Skip to content
PlanIndex Get alerts
Menu

Planning application

Solar Farm Bowls Lane Penyrheol Caerphilly

Awaiting decision Caerphilly 26/0261/NMA Non-Material Amendments

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Seek approval of a non-material amendment to planning consent 23/0116/DNS(Construct and operate a Solar Photovoltaic (PV) Farm - Development of National Significance) to update a limited number of approved drawings to reflect the updated design without altering the nature, scale, or environmental effects of the approved development. The proposed amendment aims to reflect the final dimensions and orientation of the components that will be installed on the site, and the planned internal route for the cable easement which has been updated to minimise the cable use and associated groundwork required

As published by the council, reference 26/0261/NMA

Application record

Reference
26/0261/NMA
Type
Non-Material Amendments
Status
Awaiting decision
Received
13 Apr 2026
Validated
13 Apr 2026
Ward
Aber Valley
Decision by
Delegated

Site history

Applications at this address on the Caerphilly register

This site has had 2 applications since 2026.

  • 26/0371/NMA Awaiting decision

    Solar Farm Bowls Lane Penyrheol Caerphilly

    Seek approval of a non-material amendment to planning consent 23/0116/DNS (Construct and operate a Solar Photovoltaic (PV) Farm - Development of National Significance) to propose amendment which aims to reflect the final dimensions and orientation of the components that will be installed on the site

    Submitted 28 May 2026 Amendments

Timeline

Dates from the published record

  1. 13 Apr 2026

    Received by Caerphilly

  2. 28 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 8 June 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Caerphilly took a median of 55 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

12 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Caerphilly for determination, against a statutory target of eight weeks. Over the last year Caerphilly decided amendment applications in a median of 25 days. More in our guide to how long planning decisions take.

About amendment applications

An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Cwm Ifor Farm Bowls Lane Penyrheol Caerphilly CF83 2TU

    26/0315/COND Submitted 1 May 2026 0m away

    100% historically approved · decision due ~26 Jun

    Discharge conditions 07 (Access-Materials) and 08 (Road Surface Materials) of planning consent 23/0116/DNS (Construct and operate a Solar Photovoltaic (PV) Farm - Development of National Significance)

    Awaiting decision Conditions 7 docs
  • Solar Farm (Cwm Ifor) Bowls Lane Penyrheol Caerphilly

    26/0302/COND Submitted 27 Apr 2026 0m away

    100% historically approved · decision due ~22 Jun

    Discharge conditions 9 (Temporary Compound & Decanting Area Plan), 10 (Method for Cable Works), 12 (Details of Materials) ,15 (Construction Environmental Management Plan (CEMP), 16 (Environmental Management Plan (EMP) of planning consent 23/0116/DNS (Construct and operate a Solar Photovoltaic (PV) Farm - Development of National Significance)

    Awaiting decision Conditions 16 docs

In Caerphilly

  • 26/0595/NMA Awaiting decision

    Beddau Farm 2 St Cenydd Road Trecenydd Caerphilly CF83 2TB

    Seek approval of a non-material amendment to planning consent 08/0310/FULL (Convert Grade II listed roofless ruin into 2 two-bedroom) to allow amendments to the approved drawings comprising the reinstatement of a former historic door opening within the external wall of the listed barn

    4 Sep 2026 Amendments
  • 26/0594/NMA Awaiting decision

    Tredegar Junction Hotel Commercial Street Pontllanfraith Blackwood NP12 2JY

    Seek approval of a non-material amendment to planning consent 25/0814/FULL (Erect residential development consisting of 36 affordable apartments, landscaping, car parking, drainage and associated works) to amend the trigger points for Conditions 8 (Lighting), 13 (Highway Improvements), 15 (Parking Bollards) and 18 (Bin Storage) from "prior to commencement" to "prior to beneficial use".

    4 Sep 2026 Amendments
  • 26/0587/NMA Awaiting decision

    5 Nant-y-ffyddlon Penpedairheol Hengoed CF82 8DQ

    Seek approval of a non-material amendment to planning consent 26/0403/HH (Erect two storey side extension) to amend extension width from 2100mm to be 2700mm

    3 Sep 2026 Amendments
  • 26/0547/NMA Awaiting decision

    The Meadows Farm Village Retreat The Meadows Gypsy Lane Groeswen Cardiff CF15 7UN

    Seek approval of a non material amendment to planning consent 25/0632/NCC (Vary conditions 04 (Cafe and coffee shop use restriction) and 05 (Hours General) of planning consent 24/0557/NCC (Vary Condition 4 & 5 of planning consent 22/0713/RET to amend opening hours)) to amend the initial wording of Conditions 8, 10 and 11 to require the details required by these conditions to be submitted, only to the Local Planning Authority within 9 months of the date of this permission, i.e. by the 17 September 2026 (rather than the currently stated 3 months)

    17 Aug 2026 Amendments
  • 26/0228/NMA Granted

    Ffos Caerffili Park Lane Caerphilly

    Seek approval of a non-material amendment to planning consent 23/0273/FULL to permit the construction of structural frame to north of existing building

    31 Mar 2026 Amendments