Skip to content
PlanIndex Get alerts
Menu

Planning application

Cambridge Science Park Milton Road Cambridge Cambridgeshire

Awaiting decision Cambridge 26/01872/OUT Outline Application

Works: Demolition

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Outline planning application with all matters reserved for a mixed-use redevelopment of Cambridge Science Park in separate and severable components each representing severable permitted areas comprising: Flexible employment uses including research and development, office, and workspace, industrial and storage (including data) uses (Use Classes E(g), B2, B8 and sui generis), Flexible Class E, Class F1 and F2, C1 (hotel) and Sui Generis (bar and hot food takeaway) uses to support the operation of the wider Science Park, Highway works, including new vehicular, cyclist and pedestrian roads and paths, and car and cycle parking facilities including mobility hubs with associated electric vehicle charging infrastructure, Landscape and public realm, including areas for sustainable urban drainage systems, biodiversity areas, outdoor play and sports facilities (Use Class F2(c)), Utility, energy, and water facilities and infrastructure, together with enabling, site clearance, demolition and associated works, including temporary meanwhile uses (this includes application ref: 26/01902/OUT).

As published by the council, reference 26/01872/OUT

Application record

Reference
26/01872/OUT
Type
Outline Application
Status
Awaiting decision
Received
18 May 2026
Validated
18 May 2026
Ward
East Chesterton

Comment by 16 October 2026

The council is taking comments on this application until then. Have your say on Cambridge's portal.

Site history

Applications at this address on the Cambridge register

This site has had 3 applications since 2026.

  • 26/02363/SCRE Awaiting decision

    Cambridge Science Park Milton Road Cambridge Cambridgeshire

    EIA Screening Opinion under the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 for proposed dry lab, workspaces and ancillary facilities.

    Submitted 22 Jun 2026 Outline
  • 26/01685/SCOP Decided

    Cambridge Science Park Milton Road Cambridge Cambridgeshire

    EIA Scoping Opinion request pursuant to Regulation 15 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (as amended) Proposed Development consists of a full planning application for the northern plot for a landmark building/multi-tenant lab building, multi-storey car park and highway works and outline planning application (all matters reserved apart from access) for the southern plot for two office/research/development buildings, The Trinity Centre and Cambridge Science Centre.

    Decided 16 Jun 2026 Outline

Timeline

Dates from the published record

  1. 18 May 2026

    Received by Cambridge

  2. 23 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 13 July 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Cambridge took a median of 52 days over the applications it decided in the last year.

Cases linked to this one on the register

  • Application: 26/01902/OUT (Awaiting decision)

Who's behind it

Company information only, from the register and Companies House

DP9 Ltd Agent

Active · incorporated 2004

2,241 applications on PlanIndex · across 36 councils · 98% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

