Planning agent
5th Studio
Registered in Cambridge. 7 planning applications on PlanIndex across 2 councils . On the register from 2022 to 2026.
- 7 Applications on record
- 4 In the last 12 months
- 2 Councils
- Too few Decisions to give a rate
Where they work
What they file
-
Heritage and listed buildings29%
-
Trees29%
-
Amendments14%
-
Conditions14%
-
Full applications14%
Company record
From Companies House. Company information only; we never show personal contact details.
- Registered name
- 5TH STUDIO LTD
- Company number
- 03373123
- Status
- Active
- Incorporated
- 19 May 1997
- Registered in
- Cambridge
Track record
The 7 most recent applications naming this firm
-
26/02689/LBC Awaiting decision
Newnham College, Kennedy Sidgwick Avenue Cambridge Cambridgeshire CB3 9DF
Refurbishment, retrofit and decarbonisation of the Kennedy Building. Internal alterations to the Kennedy Building to increase the number of office spaces, re-provide wcs and gyp rooms, remove, partially replace and alter the stair circulation, improve accessibility on the ground floor and within the Newnham corridor, improve building services and fire safety. Retrofit works include making improvements to the building fabric including air-tightness, windows, doors, walls, roofs, floors and provision of mechanical ventilation with heat recovery as well as fabric repairs as part of general building maintenance. Removal of the existing plant room and replacement with a new plant room to contain the plant required to decarbonise the Kennedy building, including air source heat pumps and reinstate plant to serve West Clough.
-
26/02688/FUL Awaiting decision
Newnham College, Kennedy Sidgwick Avenue Cambridge Cambridgeshire CB3 9DF
Refurbishment, retrofit and decarbonisation of the Kennedy Building. Internal alterations to the Kennedy Building to increase the number of office spaces, re-provide wcs and gyp rooms, remove, partially replace and alter the stair circulation, improve accessibility on the ground floor and within the Newnham corridor, improve building services and fire safety. Retrofit works include making improvements to the building fabric including air-tightness, windows, doors, walls, roofs, floors and provision of mechanical ventilation with heat recovery as well as fabric repairs as part of general building maintenance. Removal of the existing plant room and replacement with a new plant room to contain the plant required to decarbonise the Kennedy building, including air source heat pumps and reinstate plant to serve West Clough.
-
26/02428/LBC Granted
Corpus Christi College Trumpington Street Cambridge Cambridgeshire CB2 1RH
Structural repairs, fire safety upgrades and alterations to the bathroom layouts within the rooms surrounding I-Staircase, New Court, Corpus Christi.
-
24/03580/NMA1 Awaiting decision
Darwin College Silver Street Cambridge Cambridgeshire CB3 9EU
Non-material amendment on application 24/03580/FUL for minor amendments to Arboricultural Impact Assessment and Method Statement
-
24/03580/CONDD Decided
Darwin College Silver Street Cambridge Cambridgeshire CB3 9EU
Submission of details required by conditions 17 (Foul Water Drainage) and 18 (Surface Water) - partial discharge, Pump House (plant room) Phase 1A of planning permission 24/03580/FUL
-
22/04407/TCA Withdrawn
Harrow Road London
Please refer to supplementary file note HARR-5TH-V1-XX-FN-A-7200-P01 and sketch plan HARR-5TH-V1-XX-DR-A-7202-P01. (Open Space Harrow Road)
-
22/04405/TCA Granted
Rowington Close London
2x tree groups (G70 on plan, Elder and Norway Maple and G88 on plan, Sycamore): fell
The full track record
Trade members see everything this firm has filed, filter it by council and outcome, and get an email the day it files again.
See the full track recordFrom council registers and Companies House. Counts describe the records we hold, not a firm's complete history. Request a correction or removal.