Proposal
Construction and operation of a Battery Energy Storage System (BESS) and associated infrastructure including battery container units, medium voltage stations, 400/132/33kV substation, 2 No. 33kV customer substation, DNO control room, storage and welfare containers, fire water pumphouse, water storage tank, CCTV cameras, fencing, security gates, access tracks, landscaping and attenuation pond.
As published by the council, reference 2025/2275
Application record
- Reference
- 2025/2275
- Type
- Full
- Status
- Pending Consideration
- Received
- 25 Jul 2025
- Validated
- 25 Jul 2025
- Ward
- Cringleford
- Parish
- Keswick And Intwood
Site history
Applications at this address on the Broadland register
This site has had 2 applications since 2025.
-
2025/2385 Decided
Land East Of Mulbarton Road Keswick Norfolk
Request for EIA screening Opinion under the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 for proposed 400MW/800MW battery energy storage system (BESS) and associated infrastructure
Timeline
Dates from the published record
-
25 Jul 2025
Received by Broadland
-
20 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 19 September 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Broadland took a median of 51 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
DWD Property and Planning Limited Agent, a planning consultancy registered in Helsby
Active · incorporated 2023 · Helsby
112 applications on PlanIndex · across 33 councils · 93% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
221 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Broadland for determination, against a statutory target of eight weeks. Over the last year Broadland decided full applications in a median of 106 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Land East Of Mulbarton Road Keswick Norfolk
84% historically approved · decision due ~19 Sep
Construction and operation of a Battery Energy Storage System (BESS) and associated infrastructure including battery container units, medium voltage stations, 400/132/33kV substation, 2 No. 33kV customer substation, DNO control room, storage and welfare containers, fire water pumphouse, water storage tank, CCTV cameras, fencing, security gates, access tracks, landscaping and attenuation pond.
Awaiting decision Full applications 221 docs -
Land East Of Mulbarton Road Keswick Norfolk
Request for EIA screening Opinion under the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 for proposed 400MW/800MW battery energy storage system (BESS) and associated infrastructure
Decided Outline 41 docs -
Harford Park And Ride Ipswich Road Keswick Norfolk NR4 6DY
Harford Park and Ride - Minor Material Amendment: Non-compliance with condition 2 of planning permission FUL/2020/0040 to allow an alternative material (brick) for the construction of the reuse building and welfare unit. THIS WILL BE DEALT WITH BY NCC - NCC REF FUL/2021/0055
Granted Other 2 docs -
Harford Park And Ride Ipswich Road Keswick Norfolk NR4 6DY
Harford Park & Ride, Ipswich Road, Norwich, Norfolk NR4 6US: Discharge of condition 7 of permission ref. FUL/2020/0040 (Surface Water Drainage Scheme/Groundwater Activity Permit) - THIS APPLICATION WILL BE DETERMINED BY NORFOLK COUNTY COUNCIL DIS/2021/0042
Granted Other 2 docs -
Harford Park And Ride Ipswich Road Keswick Norfolk NR4 6DY
Harford Park & Ride, Ipswich Road, Norwich, Norfolk NR4 6US: Discharge of condition 7 of permission ref. FUL/2020/0040 (Surface Water Drainage Scheme/Groundwater Activity Permit) - THIS APPLICATION WILL BE DETERMINED BY NORFOLK COUNTY COUNCIL DIS/2021/0042
Granted Other 2 docs -
Harford Park And Ride Ipswich Road Keswick Norfolk NR4 6DY
Harford Park and Ride - Minor Material Amendment: Non-compliance with condition 2 of planning permission FUL/2020/0040 to allow an alternative material (brick) for the construction of the reuse building and welfare unit. THIS WILL BE DEALT WITH BY NCC - NCC REF FUL/2021/0055
Granted Other 2 docs
Other full applications
In Broadland
-
2025/2954 Granted
Land On The Junction Of Sunnyside And Chapel Hill Woodton Norfolk
Erection of one detached self-build dwelling with associated access, parking, garage, garden space, landscaping, sustainable drainage and biodiversity enhancements
-
2026/2068 Granted
Jack In The Box Nursery Hempnall Road Morningthorpe Norfolk NR15 2LL
Retrospective planning application for the installation of external lighting
-
2026/1236 Granted
Petrol Filling Station Morrisons Victoria Road Diss Norfolk
Extension to the existing petrol filling station's sales building for the creation of hot food takeaway, installation of kitchen extraction equipment, new bin store, demolition of the existing jet wash and car wash and associated forecourt works.
-
2026/0974 Granted
Cemetery St Faiths Road Old Catton Norfolk
Change of Use of agricultural land to extend the existing cemetery
-
2026/1695 Granted
86 Bromedale Avenue Mulbarton Norfolk NR14 8GG
Part change of use of garage to hair studio