Skip to content
PlanIndex Get alerts
Menu

Planning application

Cambridge Business Park Cowley Road Cambridge CB4 0WZ

Awaiting decision Cambridge 26/02567/OUT Outline Application

Works: New dwelling Demolition

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Outline planning application with all matters reserved (save for means of access), for a flexible phased development in separate and severable components comprising the demolition and retention of existing buildings and erection of new buildings to provide: (i) employment generating floorspace comprising Use Class E(g)(i) (offices) and Use Class E(g)(ii) (research and development),flexible Class E(a-f) and Classes F1 and F2 for retail, leisure, community uses and Sui Generis including associated plant, (ii) residential development in Use Class C3 and Sui Generis (co-living), and associated plant, (iii) erection of mobility hubs (Sui Generis) for vehicular and cycle parking and associated plant, and (iv) means of access comprising new pedestrian, cycle and vehicular accesses from Cowley Road, new pedestrian and cycle accesses from the Cambridgeshire Guided Busway, provision of a new bus stop and crossing points of the Guided Busway, open spaces, landscaping, and associated infrastructure.

As published by the council, reference 26/02567/OUT

Application record

Reference
26/02567/OUT
Type
Outline Application
Status
Awaiting decision
Received
2 Jul 2026
Validated
10 Jul 2026
Ward
East Chesterton
Postcode
CB4 0WZ

Comment by 30 September 2026

The council is taking comments on this application until then. Have your say on Cambridge's portal.

Timeline

Dates from the published record

  1. 2 Jul 2026

    Received by Cambridge

  2. 10 Jul 2026

    Validated

    Checked as complete and ready for consideration.

  3. 23 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 4 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Cambridge took a median of 52 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

WSP Ltd Agent, registered in Cobham

Active · incorporated 2001 · Cobham

594 applications on PlanIndex · across 124 councils · 97% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

