Skip to content
PlanIndex Get alerts
Menu

Planning application

Newnham College, Kennedy Sidgwick Avenue Cambridge Cambridgeshire CB3 9DF

Awaiting decision Cambridge 26/02688/FUL Full Application

Works: Windows or glazing

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Refurbishment, retrofit and decarbonisation of the Kennedy Building. Internal alterations to the Kennedy Building to increase the number of office spaces, re-provide wcs and gyp rooms, remove, partially replace and alter the stair circulation, improve accessibility on the ground floor and within the Newnham corridor, improve building services and fire safety. Retrofit works include making improvements to the building fabric including air-tightness, windows, doors, walls, roofs, floors and provision of mechanical ventilation with heat recovery as well as fabric repairs as part of general building maintenance. Removal of the existing plant room and replacement with a new plant room to contain the plant required to decarbonise the Kennedy building, including air source heat pumps and reinstate plant to serve West Clough.

As published by the council, reference 26/02688/FUL

Application record

Reference
26/02688/FUL
Type
Full Application
Status
Awaiting decision
Received
15 Jul 2026
Validated
15 Jul 2026
Ward
Newnham
Postcode
CB3 9DF

Site history

Applications at this address on the Cambridge register

This site has had 2 applications since 2026.

  • 26/02689/LBC Awaiting decision

    Newnham College, Kennedy Sidgwick Avenue Cambridge Cambridgeshire CB3 9DF

    Refurbishment, retrofit and decarbonisation of the Kennedy Building. Internal alterations to the Kennedy Building to increase the number of office spaces, re-provide wcs and gyp rooms, remove, partially replace and alter the stair circulation, improve accessibility on the ground floor and within the Newnham corridor, improve building services and fire safety. Retrofit works include making improvements to the building fabric including air-tightness, windows, doors, walls, roofs, floors and provision of mechanical ventilation with heat recovery as well as fabric repairs as part of general building maintenance. Removal of the existing plant room and replacement with a new plant room to contain the plant required to decarbonise the Kennedy building, including air source heat pumps and reinstate plant to serve West Clough.

    Submitted 15 Jul 2026 Heritage and listed buildings

Timeline

Dates from the published record

  1. 15 Jul 2026

    Received by Cambridge

  2. 28 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 9 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Cambridge took a median of 53 days over the applications it decided in the last year.

Cases linked to this one on the register

  • Application: 26/02689/LBC (Awaiting decision)

