Skip to content
PlanIndex Get alerts
Menu

Planning application

Bleadon Quarry Bridge Road Bleadon BS24 0AU

Granted Bristol, City of 22/P/2113/RM Reserved matters application

Works: Demolition Major scheme

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Reserved matters application for appearance, landscaping, layout and scale for the erection of 42no. dwellings and office building pursuant to outline permission 19/P/0835/OUT (outline application with details of access (matters of layout, scale, appearance and landscaping are reserved) for the demolition of all industrial buildings, plant and machinery, the erection of up to 42 dwellings and 500 sqm of flexible Use Class A2/B1/D1 floor space, open space, landscaping, new vehicle and pedestrian access, and associated works)

As published by the council, reference 22/P/2113/RM

Application record

Reference
22/P/2113/RM
Type
Reserved matters application
Status
Decided
Decision
Approve
Received
31 Aug 2022
Validated
21 Sep 2022
Decided
25 Apr 2023
Ward
Hutton And Locking
Parish
Bleadon
Decision by
Delegated Decision
Postcode
BS24 0AU

Site history

Applications at this address on the Bristol, City of register

This site has had 3 applications since 2022: 3 approved, 0 refused.

  • 23/P/0979/MOD Granted

    Bleadon Quarry Bridge Road Bleadon BS24 0AU

    Modification and discharge of obligation in the S106 agreement in Paragraph 3.2 of Schedule 2 for Public Open Space Provision relating to Outline planning permission 19/P/0835/OUT

    Decided 13 Jul 2026 Conditions
  • 22/P/2108/NMA Granted

    Bleadon Quarry Bridge Road Bleadon BS24 0AU

    Non material amendment to application 19/P/0835/OUT (outline application with details of access (matters of layout, scale, appearance and landscaping are reserved) for the demolition of all industrial buildings, plant and machinery, the erection of up to 42 dwellings and 500 sqm of flexible Use Class A2/B1/D1 floor space, open space, landscaping, new vehicle and pedestrian access, and associated works) to allow for the amendment to the wording of Condition 19 (footpaths)

    Decided 24 Apr 2023 Amendments

Timeline

Dates from the published record

  1. 31 Aug 2022

    Received by Bristol, City of

  2. 21 Sep 2022

    Validated

    Checked as complete and ready for consideration.

  3. 25 Apr 2023

    Decision issued: Approve

  4. 28 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, a planning consultancy registered in Bristol

89 applications on PlanIndex · across 15 councils · 92% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Applicant on file