179 documents on file for this application

  • COUNTY TRANSPORT TEAM Consultee Comments · 02 Sep 2026
  • CAMCYCLE Third Party Comments · 21 Aug 2026
  • ECOLOGY Consultee Comments · 21 Aug 2026
  • LANDSCAPE DESIGN Consultee Comments · 20 Aug 2026
  • PUBLIC ART Consultee Comments · 18 Aug 2026
  • NHS Consultee Comments · 14 Aug 2026
  • URBAN DESIGN Consultee Comments · 14 Aug 2026
  • SUSTAINABLE DESIGN Consultee Comments · 14 Aug 2026
  • NATIONAL HIGHWAYS Consultee Comments · 14 Aug 2026
  • LOCAL HIGHWAY AUTHORITY Consultee Comments · 13 Aug 2026
  • EAST WEST RAILWAY COMPANY LIMITED (EWR CO) Consultee Comments · 12 Aug 2026
  • APPENDIX 10.8 - BNG METRIC (WITH MACRO) Application Survey / Assessment / Statement · 10 Aug 2026
  • APPENDIX 10.8 - BNG METRIC (W/O MACRO) Application Survey / Assessment / Statement · 10 Aug 2026
  • CAMBRIDGE AIRPORT (UPDATED CONSULTATION RESPONSE) Consultee Comments · 10 Aug 2026
  • NATURAL ENGLAND Consultee Comments · 07 Aug 2026
  • ENVIRONMENT AGENCY Consultee Comments · 04 Aug 2026
  • TREES Consultee Comments · 04 Aug 2026
  • PARISH Consultee Comments · 03 Aug 2026
  • LOCAL LEAD FLOOD AUTHORITY Consultee Comments · 28 Jul 2026
  • WASTE - SHARED SERVICE Consultee Comments · 21 Jul 2026
  • WASTE - SHARED SERVICE Consultee Comments · 21 Jul 2026
  • MINISTRY OF DEFENCE Consultee Comments · 20 Jul 2026
  • AIRPORT SAFEGUARDING (SUPERSEDED) Consultee Comments · 17 Jul 2026
  • JDMC BRIEFING PACK - PREPARED AND ISSUED BY TCE Correspondence · 17 Jul 2026
  • HISTORIC ENGLAND Consultee Comments · 16 Jul 2026
  • ACKNOWLEDGEMENT LETTER Application Officer Correspondence · 15 Jul 2026
  • MAP OF NOTIFIED NEIGHBOURS Neighbour/Consultee Notification List · 15 Jul 2026
  • SITE NOTICE Application Press/Site Notices · 15 Jul 2026
  • CAMBRIDGE FIRST PUBLIC DRAIN HYDRAULIC MODELLING REPORT PART 1 Application Information · 10 Jul 2026
  • CAMBRIDGE FIRST PUBLIC DRAIN HYDRAULIC MODELLING REPORT PART 2 Application Information · 10 Jul 2026
  • CAMBRIDGE FIRST PUBLIC DRAIN HYDRAULIC MODELLING REPORT PART 3 Application Information · 10 Jul 2026
  • CAMBRIDGE FIRST PUBLIC DRAIN HYDRAULIC MODELLING REPORT PART 4 Application Information · 10 Jul 2026
  • DESIGN AND ACCESS STATEMENT PART 1 Design and Access Statement · 10 Jul 2026
  • DESIGN AND ACCESS STATEMENT PART 10 Design and Access Statement · 10 Jul 2026
  • DESIGN AND ACCESS STATEMENT PART 11 Design and Access Statement · 10 Jul 2026
  • DESIGN AND ACCESS STATEMENT PART 12 Design and Access Statement · 10 Jul 2026
  • DESIGN AND ACCESS STATEMENT PART 13 Design and Access Statement · 10 Jul 2026
  • DESIGN AND ACCESS STATEMENT PART 14 Design and Access Statement · 10 Jul 2026
  • DESIGN AND ACCESS STATEMENT PART 15 Design and Access Statement · 10 Jul 2026
  • DESIGN AND ACCESS STATEMENT PART 16 Design and Access Statement · 10 Jul 2026