Who's behind it

Company information only, from the register and Companies House

5th Studio Agent, registered in Cambridge

Active · incorporated 1997 · Cambridge

7 applications on PlanIndex · across 2 councils

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

74 documents on file for this application

  • BNE - CONSERVATION Consultee Comments · 24 Aug 2026
  • ENVIRONMENTAL QUALITY AND GROWTH Consultee Comments · 19 Aug 2026
  • LOCAL HIGHWAY AUTHORITY Consultee Comments · 13 Aug 2026
  • ACKNOWLEDGEMENT LETTER Application Officer Correspondence · 23 Jul 2026
  • MAP OF NOTIFIED NEIGHBOURS Neighbour/Consultee Notification List · 23 Jul 2026
  • SITE NOTICE Application Press/Site Notices · 23 Jul 2026
  • APPLICATION FORM - NO PERSONAL INFO Application Information · 15 Jul 2026
  • FEE CALCULATION Application Information · 15 Jul 2026
  • ATTACHMENT SUMMARY FROM PORTAL Attachment Summary · 15 Jul 2026
  • PROPOSED DRAINAGE PLAN Drawings · 15 Jul 2026
  • HERITAGESTATEMENT.V1 Design and Access Statement · 15 Jul 2026
  • SUSTAINABILITY STATEMENT Application Survey / Assessment / Statement · 15 Jul 2026
  • TREE CONSTRAINTS PLAN Drawings · 15 Jul 2026
  • TREE PROTECTION PLAN FOR DEMOLITION Drawings · 15 Jul 2026
  • JOINERS STATEMENT Application Information · 15 Jul 2026
  • DECARBONISATION STRATEGY Application Information · 15 Jul 2026
  • STATEMENT OF NEED Application Information · 15 Jul 2026
  • SITE PLAN - EXISTING Drawings · 15 Jul 2026
  • SITE PLAN - PROPOSED Drawings · 15 Jul 2026
  • GROUND FLOOR PLAN - EXISTING Drawings · 15 Jul 2026
  • GROUND FLOOR PLAN - PROPOSED Drawings · 15 Jul 2026
  • PLANT ROOM - GROUND FLOOR PLAN - PROPOSED Drawings · 15 Jul 2026
  • FIRST FLOOR PLAN - EXISTING Drawings · 15 Jul 2026
  • FIRST FLOOR PLAN - PROPOSED Drawings · 15 Jul 2026
  • PLANT ROOM - FIRST FLOOR PLAN - PROPOSED Drawings · 15 Jul 2026
  • ATTIC FLOOR PLAN - EXISTING Drawings · 15 Jul 2026
  • ATTIC FLOOR PLAN - PROPOSED Drawings · 15 Jul 2026
  • ROOF SPACE PLAN - EXISTING Drawings · 15 Jul 2026
  • ROOF SPACE PLAN - PROPOSED Drawings · 15 Jul 2026
  • ROOF PLAN - EXISTING Drawings · 15 Jul 2026
  • ROOF PLAN - PROPOSED Drawings · 15 Jul 2026
  • LOCATION PLAN Drawings · 15 Jul 2026
  • SECTION-1-1 - EXISTING Drawings · 15 Jul 2026
  • SECTION B-B-R - EXISTING Drawings · 15 Jul 2026
  • NORTH ELEVATION - EXISTING Drawings · 15 Jul 2026
  • SOUTH ELEVATION - EXISTING Drawings · 15 Jul 2026
  • WEST ELEVATION - EXISTING Drawings · 15 Jul 2026
  • EAST ELEVATION - EXISTING Drawings · 15 Jul 2026
  • SECTION 2-2 - EXISTING Drawings · 15 Jul 2026
  • SECTION1-1-PROPOSED Drawings · 15 Jul 2026
  • SECTION 2-2 - PROPOSED Drawings · 15 Jul 2026
  • SECTION B-B-R - PROPOSED Drawings · 15 Jul 2026
  • NORTH ELEVATION - PROPOSED Drawings · 15 Jul 2026
  • SOUTH ELEVATION - PROPOSED Drawings · 15 Jul 2026
  • WEST ELEVATION - PROPOSED Drawings · 15 Jul 2026
  • EAST ELEVATION - PROPOSED Drawings · 15 Jul 2026
  • PLANT ROOM - NORTH ELEVATION - PROPOSED Drawings · 15 Jul 2026
  • PLANT ROOM - SOUTH ELEVATION - PROPOSED Drawings · 15 Jul 2026
  • PLANT ROOM - EAST WEST ELEVATION - PROPOSED Drawings · 15 Jul 2026
  • PROPOSED WALL BUILD UPS Drawings · 15 Jul 2026
  • PROPOSED FLOOR AND ROOF BUILDUPS Drawings · 15 Jul 2026
  • PROPOSED RETROFIT AND CEILING LINING DETAILS Drawings · 15 Jul 2026
  • SERVICE LINING DETAILS - ROOMS Drawings · 15 Jul 2026
  • TYPICAL DOOR DETAILS - PROPOSED Drawings · 15 Jul 2026
  • PROPOSED TYPICAL WINDOW DETAIL Drawings · 15 Jul 2026
  • GROUND FLOOR WINDOWS W-1 TO W-8 Drawings · 15 Jul 2026
  • GROUND FLOOR WINDOWS W-9 TO W-13 Drawings · 15 Jul 2026
  • FIRST FLOOR WINDOWS W-14 TO W-16 Drawings · 15 Jul 2026
  • FIRST FLOOR WINDOWS W-17 TO W-22 Drawings · 15 Jul 2026
  • ATTIC FLOOR WINDOWS W-23 TO W-27 Drawings · 15 Jul 2026
  • ROOF LEVEL WINDOWS W-28 Drawings · 15 Jul 2026
  • RETROFIT PROPOSALS Application Information · 15 Jul 2026
  • SERVICES DISTRIBUTION STRATEGY Application Information · 15 Jul 2026
  • DESIGN AND ACCESS STATEMENT PART 1 Design and Access Statement · 15 Jul 2026
  • DESIGN AND ACCESS STATEMENT PART 2 Design and Access Statement · 15 Jul 2026
  • EXISTING WINDOW GLAZING SURVEY Application Information · 15 Jul 2026
  • REPAIRS SCHEDULE Application Information · 15 Jul 2026
  • WINDOW SCHEDULE Application Information · 15 Jul 2026
  • DOOR SCHEDULE Application Information · 15 Jul 2026
  • ARBORICULTURE IMPACT ASSESSMENT Application Survey / Assessment / Statement · 15 Jul 2026
  • DIAGNOSTIC AIR TIGHTNESS TEST Application Survey / Assessment / Statement · 15 Jul 2026
  • NOISE IMPACT ASSESSMENT Application Survey / Assessment / Statement · 15 Jul 2026
  • PRELIMINARY ROOST ASSESSMENT Application Survey / Assessment / Statement · 15 Jul 2026

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Cambridge for determination, against a statutory target of eight weeks. Over the last year Cambridge decided full applications in a median of 74 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Newnham College, Kennedy Sidgwick Avenue Cambridge Cambridgeshire CB3 9DF

    26/02689/LBC Submitted 15 Jul 2026 50 yards away

    98% historically approved · decision due ~9 Sep

    Refurbishment, retrofit and decarbonisation of the Kennedy Building. Internal alterations to the Kennedy Building to increase the number of office spaces, re-provide wcs and gyp rooms, remove, partially replace and alter the stair circulation, improve accessibility on the ground floor and within the Newnham corridor, improve building services and fire safety. Retrofit works include making improvements to the building fabric including air-tightness, windows, doors, walls, roofs, floors and provision of mechanical ventilation with heat recovery as well as fabric repairs as part of general building maintenance. Removal of the existing plant room and replacement with a new plant room to contain the plant required to decarbonise the Kennedy building, including air source heat pumps and reinstate plant to serve West Clough.