2 applications on PlanIndex

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

136 documents on file for this application

  • HIGHWAYS & TRANSPORT - CONSULTATION REPLY Consultation Reply · 26 Apr 2023
  • DECISION (RESERVED MATTERS) APPROVE Decision Notice · 25 Apr 2023
  • NORTH SOMERSET OFFICER REPORT Delegated Report · 25 Apr 2023
  • UPDATE TO LANDSCAPE SCHEME Email · 20 Apr 2023
  • UPDATE TO LANDSCAPE SCHEME Letter from Agent · 19 Apr 2023
  • SAFE ROUTE TO SCHOOL Amended Plan · 17 Apr 2023
  • SAFE ROUTE TO SCHOOL Amended Plan · 17 Apr 2023
  • SAFE ROUTE TO SCHOOL Amended Plan · 17 Apr 2023
  • SAFE ROUTE TO SCHOOL Amended Plan · 17 Apr 2023
  • SAFE ROUTE TO SCHOOL Amended Plan · 17 Apr 2023
  • TREE PIT DETAIL Amended Plan · 05 Apr 2023
  • PROPOSED SOFTWORK SCHEDULE Amended Plan · 05 Apr 2023
  • MANAGEMENT AND MAINTENANCE PLAN Amended Plan · 05 Apr 2023
  • ILLUSTRATIVE MASTERPLAN Amended Plan · 05 Apr 2023
  • SOFTWORKS SHEETS 1 - 4 INC Amended Plan · 05 Apr 2023
  • PLANTING DETAILS Amended Plan · 05 Apr 2023
  • TREE RETENTION/REMOVAL PLAN Amended Plan · 05 Apr 2023
  • GENERAL ARRANGEMENT PLAN Amended Plan · 05 Apr 2023
  • HEDGE DETAIL Amended Plan · 05 Apr 2023
  • ENGINEERING LAYOUT Plan · 03 Apr 2023
  • VEHICLE TRACKING Plan · 03 Apr 2023
  • DRAINAGE LAYOUT Plan · 03 Apr 2023
  • VEHICLE TRACKING - SITE ACCESS Plan · 03 Apr 2023
  • NORTHERN FOOTPATH LINK Plan · 03 Apr 2023
  • BLEADON QUARRY - LIGHTING STRATEGY_P3 Other · 03 Apr 2023
  • ARBORICULTURAL METHOD Arboricultural statement · 03 Apr 2023
  • HABITATS REGULATIONS SCREENING ASSESSMENT Report · 03 Apr 2023
  • BLEADON QUARRY SITE - AGREED MARKETING STRATEGY 20.03.2023 Other · 03 Apr 2023
  • LAYOUT PLAN Plan · 03 Apr 2023
  • SITE LOCATION PLAN OS Extract · 03 Apr 2023
  • EXISTING SITE / DEMOLITION PLAN Plan · 03 Apr 2023
  • MATERIALS LAYOUT Plan · 03 Apr 2023
  • STOREY HEIGHTS Plan · 03 Apr 2023
  • AFFORDABLE LAYOUT Plan · 03 Apr 2023
  • PARKING LAYOUT Plan · 03 Apr 2023
  • PART M LAYOUT Plan · 03 Apr 2023
  • REFUSE & CYCLE STRATEGY Plan · 03 Apr 2023
  • ENERYGY LAYOUT PLAN Plan · 03 Apr 2023
  • BUNDED ROCK FALL AREA Plan · 03 Apr 2023
  • HOUSE TYPE MONMOUTH FLOOR PLANS AND ELEVATIONS Plan · 03 Apr 2023
  • HOUSE TYPE IDRIS FLOOR PLANS AND ELEVATIONS Plan · 03 Apr 2023
  • HOUSE TYPE CONWY FLOOR PLAN AND ELEVATIONS Plan · 03 Apr 2023
  • ADDITIONAL SITE SECTIONS Correspondence · 13 Mar 2023
  • MASTERPLAN WITH HIGHLIGHTED EDGE OF ROCKFALL ZONE Correspondence · 13 Mar 2023
  • SITE SECTIONS PLAN. Plan · 22 Feb 2023
  • SHEET 2 - SITE SECTIONS PLAN. Plan · 22 Feb 2023
  • CRIME PREVENTION OFFICER Consultation Reply · 13 Jan 2023
  • 03.01.23 AMENDED ARBORICULTURAL REPORT Amended Plan · 10 Jan 2023
  • SOMERSET DRAINAGE BOARDS CONSORTIUM Consultee Comment · 23 Dec 2022
  • STREET SCENES Amended Plan · 22 Dec 2022
  • ENERGY LAYOUT Amended Plan · 22 Dec 2022
  • REFUSE & CYCLE STRATEGY Amended Plan · 22 Dec 2022
  • PART M LAYOUT Amended Plan · 22 Dec 2022
  • BOUNDARY TREATMENTS LAYOUT PLAN Amended Plan · 22 Dec 2022
  • PARKING LAYOUT Amended Plan · 22 Dec 2022
  • AFFORDABLE LAYOUT Amended Plan · 22 Dec 2022
  • STOREY HEIGHTS LAYOUT PLAN Amended Plan · 22 Dec 2022
  • MATERIALS LAYOUT Amended Plan · 22 Dec 2022
  • MASTER LAYOUT PLAN Amended Plan · 22 Dec 2022
  • ENGINEERING LAYOUT PLAN Amended Plan · 22 Dec 2022
