Skip to content
PlanIndex Get alerts
Menu

Planning application

Chapel Farm, Luton Road, Chalton, Luton, LU4 9UJ

Awaiting decision Central Bedfordshire CB/25/03326/FULL Full Application

Works: Demolition

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Demolition of farm buildings, construction of a Gospel Hall, community orchard, access, car parking, attenuation basin and landscaping

As published by the council, reference CB/25/03326/FULL

Application record

Reference
CB/25/03326/FULL
Type
Full Application
Status
Pending
Received
17 Oct 2025
Validated
24 Nov 2025
Parish
Chalton
Postcode
LU4 9UJ

Site history

Applications at this address on the Central Bedfordshire register

This site has had 2 applications since 2023: 1 approved, 0 refused.

  • CB/23/01230/DOC Granted

    Chapel Farm, Luton Road, Chalton, Luton, LU4 9UJ

    Discharge of Condition(s) 7 and 8 against planning permission CB/21/04143/VOC (Variation of condition 10 of planning permission CB/18/01795/FULL (Proposed energy storage facility to provide energy balancing services to the National Grid) New proposal: Revised plan.)

    Decided 5 May 2023 Conditions

Timeline

Dates from the published record

  1. 17 Oct 2025

    Received by Central Bedfordshire

  2. 24 Nov 2025

    Validated

    Checked as complete and ready for consideration.

  3. 23 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 19 January 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Central Bedfordshire took a median of 71 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

178 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Central Bedfordshire for determination, against a statutory target of eight weeks. Over the last year Central Bedfordshire decided full applications in a median of 80 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Land adj. to National Grid's Sundon Substation, Water End Lane, Chalton, LU4 9UJ

    CB/24/03447/DOC Submitted 28 Nov 2024 50 yards away

    Discharge of Condition 7 against planning permission ref. CB/21/02829/FULL (Battery storage development, components, new underground cabling, access tracks, GRP substation and associated works.)

    Granted Conditions 3 docs
  • Land Adjacent to National Grid Sundon Substation, Water End Lane, Chalton, LU4 9UJ

    CB/23/01085/DOC Submitted 30 Mar 2023 50 yards away

    Discharge of Condition(s) 3 and 12 against planning permission CB/21/02829/FULL (Battery storage development, components, new underground cabling, access tracks, GRP substation and associated works.) Cond 3 Biodiversity Method Statement and Cond 12 Access Point.

    Granted Conditions 8 docs
  • Former Pumping Station at Chapel Farm, Luton Road, Chalton, Luton, LU4 9UJ

    CB/24/02919/FULL Submitted 9 Oct 2024 50 yards away

    Demolition of the existing building and the change of use of the land to provide EV parking spaces and associated works.

    Withdrawn Full applications Demolition 13 docs
  • Chapel Farm, Luton Road, Chalton, Luton, LU4 9UJ

    CB/23/01230/DOC Submitted 12 Apr 2023 50 yards away

    Discharge of Condition(s) 7 and 8 against planning permission CB/21/04143/VOC (Variation of condition 10 of planning permission CB/18/01795/FULL (Proposed energy storage facility to provide energy balancing services to the National Grid) New proposal: Revised plan.)

    Granted Conditions 1 doc
  • Chalton Lower School, Luton Road, Chalton, Luton, LU4 9UJ

    CB/24/02608/REG3 Submitted 5 Sep 2024 50 yards away

    Retention of double classroom, temporary unit.

    Granted Other 9 docs
  • 53 Luton Road, Chalton, Luton, LU4 9UJ

    CB/26/02864/FULL Submitted 16 Sep 2026 50 yards away

    82% historically approved · decision due ~12 Nov

    Rebuild of gable end wall (north east elevation) new bathroom vents and repairs to external timber framing, painted brick infills and Internal beams

    Awaiting decision Full applications 42 docs

In Central Bedfordshire

  • 107 Thillans, Cranfield, Bedford, MK43 0WP

    Single storey rear and side extensions with rooflights

    Received 4 Aug, published by the council 27 Aug 2026 Full applications
  • 39 Church Road, Totternhoe, Dunstable, LU6 1RE

    Removal of conservatory, replaced with single storey rear extension and rooflight, garage conversion, replace existing hanging wall tiles and fenestration changes

    Received 7 Aug, published by the council 27 Aug 2026 Full applications
  • 4 Bedford Road, Barton-le-Clay, Bedford, MK45 4JU

    Single storey rear extension

    Received 20 Jul, published by the council 18 Aug 2026 Full applications
  • 16 Parmiter Way, Ampthill, Bedford, MK45 2RQ

    Single storey side/rear extension with rooflight and partial garage conversion. Alterations to fenestration.

    Received 28 Jul, published by the council 28 Aug 2026 Full applications
  • 33 Staveley Road, Dunstable, LU6 3QQ

    Garage conversion, with insertion of a front window and increased roof height

    Received 22 Jun, published by the council 27 Aug 2026 Full applications