Skip to content
PlanIndex Get alerts
Menu

Planning application

Former Pumping Station at Chapel Farm, Luton Road, Chalton, Luton, LU4 9UJ

Withdrawn Central Bedfordshire CB/24/02919/FULL Full Application

Works: Demolition

Withdrawn before a decision, so it carries no planning weight. A revised scheme can be submitted at any time.

Proposal

Demolition of the existing building and the change of use of the land to provide EV parking spaces and associated works.

As published by the council, reference CB/24/02919/FULL

Application record

Reference
CB/24/02919/FULL
Type
Full Application
Status
Withdrawn
Decision
Withdrawn As published: Application Withdrawn
Received
9 Oct 2024
Validated
18 Oct 2024
Decided
20 Nov 2024
Parish
Chalton
Postcode
LU4 9UJ

Timeline

Dates from the published record

  1. 9 Oct 2024

    Received by Central Bedfordshire

  2. 18 Oct 2024

    Validated

    Checked as complete and ready for consideration.

  3. 20 Nov 2024

    Decision issued: Application Withdrawn

  4. 28 Jul 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

13 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What withdrawal means

The applicant withdrew this application before Central Bedfordshire decided it, and is free to submit a revised scheme at any time. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Land adj. to National Grid's Sundon Substation, Water End Lane, Chalton, LU4 9UJ

    CB/24/03447/DOC Submitted 28 Nov 2024 50 yards away

    Discharge of Condition 7 against planning permission ref. CB/21/02829/FULL (Battery storage development, components, new underground cabling, access tracks, GRP substation and associated works.)

    Granted Conditions 3 docs
  • Chapel Farm, Luton Road, Chalton, Luton, LU4 9UJ

    CB/25/03326/FULL Submitted 17 Oct 2025 50 yards away

    82% historically approved · decision due ~19 Jan

    Demolition of farm buildings, construction of a Gospel Hall, community orchard, access, car parking, attenuation basin and landscaping

    Awaiting decision Full applications Demolition 178 docs
  • Land Adjacent to National Grid Sundon Substation, Water End Lane, Chalton, LU4 9UJ

    CB/23/01085/DOC Submitted 30 Mar 2023 50 yards away

    Discharge of Condition(s) 3 and 12 against planning permission CB/21/02829/FULL (Battery storage development, components, new underground cabling, access tracks, GRP substation and associated works.) Cond 3 Biodiversity Method Statement and Cond 12 Access Point.

    Granted Conditions 8 docs
  • Chapel Farm, Luton Road, Chalton, Luton, LU4 9UJ

    CB/23/01230/DOC Submitted 12 Apr 2023 50 yards away

    Discharge of Condition(s) 7 and 8 against planning permission CB/21/04143/VOC (Variation of condition 10 of planning permission CB/18/01795/FULL (Proposed energy storage facility to provide energy balancing services to the National Grid) New proposal: Revised plan.)

    Granted Conditions 1 doc
  • Chalton Lower School, Luton Road, Chalton, Luton, LU4 9UJ

    CB/24/02608/REG3 Submitted 5 Sep 2024 50 yards away

    Retention of double classroom, temporary unit.

    Granted Other 9 docs
  • 53 Luton Road, Chalton, Luton, LU4 9UJ

    CB/26/02864/FULL Submitted 16 Sep 2026 50 yards away

    82% historically approved · decision due ~12 Nov

    Rebuild of gable end wall (north east elevation) new bathroom vents and repairs to external timber framing, painted brick infills and Internal beams

    Awaiting decision Full applications 42 docs

In Central Bedfordshire

  • 107 Thillans, Cranfield, Bedford, MK43 0WP

    Single storey rear and side extensions with rooflights

    Received 4 Aug, published by the council 27 Aug 2026 Full applications
  • 39 Church Road, Totternhoe, Dunstable, LU6 1RE

    Removal of conservatory, replaced with single storey rear extension and rooflight, garage conversion, replace existing hanging wall tiles and fenestration changes

    Received 7 Aug, published by the council 27 Aug 2026 Full applications
  • 4 Bedford Road, Barton-le-Clay, Bedford, MK45 4JU

    Single storey rear extension

    Received 20 Jul, published by the council 18 Aug 2026 Full applications
  • 16 Parmiter Way, Ampthill, Bedford, MK45 2RQ

    Single storey side/rear extension with rooflight and partial garage conversion. Alterations to fenestration.

    Received 28 Jul, published by the council 28 Aug 2026 Full applications
  • 33 Staveley Road, Dunstable, LU6 3QQ

    Garage conversion, with insertion of a front window and increased roof height

    Received 22 Jun, published by the council 27 Aug 2026 Full applications