180 documents on file for this application

  • PARKING MANAGEMENT PLAN Application Information · 08 Sep 2026
  • TTC CONSERVATION AND HE CONSULTATION RESPONSE LETTER Application Information · 08 Sep 2026
  • HTVIA ES ADDENDUM Application Information · 08 Sep 2026
  • ADDENDUM-APPENDIX 03-PHOTOS (VP35-37) Application Information · 08 Sep 2026
  • ADDENDUM-APPENDIX-06 Application Information · 08 Sep 2026
  • LVIA ADDENDUM Application Information · 08 Sep 2026
  • LVIA-APPENDIX-04-LS-SCOPING Application Information · 08 Sep 2026
  • LAND USES PARAMETER PLAN Drawings · 08 Sep 2026
  • LAYOUT PARAMETER PLAN Drawings · 08 Sep 2026
  • PLANNING STATEMENT ADDENDUM Application Information · 08 Sep 2026
  • SUPERSEDED DESIGN AND ACCESS STATEMENT Design and Access Statement · 08 Sep 2026
  • DESIGN CODES Application Information · 08 Sep 2026
  • COVERING LETTER - AMENDMENTS V2 - CCC Application Information · 08 Sep 2026
  • COVERING LETTER - AMENDMENTS V2 SCDC Application Information · 08 Sep 2026
  • ECOSYSTEM NOTE Application Information · 08 Sep 2026
  • DEVELOPMENT ZONE PARAMETER PLAN Drawings · 08 Sep 2026
  • GREEN & BLUE INFRASTRUCTURE PARAMETER PLAN Drawings · 08 Sep 2026
  • FILE COPY OF AMENDMENT LETTER Application Officer Correspondence · 08 Sep 2026
  • SITE NOTICE Application Press/Site Notices · 08 Sep 2026
  • SITE NOTICE Application Press/Site Notices · 08 Sep 2026
  • SITE NOTICE Application Press/Site Notices · 08 Sep 2026
  • SITE NOTICE Application Press/Site Notices · 08 Sep 2026
  • TA AND PMP COMMENTS RESPONSE Application Information · 07 Sep 2026
  • DEVELOPMENT SPECIFICATION V3 FINAL Application Information · 07 Sep 2026
  • OUTLINE PUBLIC ART STRATEGY V2 Application Information · 07 Sep 2026
  • ADDENDUM-APPENDIX 03-PHOTOS (VP19-21) Application Information · 07 Sep 2026
  • ADDENDUM-APPENDIX 03-PHOTOS (VP22-29) Application Information · 07 Sep 2026
  • LVIA-APPENDIX-01-METHODOLOGY Application Information · 07 Sep 2026
  • LVIA-APPENDIX-02-FIGURES Application Information · 07 Sep 2026
  • FRAMEWORK PARAMETER PLAN Drawings · 07 Sep 2026
  • MAXIMUM HEIGHTS PARAMETER PLAN Drawings · 07 Sep 2026
  • ACCESS AND MOVEMENT PARAMETER PLAN Drawings · 07 Sep 2026
  • EIA ADDENDUM REPORT_FINAL Application Information · 07 Sep 2026
  • EIA NON TECHNICAL SUMMARY Application Information · 07 Sep 2026
  • DRAINAGE STRATEGY TECHNICAL NOTE Application Information · 07 Sep 2026
  • ADDENDUM-APPENDIX 03-PHOTOS (VP10-12) Application Information · 07 Sep 2026
  • ADDENDUM-APPENDIX 03-PHOTOS (VP15-17) Application Information · 07 Sep 2026
  • ADDENDUM-APPENDIX 03-PHOTOS (VP2-9) Application Information · 07 Sep 2026
  • ADDENDUM-APPENDIX 03-PHOTOS (VP30-34) Application Information · 07 Sep 2026
  • ADDENDUM-APPENDIX-07 Application Information · 07 Sep 2026
  • LVIA-APPENDIX-05-LS-PPA Application Information · 07 Sep 2026
  • UTILITIES STATEMENT REPORT Application Information · 07 Sep 2026
  • EOT REQUEST Extension of Time Request · 04 Sep 2026
  • ACKNOWLEDGEMENT LETTER Application Officer Correspondence · 27 May 2026
  • SITE NOTICE Application Press/Site Notices · 27 May 2026
  • SITE NOTICE Application Press/Site Notices · 27 May 2026
  • SITE NOTICE Application Press/Site Notices · 27 May 2026
  • SITE NOTICE Application Press/Site Notices · 27 May 2026
  • ENVIRONMENTAL STATEMENT VOLUME 2 PART 4 Application Information · 22 May 2026
  • ECOLOGY REPORT Application Information · 21 May 2026
