Planning application
Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth.
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Formal Submission to discharge of Requirement 6(1)(f) (Emergency Response Plan for Flood Events for Stage 10.1 of the authorised development) of the National Grid (Hinkley Point C Connection Project) Order 2016 (as amended)
As published by the council, reference 23/P/0407/DCM
Application record
- Reference
- 23/P/0407/DCM
- Type
- Development Consent Order - Major
- Status
- Decided
- Decision
- Granted As published: Approve
- Received
- 21 Feb 2023
- Validated
- 21 Feb 2023
- Decided
- 18 Apr 2023
- Parish
- Unparished
- Decision by
- Delegated Decision
Site history
Applications at this address on the Bristol, City of register
This site has had 26 applications since 2019: 26 approved, 0 refused.
-
26/P/1284/DCM Granted
Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth.
Formal submission to extend the time for discharge of Requirements 15 (Reinstatement schemes) and 20 (Removal of temporary bridges and culverts) for Stage 10.1 of the authorised development) of the National Grid (Hinkley Point C Connection Project) Order 2016 (as Amended).
-
26/P/0912/DCM Granted
Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth.
Formal submission to extend the time to discharge Requirements 15 (Reinstatement schemes) and 20 (Removal of temporary bridges and culverts) for Stage 2.1 of the authorised development) of the National Grid (Hinkley Point C Connection Project) Order 2016 (as Amended).
-
25/P/2633/DCM Granted
Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth
Formal submission to discharge Requirement 15 (Reinstatement schemes) for Stage 10.1 of the authorised development) of the National Grid (Hinkley Point C Connection Project) Order 2016 (as Amended).
-
25/P/1772/DCM Granted
Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth
Formal submission to discharge Requirement 15 (Reinstatement schemes) for Stage 2.1 of the authorised development) of the National Grid (Hinkley Point C Connection Project) Order 2016 (as Amended).
-
25/P/1750/DCM Granted
Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth
Formal submission to discharge Requirement 22 (Highway Works (Bellmouth Design)) for Stage 7.1 of the authorised development) of the National Grid (Hinkley Point C Connection Project) Order 2016 (as Amended).
-
25/P/1749/DCM Granted
Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth.
Formal submission to discharge Requirement 5(2)(d) (Construction Traffic Management Plan Addendum) for Stage 7.1 of the authorised development) of the National Grid (Hinkley Point C Connection Project) Order 2016 (as Amended).
-
23/P/0240/DCM Granted
Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth.
Formal submission to discharge Requirement 5(2)(b) (Biodiversity Mitigation Strategy for Stage 10.1 of the authorised development) of the National Grid (Hinkley Point C Connection Project) Order 2016 (as Amended).
-
22/P/2976/DCM Granted
Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth.
Formal submission to discharge Requirement 10 (Scheme of Replacement Planting for Stage 8 of the authorised development) of the National Grid (Hinkley Point C Connection Project) Order 2016 (as Amended).
-
22/P/2194/DCO Granted
Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth
Formal Submission to discharge of Requirement 20 (Removal of temporary bridges and culverts for Stage 2.1 of the authorised development) of the National Grid (Hinkley Point C Connection Project) Order 2016
-
21/P/1782/DCM Granted
Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth
Formal submission to discharge Requirement 18 (Contaminated land and Groundwater for Stage 10.1 of the authorised development) of the National Grid (Hinkley Point C Connection Project) Order 2016 (as Amended).
Timeline
Dates from the published record
-
21 Feb 2023
Received by Bristol, City of
-
18 Apr 2023
Decision issued: Approve
-
28 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Arup Agent, registered in London
Active · incorporated 1990 · London
254 applications on PlanIndex · across 56 councils · 99% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordNational Grid PLC Applicant, registered in London
Active · incorporated 2000 · London
94 applications on PlanIndex · across 30 councils · 100% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
10 documents on file for this application
- REVISED DELEGATED REPORT
- DECISION (DCM) APPROVE
- DELEGATED REPORT DCO/DMO
- DELEGATED REPORT DCO/DMO
- APPLICATIONFORMREDACTED
- HCP - 10.1 6F F - APPENDIX A - MUSTER POINT LOCATION PLAN (1 OF 4)
- HCP - 10.1 6F F - APPENDIX A - MUSTER POINT LOCATION PLAN (2 OF 4)
- HCP - 10.1 6F F - APPENDIX A - MUSTER POINT LOCATION PLAN (3 OF 4)
- HCP - 10.1 6F F - APPENDIX A - MUSTER POINT LOCATION PLAN (4 OF 4)
- HCP - 10.1 6F F - EMERGENCY RESPONSE PLAN FOR FLOOD EVENTS
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Bristol, City of granted permission on 18 April 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In Bristol, City of
-
26/P/0622/FUL Granted
Elmfield Cottage Bristol Road Churchill BS25 5NL
Proposed erection of 2no. detached dwelling and creation of associated access.
-
26/P/1380/FUL Granted
Moon And Sixpence 15 The Beach Clevedon BS21 7QU
Extend existing terrace and form new timber balustrading.
-
26/P/1031/FUL Refused
17 Hill Road Clevedon BS21 7NE
Proposed vehicle entrance and new driveway to Woodspring House from existing pedestrian access position to serve parking and turning area at lower ground floor level of the garden. Demolition of a small section of boundary wall and reduced height for small distance to create required visibility and opening for vehicle access, re-use of stone to construct supporting side retaining stone walls and re-use of the few stone steps remaining as entrance threshold for historic reasons. Relocation of cycle/bin/recycling store within driveway area. Removal of sloping tree and new planting.
-
26/P/0108/FUL Granted
Veterinary Surgery 5 Lower Queens Road Clevedon BS21 6LX
Erection of 2no. dwellinghouses. Erection of a two-storey rear extension to existing building to facilitate the change of use of the first floor from a commercial use (Class E) to 1no. self-contained flat
-
26/P/0044/FUL Granted
1 - 3 New Bristol Road Weston-super-Mare BS22 6AD
Retrospective planning application for the proposed erection of a single storey extension to the existing sales building, to be occupied by Greggs PLC, and associated works.