  • DESIGN AND ACCESS STATEMENT PART 17 Design and Access Statement · 10 Jul 2026
  • DESIGN AND ACCESS STATEMENT PART 18 Design and Access Statement · 10 Jul 2026
  • DESIGN AND ACCESS STATEMENT PART 19 Design and Access Statement · 10 Jul 2026
  • DESIGN AND ACCESS STATEMENT PART 2 Design and Access Statement · 10 Jul 2026
  • DESIGN AND ACCESS STATEMENT PART 20 Design and Access Statement · 10 Jul 2026
  • DESIGN AND ACCESS STATEMENT PART 3 Design and Access Statement · 10 Jul 2026
  • DESIGN AND ACCESS STATEMENT PART 4 Design and Access Statement · 10 Jul 2026
  • DESIGN AND ACCESS STATEMENT PART 5 Design and Access Statement · 10 Jul 2026
  • DESIGN AND ACCESS STATEMENT PART 6 Design and Access Statement · 10 Jul 2026
  • DESIGN AND ACCESS STATEMENT PART 7 Design and Access Statement · 10 Jul 2026
  • DESIGN AND ACCESS STATEMENT PART 8 Design and Access Statement · 10 Jul 2026
  • DESIGN AND ACCESS STATEMENT PART 9 Design and Access Statement · 10 Jul 2026
  • DEVELOPMENT SPECIFICATION Application Information · 10 Jul 2026
  • ENVIRONMENTAL STATEMENT VOL 2 CHAPTER 5 TOWNSCAPE LANDSCAPE AND VISUAL Application Survey / Assessment / Statement · 10 Jul 2026
  • PLANNING STATEMENT Application Survey / Assessment / Statement · 10 Jul 2026
  • TOWNSCAPE SUMMARY PART 1 Application Information · 10 Jul 2026
  • TOWNSCAPE SUMMARY PART 2 Application Information · 10 Jul 2026
  • TOWNSCAPE SUMMARY PART 3 Application Information · 10 Jul 2026
  • TOWNSCAPE SUMMARY PART 4 Application Information · 10 Jul 2026
  • APPLICATION FORM - NO PERSONAL INFO Application Information · 06 Jul 2026
  • FEE CALCULATION Application Information · 06 Jul 2026
  • ATTACHMENT SUMMARY FROM PORTAL Attachment Summary · 06 Jul 2026
  • APPENDIX 13.1 -WIND MICROCLIMATE CFD STUDY Application Information · 06 Jul 2026
  • APPENDIX 2.1 - SITE LOCATION PLAN Drawings · 06 Jul 2026
  • APPENDIX 5.1 TVIA METHODOLOGY Application Information · 06 Jul 2026
  • APPENDIX 5.2 - TOWNSCAPE AND LANDSCAPE ASSESSMENT Application Information · 06 Jul 2026
  • APPENDIX 2.2 - RELEVANT PARAMETER PLANS FOR ES Application Information · 06 Jul 2026
  • APPENDIX 5.3 - VISUAL ASSESSMENT Application Survey / Assessment / Statement · 06 Jul 2026
  • APPENDIX 5.4 ZTV WITH VIEWPOINT LOCATIONS Drawings · 06 Jul 2026
  • APPENDIX 5.4 LANDSCAPE CHARACTER NATIONAL AND LOCALL Drawings · 06 Jul 2026
  • APPENDIX 5.4 LANDSCAPE DESIGNATIONS Drawings · 06 Jul 2026
  • APPENDIX 5.4 - FIGURE 5.5 - RECREATIONAL AND TRANSPORT ROUTES Drawings · 06 Jul 2026
  • APPENDIX 5.4 VISITOR AND TOURIST DESTINATIONS Drawings · 06 Jul 2026
  • APPENDIX 1.2 - EIA SCOPING OPINION Application Information · 06 Jul 2026
  • APPENDIX 5.4 SUMMER WIRELINES Application Information · 06 Jul 2026
  • APPENDIX 5.4 RENDERS (AVR3) Application Information · 06 Jul 2026
  • APPENDIX 5.4 ZTV WITH VIEWPOINT LOCATIONS Drawings · 06 Jul 2026
