Planning application
Site of Former Cabot Carbon Ltd Lees Lane Ellesmere Port Cheshire
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of 2 manufacturing buildings (phase 2) with production areas, offices, high bay warehouse, vehicle loading building with associated parking hardstanding, landscaping, vehicle link to Phase 1 and construction of Conveyor bridge link to phase 1 (Following 17/04443/S73)
As published by the council, reference 19/01947/REM
Application record
- Reference
- 19/01947/REM
- Type
- Approval of Reserved Matters
- Status
- Approved
- Decision
- Approval
- Received
- 20 May 2019
- Validated
- 20 May 2019
- Decided
- 13 Nov 2019
- Ward
- Gowy Rural
- Decision by
- Delegated Decision
Timeline
Dates from the published record
-
20 May 2019
Received by Cheshire West and Chester
-
13 Nov 2019
Decision issued: Approval
-
6 Sep 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
6 later applications on the register refer to this one:
-
20/02670/DIS Granted
Progroup Ltd South Road Stanlow Ellesmere Port CH65 4LD
Discharge of condition 3 for Phase 1 only (landscaping) on planning permission 19/01947/REM
-
20/02370/NMA Awaiting decision
Progroup Ltd South Road Stanlow Ellesmere Port CH65 4LD
Non Material Amendment to 19/01947/REM (Increase in lower section of building height by 500mm to 11.5m, adjustment to external landscaping layout near building to the north elevation, omission of substation, adjustment to location of smoking and cycle shelters, and timber fence enclosure added to north west of building and front of building)
-
20/02102/DIS Granted
Progroup Ltd South Road Stanlow Ellesmere Port CH65 4LD
Discharge of Condition 6 (Acoustic Report) of 19/01947/REM (Erection of 2 manufacturing buildings (phase 2) with production areas, offices, high bay warehouse, vehicle loading building with associated parking hardstanding, landscaping, vehicle link to Phase 1 and construction of Conveyor bridge link to phase 1)
-
20/00176/S73 Withdrawn
Progroup Ltd South Road Stanlow Ellesmere Port CH65 4LD
Variation of conditions to the planning permission 17/04443/S73 (and the associated reserved matters approval 19/01947/REM) for the construction of a manufacturing facility (2 manufacturing buildings (phase 2) with production areas, offices, high bay warehouse, vehicle loading building with associated parking hardstanding, landscaping, vehicle link to Phase 1 and construction of Conveyor bridge link to phase 1) (variation of construction work start hours from 8:00am to 7:30am (Mondays to Saturdays))
-
20/00171/DIS Granted
Prowell Ltd South Road Stanlow Ellesmere Port CH65 4LY
Discharge of Condition 10 (Drainage) of 19/01947/REM (Erection of 2 manufacturing buildings (phase 2) with production areas, offices, high bay warehouse, vehicle loading building with associated parking hardstanding, landscaping, vehicle link to Phase 1 and construction of Conveyor bridge link to phase 1 (Following 17/04443/S73))
-
20/00037/DIS Granted
Progroup Ltd South Road Stanlow Ellesmere Port CH65 4LD
Discharge of Condition 17 (Piling) of 19/01947/REM (Erection of 2 manufacturing buildings (phase 2) with production areas, offices, high bay warehouse, vehicle loading building with associated parking hardstanding, landscaping, vehicle link to Phase 1 and construction of Conveyor bridge link to phase 1 (Following 17/04443/S73))
Documents
Plans, drawings, consultee responses and the officer's report
57 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Cheshire West and Chester granted permission on 13 November 2019, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About reserved matters applications
A reserved matters application fills in the detail held back from an earlier outline permission, judged against that permission rather than the principle of development. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Prowell Ltd South Road Stanlow Ellesmere Port CH65 4LY
Discharge of Condition 10 (Drainage) of 19/01947/REM (Erection of 2 manufacturing buildings (phase 2) with production areas, offices, high bay warehouse, vehicle loading building with associated parking hardstanding, landscaping, vehicle link to Phase 1 and construction of Conveyor bridge link to phase 1 (Following 17/04443/S73))
Granted Conditions 15 docs -
Progroup Ltd South Road Stanlow Ellesmere Port CH65 4LD
Discharge of condition 3 for Phase 1 only (landscaping) on planning permission 19/01947/REM
Granted Conditions 11 docs -
Progroup Ltd South Road Stanlow Ellesmere Port CH65 4LD
83% historically approved · decision due ~1 Sep
Non Material Amendment to 19/01947/REM (Increase in lower section of building height by 500mm to 11.5m, adjustment to external landscaping layout near building to the north elevation, omission of substation, adjustment to location of smoking and cycle shelters, and timber fence enclosure added to north west of building and front of building)
Awaiting decision Amendments 5 docsSmall domestic -
Progroup Ltd South Road Stanlow Ellesmere Port CH65 4LD
Discharge of Condition 6 (Acoustic Report) of 19/01947/REM (Erection of 2 manufacturing buildings (phase 2) with production areas, offices, high bay warehouse, vehicle loading building with associated parking hardstanding, landscaping, vehicle link to Phase 1 and construction of Conveyor bridge link to phase 1)
Granted Conditions 8 docs -
Progroup Ltd South Road Stanlow Ellesmere Port CH65 4LD
Variation of conditions to the planning permission 17/04443/S73 (and the associated reserved matters approval 19/01947/REM) for the construction of a manufacturing facility (2 manufacturing buildings (phase 2) with production areas, offices, high bay warehouse, vehicle loading building with associated parking hardstanding, landscaping, vehicle link to Phase 1 and construction of Conveyor bridge link to phase 1) (variation of construction work start hours from 8:00am to 7:30am (Mondays to Saturdays))
Withdrawn Amendments 6 docs -
Progroup Ltd South Road Stanlow Ellesmere Port CH65 4LD
Discharge of Condition 17 (Piling) of 19/01947/REM (Erection of 2 manufacturing buildings (phase 2) with production areas, offices, high bay warehouse, vehicle loading building with associated parking hardstanding, landscaping, vehicle link to Phase 1 and construction of Conveyor bridge link to phase 1 (Following 17/04443/S73))
Granted Conditions 4 docs
Other reserved matters applications
In Cheshire West and Chester
-
25/02029/REM Awaiting decision
The Stables Lees Lane Little Neston Neston CH64 7TH
Erection of 14 dwellings with associated parking, landscaping and infrastructure
-
20/02555/REM Granted
Land At Corner of Wharton Road Roundabout New Road Winsford
Erection of 1no. 3 storey apartment complex consisting of 27no. affordable units, with parking and associated landscaping
-
19/03094/REM Granted
Land Off Rilshaw Lane Winsford
Approval of Reserved Matters (Landscaping) to outline permission 14/01266/OUT (appeal ref: APP/A0665/A/14/2229269) Residential development of up to 215 dwellings, public open space with recreational facilities, site access, associated highways and infrastructure works)
-
19/04504/REM Granted
Land At Sutton New Hall Farm Ledsham Road Little Sutton Ellesmere Port Cheshire
Reserved matters application for 313 dwellings forming part of phases 4 and 5 and associated infrastructure and open space pursuant to outline application 12/02091/OUT (for a total of up to 2000 dwellings and associated development)
-
19/04389/REM Granted
Land At Sutton New Hall Farm Ledsham Road Little Sutton Ellesmere Port Cheshire
Reserved Matters application for 256 dwellings forming part of Phase 3 of the development, alongside associated infrastructure and open space pursuant to outline planning permission 12/02091/OUT (for a total of up to 2000 dwellings and associated development)