    Awaiting decision Heritage and listed buildings Windows or glazing 71 docs
  • Newnham College, Peile Sidgwick Avenue Cambridge Cambridgeshire CB3 9DF

    24/03611/S19LB Submitted 25 Sep 2024 50 yards away

    S19 to vary condition 2 (drawings) of ref: 23/01849/LBC (Works to improve access to Peile Hall including removal of existing external ramp, lowering of existing external door and internal changes to include new lifting platform) - a different type of lifting platform proposed omitting the need to demolish/remodel the existing internal steps.

    Granted Conditions Demolition 11 docs
  • Newnham College Sidgwick Avenue Cambridge Cambridgeshire CB3 9DF

    23/0263/TTCA Submitted 7 Mar 2023 50 yards away

    T1 London Plane, street tree in the ownership of Cambridge City Council. Building clearance pruning to achieve scaffold required for building management work to the Rare Books Library at Newnham College, Cambridge, a Listed Building. Pruning work required is the removal of three secondary branches over the College ownership along with minor pruning of fine branches. Work to be carried out in accordance with BS3998:2010. Please see Consultant's Report with photograph showing proposed cut points.

    Granted Trees 7 docs
  • 35A Grange Road Cambridge Cambridgeshire CB3 9AU

    26/1040/TTPO Submitted 16 Sep 2026 100 yards away

    96% historically approved · decision due ~11 Nov

    Larch tree - (Dead overhanging Grange Road) - Fell. Reason - Dead, A local resident is concerned it may fall across Grange Road.

    Awaiting decision Trees 5 docs
  • Pinehurst Sidgwick Avenue Cambridge Cambridgeshire

    26/1144/TTPO Submitted 6 Oct 2026 100 yards away

    96% historically approved · decision due ~1 Dec

    T1 (T113 on plan) Dead Larch - Fell T2 (T259 on plan) Sycamore - Major dieback of upper crown, Sooty Bark Disease confirmed, risk of partial collapse, within falling distance of road, pavement and adjacent property. Fell T3 (T251 on plan) Damaged Elm - Stem subject to several collisions with tall vehicles, branch will continue to subside over time - Remove leaning stem above road to leave 2m Bolling

    Awaiting decision Trees 10 docs
  • Selwyn College Grange Road Cambridge Cambridgeshire CB3 9DQ

    26/01060/CONDA Submitted 10 Jun 2026 100 yards away

    Submission of details required by condition 3(a) (repairs to fixing locations of existing CCTV camera) and (b) (fixings of new CCTV cameras) of Listed Building consent 26/01060/LBC

    Granted Conditions 9 docs

In Cambridge

  • 26/02377/FUL Granted

    5 Davy Road Cambridge Cambridgeshire CB1 3QW

    Two storey front extension, a single storey rear extension (following the removal of the existing side and single storey rear extensions). Conversion of existing roof space following the reconstruction with a raised ridge height, to create 1no 3bed dwelling adjacent to the existing house.

    Received 23 Jun, published by the council 23 Jul 2026 Full applications
  • 26/03042/FUL Granted

    Botanical Gardens, Plant Growth Facility Department Of Plant Science Bateman Street Cambridge Cambridgeshire CB2 1LR

    Installation of a new stand-by Generator and acoustic enclosure at the Sainsbury Laboratory to serve Building B in mains fail conditions.

    Received 11 Aug, published by the council 14 Aug 2026 Full applications
  • 26/03008/FUL Granted

    24 Luard Road Cambridge Cambridgeshire CB2 8PJ

    Demolition of existing dwelling and construction of new 2.5 storey dwelling and associated landscaping

    Received 10 Aug, published by the council 14 Aug 2026 Full applications
  • 26/03002/FUL Granted

    The Pickerel Inn 30 Magdalene Street Cambridge Cambridgeshire CB3 0AF

    Remove existing jumbrellas 2 no. and replace with a new Mirador Pergola to the rear courtyard

    Received 7 Aug, published by the council 14 Aug 2026 Full applications
  • 26/03729/FUL Awaiting decision

    27-28 Bridge Street Cambridge Cambridgeshire CB2 1UJ

    Installation of new shopfront and seating at the rear external court yard with proposed conservatory glass roof.

    Received 2 Oct, published by the council 9 Oct 2026 Full applications