  • APPENDIX 5.4 TOWNSCAPE CHARACTER AREAS Drawings · 06 Jul 2026
  • APPENDIX 6.1 TRANSPORT ASSESSMENT APPENDICES A-C Application Survey / Assessment / Statement · 06 Jul 2026
  • APPENDIX 6.1 TRANSPORT ASSESSMENT APPENDICES D-E Application Survey / Assessment / Statement · 06 Jul 2026
  • APPENDIX 6.1 TRANSPORT ASSESSMENT APPENDICES F-G Drawings · 06 Jul 2026
  • APPENDIX 6.1 TRANSPORT ASSESSMENT MAIN REPORT Application Information · 06 Jul 2026
  • APPENDIX 6.2 FRAMEWORK TRAVEL PLAN Application Information · 06 Jul 2026
  • APPENDIX 7.1 - FLOOD RISK ASSESSMENT Application Survey / Assessment / Statement · 06 Jul 2026
  • APPENDIX 7.2 -OUTLINE DRAINAGE STRATEGY Drawings · 06 Jul 2026
  • APPENDIX 7.3 - WATER CONSERVATION REPORT Application Information · 06 Jul 2026
  • APPENDIX 9.1 GLOSSARY Application Information · 06 Jul 2026
  • APPENDIX 9.2 LEGISLATION POLICY AND GUIDANCE Application Information · 06 Jul 2026
  • APPENDIX 9.3 BASELINE CONDITIONS Application Information · 06 Jul 2026
  • APPENDIX 9.4 CONSTRUCTION NOISE AND VIBRATION Application Information · 06 Jul 2026
  • APPENDIX 5.4WINTER WIRELINES - 1 OF 3 Application Information · 06 Jul 2026
  • APPENDIX 9.6 SITE SUITABILITY ASSESSMENT Application Survey / Assessment / Statement · 06 Jul 2026
  • APPENDIX 1.1 - EIA SCOPING REQUEST REPORT Application Information · 06 Jul 2026
  • APPENDIX 5.4 WINTER WIRELINES - 2 OF 3 Application Information · 06 Jul 2026
  • ARBORICULTURAL IMPACT ASSESSMENT Application Survey / Assessment / Statement · 06 Jul 2026
  • APPENDIX 5.4 WINTER WIRELINES - 3 OF 3 Application Information · 06 Jul 2026
  • CHAPTER 10 - BAT ACTIVITY SURVEY Application Survey / Assessment / Statement · 06 Jul 2026
  • APPENDIX 9.5 OPERATIONAL NOISE Application Information · 06 Jul 2026
  • CHAPTER 10 - BIODIVERSITY NET GAIN ASSESSMENT Application Survey / Assessment / Statement · 06 Jul 2026
  • CHAPTER 10 - GCN EDNA SURVEY Application Survey / Assessment / Statement · 06 Jul 2026
  • CHAPTER 10 - OTTER AND WATER VOLE SURVEY Application Information · 06 Jul 2026
  • CHAPTER 10 - PRELIMINARY ECOLOGICAL APPRAISAL Application Survey / Assessment / Statement · 06 Jul 2026
  • CHAPTER 10 - PRELIMINARY ROOST ASSESSMENT Application Survey / Assessment / Statement · 06 Jul 2026
  • CHAPTER 12 APPENDIX A FACADE MAPPING Drawings · 06 Jul 2026
  • CHAPTER 12 DAYLIGHT AND SUNLIGHT APPENDICES Application Information · 06 Jul 2026
  • CHAPTER 12 - APPENDIX 12.3 C TRANSIENT OVERSHADOW Drawings · 06 Jul 2026
  • CHAPTER 12 - APPENDIX 12.3 C TRANSIENT OVERSHADOW Drawings · 06 Jul 2026
  • CHAPTER 12 - APPENDIX 12.4 D MODEL CONFIGURATION Application Information · 06 Jul 2026
  • CHAPTER 12 - APPENDIX 12.5 E DSO CALCULATIONS Application Information · 06 Jul 2026
  • CHAPTER 8 - AIR QUALITY APPENDICES Application Information · 06 Jul 2026