  • SUPERSEDED ENVIRONMENTAL STATEMENT VOLUME 2 Application Information · 21 May 2026
  • ENVIRONMENTAL STATEMENT VOLUME 2 PART 2 Application Information · 21 May 2026
  • ENVIRONMENTAL STATEMENT VOLUME 2 PART 3 Application Information · 21 May 2026
  • ENVIRONMENTAL STATEMENT VOLUME 2 PART 5 Application Information · 21 May 2026
  • ENVIRONMENTAL STATEMENT VOLUME 2 PART 6 Application Information · 21 May 2026
  • ENVIRONMENTAL STATEMENT VOLUME 2 PART 7 Application Information · 21 May 2026
  • ENVIRONMENTAL STATEMENT VOLUME 2 PART 8 Application Information · 21 May 2026
  • ENVIRONMENTAL STATEMENT VOLUME 2 PART 9 Application Information · 21 May 2026
  • ENVIRONMENTAL STATEMENT VOLUME 2 PART 10 Application Information · 21 May 2026
  • ENVIRONMENTAL STATEMENT VOLUME 2 PART 11 Application Information · 21 May 2026
  • ENVIRONMENTAL STATEMENT VOLUME 2 PART 12 Application Information · 21 May 2026
  • ENVIRONMENTAL STATEMENT VOLUME 2 PART 13 Application Information · 21 May 2026
  • ENVIRONMENTAL STATEMENT VOLUME 2 PART 14 Application Information · 21 May 2026
  • ENVIRONMENTAL STATEMENT VOLUME 2 PART 15 Application Information · 21 May 2026
  • ENVIRONMENTAL STATEMENT VOLUME 2 PART 16 Application Information · 21 May 2026
  • ENVIRONMENTAL STATEMENT VOLUME 2 PART 17 Application Information · 21 May 2026
  • ENVIRONMENTAL STATEMENT VOLUME 2 PART 18 Application Information · 21 May 2026
  • ENVIRONMENTAL STATEMENT VOLUME 2 PART 19 Application Information · 21 May 2026
  • ENVIRONMENTAL STATEMENT VOLUME 2 PART 20 Application Information · 21 May 2026
  • ENVIRONMENTAL STATEMENT VOLUME 2 PART 21 Application Information · 21 May 2026
  • ENVIRONMENTAL STATEMENT VOLUME 2 PART 22 Application Information · 21 May 2026
  • ENVIRONMENTAL STATEMENT VOLUME 2 PART 23 Application Information · 21 May 2026
  • ENVIRONMENTAL STATEMENT VOLUME 2 PART 24 Application Information · 21 May 2026
  • ENVIRONMENTAL STATEMENT VOLUME 2 PART 25 Application Information · 21 May 2026
  • ENVIRONMENTAL STATEMENT VOLUME 2 PART 26 Application Information · 21 May 2026
  • ENVIRONMENTAL STATEMENT VOLUME 2 PART 27 Application Information · 21 May 2026
  • ENVIRONMENTAL STATEMENT VOLUME 2 PART 28 Application Information · 21 May 2026
  • FEE CALCULATION Application Information · 18 May 2026
  • ECOLOGY AND BIODIVERSITY APPRAISAL Application Information · 18 May 2026
  • PRELIMINARY ECOLOGICAL APPRAISAL Application Information · 18 May 2026
  • FLOOD RISK AND DRAINAGE PART 1 Application Information · 18 May 2026
  • FLOOD RISK AND DRAINAGE PART 2 Application Information · 18 May 2026
  • FLOOD RISK AND DRAINAGE PART 3 Application Information · 18 May 2026
  • SUPERSEDED DESIGN CODE Application Information · 18 May 2026
  • SUPERSEDED DESIGN CODE Application Information · 18 May 2026
  • SUPERSEDED DESIGN CODE Application Information · 18 May 2026
  • SUPERSEDED DESIGN CODE Application Information · 18 May 2026
  • SUPERSEDED DESIGN CODE Application Information · 18 May 2026
  • SUPERSEDED DESIGN CODE Application Information · 18 May 2026
  • SUPERSEDED DESIGN CODE Application Information · 18 May 2026
  • SUPERSEDED DESIGN AND ACCESS STATEMENT Application Information · 18 May 2026
  • 24032_01_DESIGN AND ACCESS STATEMENT_PART 4 Drawings · 18 May 2026
  • SUPERSEDED DESIGN CODE Application Information · 18 May 2026
  • SITE WIDE TRAVEL PLAN Application Information · 18 May 2026
  • COVERING LETTER Application Information · 18 May 2026
  • SUPERSEDED DEVELOPMENT SPECIFICATION Application Information · 18 May 2026
