of Condition 17 (Piling) of 19/01947/REM (Erection of 2 manufacturing buildings (phase 2) with production areas, offices, high bay warehouse, vehicle loading building with associated parking hardstanding, landscaping, vehicle link to Phase 1 and construction of Conveyor bridge link to phase 1 (Following 17/04443/S73))

    Granted Conditions 4 docs

In Cheshire West and Chester

  • 25/02029/REM Awaiting decision

    The Stables Lees Lane Little Neston Neston CH64 7TH

    Erection of 14 dwellings with associated parking, landscaping and infrastructure

    1 Jul 2025 Reserved matters
  • 20/02555/REM Granted

    Land At Corner of Wharton Road Roundabout New Road Winsford

    Erection of 1no. 3 storey apartment complex consisting of 27no. affordable units, with parking and associated landscaping

    20 Jul 2020 Reserved matters
  • 19/03094/REM Granted

    Land Off Rilshaw Lane Winsford

    Approval of Reserved Matters (Landscaping) to outline permission 14/01266/OUT (appeal ref: APP/A0665/A/14/2229269) Residential development of up to 215 dwellings, public open space with recreational facilities, site access, associated highways and infrastructure works)

    13 Aug 2019 Reserved matters
  • 19/04504/REM Granted

    Land At Sutton New Hall Farm Ledsham Road Little Sutton Ellesmere Port Cheshire

    Reserved matters application for 313 dwellings forming part of phases 4 and 5 and associated infrastructure and open space pursuant to outline application 12/02091/OUT (for a total of up to 2000 dwellings and associated development)

    18 Dec 2019 Reserved matters
  • 19/04389/REM Granted

    Land At Sutton New Hall Farm Ledsham Road Little Sutton Ellesmere Port Cheshire

    Reserved Matters application for 256 dwellings forming part of Phase 3 of the development, alongside associated infrastructure and open space pursuant to outline planning permission 12/02091/OUT (for a total of up to 2000 dwellings and associated development)

    9 Dec 2019 Reserved matters