  • COVERING LETTER Application Information · 06 Jul 2026
  • CHAPTER 10 - BAT EMERGENCE SURVEY Application Survey / Assessment / Statement · 06 Jul 2026
  • DESIGN CODE PART 1 Application Information · 06 Jul 2026
  • DESIGN CODE PART 2 Application Information · 06 Jul 2026
  • DESIGN CODE PART 3 Application Information · 06 Jul 2026
  • DESIGN CODE PART 4 Application Information · 06 Jul 2026
  • DESIGN CODE PART 5 Application Information · 06 Jul 2026
  • DESIGN CODE PART 6 Application Information · 06 Jul 2026
  • ENERGY STRATEGY REPORT Application Information · 06 Jul 2026
  • ENVIRONMENTAL CONSTRAINT PLAN Application Information · 06 Jul 2026
  • HEALTH IMPACT ASSESSMENT Application Survey / Assessment / Statement · 06 Jul 2026
  • HISTORIC ENVIRONMENT DESK BASED ASSESSMENT Application Survey / Assessment / Statement · 06 Jul 2026
  • LIGHTING STRATEGY Application Information · 06 Jul 2026
  • OPERATIONAL WASTE MANAGEMENT STATEMENT Application Survey / Assessment / Statement · 06 Jul 2026
  • PARAMETER PLAN 01 EXISTING SITE PLAN Drawings · 06 Jul 2026
  • PARAMETER PLAN 02 DEMOLITION PLAN Drawings · 06 Jul 2026
  • PARAMETER PLAN 03 ACCESS AND CIRCULATION PLAN Drawings · 06 Jul 2026
  • PARAMETER PLAN 04 LAND USE PLAN - BASEMENT Drawings · 06 Jul 2026
  • PARAMETER PLAN 05 LAND USE PLAN GROUND FLOOR Drawings · 06 Jul 2026
  • PARAMETER PLAN 06 LAND USE PLAN - UPPER LEVELS Drawings · 06 Jul 2026
  • PARAMETER PLAN 07 OPEN SPACE PLAN Drawings · 06 Jul 2026
  • PARAMETER PLAN 08 MAXIMUM PLOT EXTENTS - BELOW GROUND Drawings · 06 Jul 2026
  • PARAMETER PLAN 09 PROPOSED MAXIMUM HEIGHTS - ABOVE GROUND Drawings · 06 Jul 2026
  • PARAMETER PLAN 10 DEVELOPMENT ZONES MAX BUILDING LINES AND PUBLIC REALM Drawings · 06 Jul 2026
  • PARAMETER PLAN 11 URBAN DESIGN PLAN Drawings · 06 Jul 2026
  • PHASE 1 CONTAMINATED LAND PRELIMINARY RISK ASSESSMENT Application Survey / Assessment / Statement · 06 Jul 2026
  • PROPOSED LANDSCAPE LEVEL 00 PLAN Drawings · 06 Jul 2026
  • PROPOSED LEVEL 00 PLAN EMPLOYMENT SWITCH Drawings · 06 Jul 2026
  • PROPOSED LEVEL 00 PLAN RESIDENTIAL SWITCH Drawings · 06 Jul 2026
  • PROPOSED LEVEL 02 PLAN EMPLOYMENT SWITCH Drawings · 06 Jul 2026
  • PROPOSED LEVEL 02 PLAN RESIDENTIAL SWITCH Drawings · 06 Jul 2026
  • PROPOSED LEVEL 09 PLAN EMPLOYMENT SWITCH Drawings · 06 Jul 2026
  • PROPOSED ROOF PLAN EMPLOYMENT SWITCH Drawings · 06 Jul 2026
  • PROPOSED ROOF PLAN RESIDENTIAL SWITCH Drawings · 06 Jul 2026
  • PUBLIC ART STRATEGY Application Information · 06 Jul 2026
  • RETAIL AND GROUND FLOOR STRATEGY Application Information · 06 Jul 2026
  • SITE CONSTRAINT PLAN Drawings · 06 Jul 2026
  • SITE LOCATION PLAN Drawings · 06 Jul 2026
  • SITE WASTE MANAGEMENT STATEMENT Application Survey / Assessment / Statement · 06 Jul 2026
  • SOCIAL AND ECONOMIC IMPACT STATEMENT Application Survey / Assessment / Statement · 06 Jul 2026