  • SUPERSEDED PARKING MANAGEMENT PLAN Application Information · 18 May 2026
  • TRANSPORT ASSESSMENT (PART 1 OF 2) Application Survey / Assessment / Statement · 18 May 2026
  • DRAINAGE STRATEGY REPORT Application Information · 18 May 2026
  • ENVIRONMENTAL STATEMENT VOLUME 1 Application Information · 18 May 2026
  • ENVIRONMENTAL STATEMENT VOLUME 3 Application Information · 18 May 2026
  • FLOOD RISK ASSESSMENT Application Survey / Assessment / Statement · 18 May 2026
  • MINUTES OF LANDSCAPE - RELATED PPA MEETINGS Application Information · 18 May 2026
  • OUTLINE ENVIRONMENTAL MANAGEMENT PLAN PART 1 Application Information · 18 May 2026
  • OUTLINE ENVIRONMENTAL MANAGEMENT PLAN PART 2 Application Information · 18 May 2026
  • OUTLINE ENVIRONMENTAL MANAGEMENT PLAN PART 3 Application Information · 18 May 2026
  • OUTLINE ENVIRONMENTAL MANAGEMENT PLAN PART 4 Application Information · 18 May 2026
  • OUTLINE ENVIRONMENTAL MANAGEMENT PLAN PART 5 Application Information · 18 May 2026
  • OUTLINE OPERATIONAL WASTE MANAGEMENT STRATEGY Application Information · 18 May 2026
  • OUTLINE SITE CONSTRUCTION MANAGEMENT PLAN Application Information · 18 May 2026
  • SUPERSEDED OUTLINE PUBLIC ART STRATEGY Application Information · 18 May 2026
  • FEE CALCULATION Application Information · 18 May 2026
  • APPLICATION FORM - NO PERSONAL INFO Application Information · 18 May 2026
  • ATTACHMENT SUMMARY FROM PORTAL Attachment Summary · 18 May 2026
  • CLIMATE CHANGE Application Information · 18 May 2026
  • SUPERSEDED DESIGN AND ACCESS STATEMENT Design and Access Statement · 18 May 2026
  • SUPERSEDED DESIGN AND ACCESS STATEMENT Design and Access Statement · 18 May 2026
  • SUPERSEDED DESIGN AND ACCESS STATEMENT Design and Access Statement · 18 May 2026
  • ENVIRONMENTAL STATEMENT VOLUME 3 TECHNICAL APPENDICES APPENDIX AIR QUALITY Application Information · 18 May 2026
  • SUPERSEDED DESIGN AND ACCESS STATEMENT Design and Access Statement · 18 May 2026
  • TRAFFIC AND MOVEMENT Application Information · 18 May 2026
  • SUPERSEDED DESIGN AND ACCESS STATEMENT Design and Access Statement · 18 May 2026
  • SUPERSEDED DESIGN AND ACCESS STATEMENT Design and Access Statement · 18 May 2026
  • APPENDIX EIA METHODOLOGY Application Information · 18 May 2026
  • SUPERSEDED DESIGN AND ACCESS STATEMENT Design and Access Statement · 18 May 2026
  • SUPERSEDED DESIGN AND ACCESS STATEMENT Design and Access Statement · 18 May 2026
  • ARCHAEOLOGICAL DESK BASED ASSESSMENT 1 OF 2 Application Survey / Assessment / Statement · 18 May 2026
  • ARCHAEOLOGICAL DESK BASED ASSESSMENT 2 OF 2 Application Survey / Assessment / Statement · 18 May 2026
  • BIODIVERSITY NET GAIN APPRAISAL Application Information · 18 May 2026
  • PLANNING STATEMENT Application Survey / Assessment / Statement · 18 May 2026
  • USER GUIDE Application Information · 18 May 2026
  • ENVIRONMENTAL STATEMENT Application Survey / Assessment / Statement · 18 May 2026
  • ECONOMIC ASSESSMENT Application Survey / Assessment / Statement · 18 May 2026
  • ENERGY STATEMENT Application Survey / Assessment / Statement · 18 May 2026
  • ENVIRONMENTAL STATEMENT VOLUME 1 - CHAPTER 2 - EIA METHODOLOGY Application Information · 18 May 2026
  • ENVIRONMENTAL STATEMENT VOLUME 1 - CHAPTER 3 - ALTERNATIVES AND DESIGN EVOLUTION Application Information · 18 May 2026
  • ENVIRONMENTAL STATEMENT VOLUME 1 CHAPTER 5 - DEMOLITION AND CONSTRUCTION Application Information · 18 May 2026