  • STATEMENT OF COMMUNITY ENGAGEMENT PART1 Application Survey / Assessment / Statement · 06 Jul 2026
  • STATEMENT OF COMMUNITY ENGAGEMENT PART2 Application Information · 06 Jul 2026
  • STATEMENT OF COMMUNITY ENGAGEMENT PART3 Application Information · 06 Jul 2026
  • SUSTAINABILITY STATEMENT Application Survey / Assessment / Statement · 06 Jul 2026
  • ENVIRONMENTAL STATEMENT VOL 2 CHAPTER 1 Application Survey / Assessment / Statement · 06 Jul 2026
  • ENVIRONMENTAL STATEMENT VOL 2 CHAPTER 10 BIODIVERSITY AND NATURE CONSERVATION Application Survey / Assessment / Statement · 06 Jul 2026
  • ENVIRONMENTAL STATEMENT VOL 2 REPORT SOCIO-ECONOMICS Application Survey / Assessment / Statement · 06 Jul 2026
  • ENVIRONMENTAL STATEMENT VOL 2 CHAPTER 12 DAYLIGHT VOL 2 SUNLIGHT AND OVERSHADOWING Application Survey / Assessment / Statement · 06 Jul 2026
  • ENVIRONMENTAL STATEMENT VOL 2 CHAPTER 13 WIND MICROCLIMATE Application Survey / Assessment / Statement · 06 Jul 2026
  • ENVIRONMENTAL STATEMENT VOL 2 CHAPTER 2 DESCRIPTION OF THE PROPOSED DEVELOPMENT Application Survey / Assessment / Statement · 06 Jul 2026
  • ENVIRONMENTAL STATEMENT VOL 2 CHAPTER 3 APPROACH TO ENVIRONMENTAL IMPACT ASSESSMENT Application Survey / Assessment / Statement · 06 Jul 2026
  • ENVIRONMENTAL STATEMENT VOL 2 CHAPTER 4 REASONABLE ALTERNATIVES CONSIDERED Application Survey / Assessment / Statement · 06 Jul 2026
  • ENVIRONMENTAL STATEMENT VOL 2 CHAPTER 6 TRANSPORT MOVEMENT AND ACCESS Application Survey / Assessment / Statement · 06 Jul 2026
  • ENVIRONMENTAL STATEMENT VOL 2 CHAPTER 7 HYDROLOGY DRAINAGE AND WATER RESOURCES Application Survey / Assessment / Statement · 06 Jul 2026
  • ENVIRONMENTAL STATEMENT VOL 2 CHAPTER 8 AIR QUALITY ODOUR AND DUST Drawings · 06 Jul 2026
  • ENVIRONMENTAL STATEMENT VOL 2 CHAPTER 9 NOISE AND VIBRATION Application Information · 06 Jul 2026
  • ENVIRONMENTAL STATEMENT VOLUME 1 NON-TECHNICAL SUMMARY Application Survey / Assessment / Statement · 06 Jul 2026
  • UTILITIES REPORT Application Information · 06 Jul 2026
  • YOUTH ENGAGEMENT REPORT Application Information · 06 Jul 2026
  • ENVIRONMENTAL STATEMENT VOL 2 CHAPTER 13 WIND MICROCLIMATE Application Information · 06 Jul 2026
  • ENVIRONMENTAL STATEMENT VOL 2 CHAPTER 8 AIR QUALITY ODOUR AND DUST Drawings · 06 Jul 2026
  • ENVIRONMENTAL STATEMENT VOL 2 CHAPTER 8 AIR QUALITY ODOUR AND DUST Drawings · 06 Jul 2026
  • ENVIRONMENTAL STATEMENT VOL 2 CHAPTER 9 NOISE AND VIBRATION Application Information · 06 Jul 2026
  • ENVIRONMENTAL STATEMENT VOL 2 CHAPTER 12 DAYLIGHT VOL 2 SUNLIGHT AND OVERSHADOWING Application Information · 06 Jul 2026
  • ENVIRONMENTAL STATEMENT VOL 2 CHAPTER 13 WIND MICROCLIMATE Application Information · 06 Jul 2026
  • LETTER TO JOINT DEVELOPMENT MANAGEMENT COMMITTEE PREPARED AND ISSUED ON BEHALF OF BY TCE Correspondence · 29 Jun 2026