  • ENVIRONMENTAL STATEMENT VOLUME 1 - CHAPTER 6 - SOCIO-ECONOMICS Application Information · 18 May 2026
  • SUPERDED CHAPTER 7 - HEALTH Application Information · 18 May 2026
  • ENVIRONMENTAL STATEMENT VOLUME 1 - CHAPTER 8 - TRAFFIC AND MOVEMENT Application Information · 18 May 2026
  • CHAPTER 9 - AIR QUALITY Application Information · 18 May 2026
  • SUPERSEDED ENVIRONMENTAL STATEMENT VOLUME 1 CHAPTER 10 - NOISE AND VIBRATION Application Information · 18 May 2026
  • ENVIRONMENTAL STATEMENT VOLUME 1 - CHAPTER 11 - ECOLOGY AND BIODIVERSITY Application Information · 18 May 2026
  • ENVIRONMENTAL STATEMENT VOLUME 1 - CHAPTER 12 - WATER RESOURCE, FLOOD RISK AND DRAINAGE Application Information · 18 May 2026
  • ENVIRONMENTAL STATEMENT VOLUME 1 - CHAPTER 13 - CLIMATE CHANGE Application Information · 18 May 2026
  • ENVIRONMENTAL STATEMENT VOLUME 1 - CHAPTER 14 - EFFECT INTERACTIONS Application Information · 18 May 2026
  • ENVIRONMENTAL STATEMENT VOLUME 1 - CHAPTER 15 - SIGNIFICANT EFFECTS Application Information · 18 May 2026
  • ENVIRONMENTAL STATEMENT VOLUME 1 - CHAPTER 16 - ENVIRONMENTAL MANAGEMENT, MITIGATION Application Information · 18 May 2026
  • ENVIRONMENTAL STATEMENT VOLUME 1 - CHAPTER 4 - PROPOSED DEVELOPMENT Application Information · 18 May 2026
  • FLOOD RISK ASSESSMENT Application Survey / Assessment / Statement · 18 May 2026
  • APPENDIX 02-FIGURES Drawings · 18 May 2026
  • APPENDIX 03-PHOTOS AND AVRS (VP10-12) Photographs · 18 May 2026
  • APPENDIX 03-PHOTOSHEETS AND AVRS (VP15-17) Photographs · 18 May 2026
  • APPENDIX 03-PHOTOSHEETS AND AVRS (VP19-21) Photographs · 18 May 2026
  • APPENDIX 03-PHOTOSHEETS AND AVRS (VP2-9) Photographs · 18 May 2026
  • APPENDIX 03-PHOTOSHEETS AND AVRS (VP22-29) Photographs · 18 May 2026
  • APPENDIX 03-PHOTOSHEETS AND AVRS (VP30-34) Drawings · 18 May 2026
  • APPENDIX 03-PHOTOSHEETS AND AVRS (VP35-37) Photographs · 18 May 2026
  • APPENDIX 01 DETAILED METHODOLOGY Application Information · 18 May 2026
  • APPENDIX 04 CORRESPONDENCE Application Information · 18 May 2026
  • LANDSCAPE AND VISUAL IMPACT ASSESSMENT Application Survey / Assessment / Statement · 18 May 2026
  • PHASE 1 PRELIMINARY RISK ASSESSMENT Application Survey / Assessment / Statement · 18 May 2026
  • SUPERSEDED PARAMETER PLANS Drawings · 18 May 2026
  • SUPERSEDED PARAMETER PLANS Drawings · 18 May 2026
  • SUPERSEDED PARAMETER PLANS Drawings · 18 May 2026
  • SUPERSEDED PARAMETER PLANS Drawings · 18 May 2026
  • SUPERSEDED PARAMETER PLANS Drawings · 18 May 2026
  • SUPERSEDED PARAMETER PLANS Drawings · 18 May 2026
  • SUPERSEDED PARAMETER PLANS Drawings · 18 May 2026
  • SITE LOCATION PLAN EXISTING Drawings · 18 May 2026
  • SITE PLAN EXISTING WITH LEVELS Drawings · 18 May 2026
  • STATEMENT OF COMMUNITY ENGAGEMENT Application Information · 18 May 2026
  • SUSTAINABILITY STATEMENT Application Survey / Assessment / Statement · 18 May 2026
  • TRANSPORT ASSESSMENT (PART 2 OF 2) Application Survey / Assessment / Statement · 18 May 2026
  • TREE SURVEY Application Information · 18 May 2026
  • SUPERSEDED UTILITIES STATEMENT REPORT Application Survey / Assessment / Statement · 18 May 2026
  • WORKFORCE ACCESSIBILITY Application Information · 18 May 2026
  • STATUTORY BIODIVERSITY METRIC Application Information · 18 May 2026
  • CAMBRIDGE INDEPENDENT FRONT PAGE MAY 13TH 2026 Application Information · 18 May 2026
  • CAMBRIDGE INDEPENDENT PAGE 66 MAY 13TH 2026 Application Information · 18 May 2026