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Cambridge for determination, against a statutory target of eight weeks. Over the last year Cambridge's median decision took 52 days. More in our guide to how long planning decisions take.

About outline applications

An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Trinity Hall Farm Industrial Estate Nuffield Road Cambridge Cambridgeshire CB4 1TG

    25/00016/FUL Submitted 3 Jan 2025 228m away

    91% historically approved · decision due ~28 Feb

    Demolition of existing buildings and the erection of buildings for Use Class E(g)i (offices) and E(g)ii (research and development) with Class E(a) (retail) and E(b) (sale of food and drink) uses on the ground floor together with Public Garden, landscaping and associated infrastructure works.

    Awaiting decision Full applications Demolition 305 docs
  • Cambridge Science Park Milton Road Cambridge Cambridgeshire

    26/01872/OUT Submitted 18 May 2026 254m away

    95% historically approved · decision due ~13 Jul

    Outline planning application with all matters reserved for a mixed-use redevelopment of Cambridge Science Park in separate and severable components each representing severable permitted areas comprising: Flexible employment uses including research and development, office, and workspace, industrial and storage (including data) uses (Use Classes E(g), B2, B8 and sui generis), Flexible Class E, Class F1 and F2, C1 (hotel) and Sui Generis (bar and hot food takeaway) uses to support the operation of the wider Science Park, Highway works, including new vehicular, cyclist and pedestrian roads and paths, and car and cycle parking facilities including mobility hubs with associated electric vehicle charging infrastructure, Landscape and public realm, including areas for sustainable urban drainage systems, biodiversity areas, outdoor play and sports facilities (Use Class F2(c)), Utility, energy, and water facilities and infrastructure, together with enabling, site clearance, demolition and associated works, including temporary meanwhile uses (this includes application ref: 26/01902/OUT).

    Awaiting decision Outline Demolition 180 docs
  • 1 Maitland Avenue Cambridge CB4 1TA

    18/1553/NMA1 Submitted 2 Oct 2020 263m away

    Non-material amendment on application 18/1553/FUL for changes to internal layout, including the provision of space for a future through floor lift and minor fenestration changes.

    Refused Amendments Windows or glazing 20 docs
  • Development Site, Plots 1 - 21 Cambridge Science Park Milton Cambridge South Cambridgeshire

    S/2436/17/COND10 Submitted 20 Aug 2020 302m away

    Submission of details required by condition 10 (Ecological Enhancement) of planning permission S/2436/17/FL

    Granted Conditions 10 docs
  • Development Site, Plots 1 - 21 Cambridge Science Park Milton Cambridge South Cambridgeshire

    S/2436/17/CONDC Submitted 12 Aug 2020 302m away

    Submission of details required by condition12 (Long-term maintenance arrangements of the surface water drainage system) of planning permission S/2436/17/FL

    Granted Conditions 13 docs
  • Development Site, Plots 1 - 21 Cambridge Science Park Milton Cambridge South Cambridgeshire

    S/2436/17/CONDA Submitted 12 Aug 2020 302m away

    Submission of details required by condition 11 (Surface water drainage) of planning permission S/2436/17/FL

    Granted Conditions 14 docs

In Cambridge

  • 26/02745/SCRE Decided

    William James House Cowley Road Cambridge Cambridgeshire CB4 0WX

    EIA Screening Opinion under the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 for the Proposed Development comprises the demolition of the existing buildings and the redevelopment of the Site to provide four mid-tech units within flexible commercial Use Classes E(g)(ii), E(g)(iii), B2 and B8, together with associated reception/office accommodation, car and cycle parking, servicing yards, substation, landscaping, Sustainable Drainage Systems (SuDS) including an attenuation basin, and associated infrastructure works.

    21 Jul 2026 Outline
  • 26/01438/OUT Refused

    47 Histon Road Cambridge Cambridgeshire CB4 3JD

    Outline application for the erection of a two storey one bed self/custom build detached dwelling in the rear garden of 47 Histon Road with some matters reserved except for access, layout and scale.

    15 Apr 2026 Outline
  • 26/02355/SCRE Decided

    14-18 George IV Street And 20 - 22 Hills Road Cambridge Cambridgeshire CB2 1PF

    EIA Screening Opinion under the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 for proposed development at 14-18 George Street and 20-22 Hills Road

    22 Jun 2026 Outline
  • 26/02525/OUT Awaiting decision

    210 Queen Ediths Way Cambridge Cambridgeshire CB1 8NL

    Outline application for the erection of 1no 3bed dwelling.

    2 Jul 2026 Outline
  • 26/02524/OUT Awaiting decision

    208 Queen Ediths Way Cambridge Cambridgeshire CB1 8NL

    Outline application for the erection 1no. dwelling with all matters reserved.

    2 Jul 2026 Outline