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Cambridge for determination, against a statutory target of eight weeks. Over the last year Cambridge's median decision took 52 days. More in our guide to how long planning decisions take.

About outline applications

An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Cambridge

  • 26/02745/SCRE Decided

    William James House Cowley Road Cambridge Cambridgeshire CB4 0WX

    EIA Screening Opinion under the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 for the Proposed Development comprises the demolition of the existing buildings and the redevelopment of the Site to provide four mid-tech units within flexible commercial Use Classes E(g)(ii), E(g)(iii), B2 and B8, together with associated reception/office accommodation, car and cycle parking, servicing yards, substation, landscaping, Sustainable Drainage Systems (SuDS) including an attenuation basin, and associated infrastructure works.

    21 Jul 2026 Outline
  • 26/01438/OUT Refused

    47 Histon Road Cambridge Cambridgeshire CB4 3JD

    Outline application for the erection of a two storey one bed self/custom build detached dwelling in the rear garden of 47 Histon Road with some matters reserved except for access, layout and scale.

    15 Apr 2026 Outline
  • 26/02355/SCRE Decided

    14-18 George IV Street And 20 - 22 Hills Road Cambridge Cambridgeshire CB2 1PF

    EIA Screening Opinion under the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 for proposed development at 14-18 George Street and 20-22 Hills Road

    22 Jun 2026 Outline
  • 26/02567/OUT Awaiting decision

    Cambridge Business Park Cowley Road Cambridge CB4 0WZ

    Outline planning application with all matters reserved (save for means of access), for a flexible phased development in separate and severable components comprising the demolition and retention of existing buildings and erection of new buildings to provide: (i) employment generating floorspace comprising Use Class E(g)(i) (offices) and Use Class E(g)(ii) (research and development),flexible Class E(a-f) and Classes F1 and F2 for retail, leisure, community uses and Sui Generis including associated plant, (ii) residential development in Use Class C3 and Sui Generis (co-living), and associated plant, (iii) erection of mobility hubs (Sui Generis) for vehicular and cycle parking and associated plant, and (iv) means of access comprising new pedestrian, cycle and vehicular accesses from Cowley Road, new pedestrian and cycle accesses from the Cambridgeshire Guided Busway, provision of a new bus stop and crossing points of the Guided Busway, open spaces, landscaping, and associated infrastructure.

    2 Jul 2026 Outline
  • 26/02525/OUT Awaiting decision

    210 Queen Ediths Way Cambridge Cambridgeshire CB1 8NL

    Outline application for the erection of 1no 3bed dwelling.

    2 Jul 2026 Outline