  • VEHICLE TRACKING PLAN Amended Plan · 22 Dec 2022
  • DRAINAGE LAYOUT PLAN Amended Plan · 22 Dec 2022
  • VEHICLE TRACKING SITE ACCESS Amended Plan · 22 Dec 2022
  • TREE RETENTION/REMOVAL PLAN Amended Plan · 22 Dec 2022
  • GENERAL ARRANGEMENT PLAN Amended Plan · 22 Dec 2022
  • 220519 L 04 01 A SOFTWORKS SHEETS 1-4 Amended Plan · 22 Dec 2022
  • 220519 R 04 02 A MAINTENANCE & MANAGEMENT PLAN Application Support Info · 22 Dec 2022
  • 220519 R 04 01 A PROPOSED SOFTWORK SCHEDULE Application Support Info · 22 Dec 2022
  • BLEADON QUARRY CGI 220818 Application Support Info · 22 Dec 2022
  • AFFORDABLE LAYOUT Amended Plan · 09 Dec 2022
  • 07/10/2022 - FLOOD RISK MANAGEMENT TEAM COMMENTS Consultation Reply · 08 Dec 2022
  • 07/11/2022 - HIGHWAYS & TRANSPORT COMMENTS Consultation Reply · 15 Nov 2022
  • 03.11.22 - NATURAL ENGLAND RESPONSE COMMENTS. Consultation Reply · 03 Nov 2022
  • 24.10.22 - ENVIRONMENT-AGENCY Consultation Reply · 25 Oct 2022
  • 17.10.22 - CRIME PREVENTION DESIGN ADVISOR Consultation Reply · 18 Oct 2022
  • 07/10/2022, FLOOD RISK MANAGEMENT TEAM Consultee Comment · 07 Oct 2022
  • 03.10.22 - ENVIRONMENTAL PROTECTION TEAM COMMENTS. Consultation Reply · 05 Oct 2022
  • 06/10/2022 - WESTON & SOMERSET MERCURY Press Advert · 30 Sep 2022
  • 2311_100A - ENGINEERING LAYOUT Plan · 21 Sep 2022
  • 2311_101A- VEHICLE TRACKING Plan · 21 Sep 2022
  • 2311_200 - DRAINAGE LAYOUT Plan · 21 Sep 2022
  • 170 OFFICE BLOCK FLOOR PLANS AND ELEVATIONS Plan · 21 Sep 2022
  • UPDATED ECOLOGICAL ASSESSMENT - SEPT 2022 Ecological report · 21 Sep 2022
  • APPLICATIONFORMREDACTED Application Form · 31 Aug 2022
  • SITE LOCATION PLAN OS Extract · 31 Aug 2022
  • 100 SITE LAYOUT PLAN Plan · 31 Aug 2022
  • 102 EXISTING SITE AND DEMOLITION PLAN Plan · 31 Aug 2022
  • 103 MATERIALS LAYOUT Plan · 31 Aug 2022
  • 104 STOREY HEIGHTS Plan · 31 Aug 2022
  • 105 AFFORDABLE LAYOUT Plan · 31 Aug 2022
  • 106 PARKING LAYOUT Plan · 31 Aug 2022
  • 108 ACCESSIBLE HOUSING PART M Plan · 31 Aug 2022
  • 109 REFUSE AND CYCLE STRATEGY Plan · 31 Aug 2022
  • 157 IDRIS FLOOR PLANS AND ELEVATIONS Plan · 31 Aug 2022
  • 110 ENERGY LAYOUT Plan · 31 Aug 2022
  • 111 SITE SECTIONS Plan · 31 Aug 2022
  • 112 STREET SCENES Plan · 31 Aug 2022
  • 113 BAT ROOST HOUSE Plan · 31 Aug 2022
  • 150 KINGSHOLM FLOOR PLANS AND ELEVATIONS Plan · 31 Aug 2022
  • 151 KINGSHOLM CORNER FLOOR PLANS AND ELEVATIONS Plan · 31 Aug 2022
  • 152 MONMOUTH FLOOR PLANS AND ELEVATIONS Plan · 31 Aug 2022
  • 153 MONMOUTH CORNER FLOOR PLANS AND ELEVATIONS Plan · 31 Aug 2022
  • 154 TINTERN FLOOR PLANS AND ELEVATIONS Plan · 31 Aug 2022
  • 155 DARTFORD FLOOR PLANS AND ELEVATIONS Plan · 31 Aug 2022
  • 156 1 CHEPSTOW RENDER FLOOR PLANS AND ELEVATIONS Plan · 31 Aug 2022
  • 156 CHEPSTOW BRICK FLOOR PLANS AND ELEVATIONS Plan · 31 Aug 2022
  • 158 1 WYE RENDER FLOOR PLANS AND ELEVATIONS Plan · 31 Aug 2022
  • 158 1 WYE BRICK FLOOR PLANS AND ELEVATIONS Plan · 31 Aug 2022
  • 159 OGMORE FLOOR PLANS AND ELEVATIONS Plan · 31 Aug 2022
  • 160 CONWY FLOOR PLANS AND ELEVATIONS Plan · 31 Aug 2022
  • 161 SINGLE GARAGE Plan · 31 Aug 2022
  • 162 DOUBLE GARAGE Plan · 31 Aug 2022
  • 163 TWIN GARAGE Plan · 31 Aug 2022
  • 164 TRIPLE GARAGE Plan · 31 Aug 2022
  • DRAWING REGISTER 230822 Other · 31 Aug 2022
  • TREE PIT DETAIL Plan · 31 Aug 2022
  • HEDGE DETAIL Plan · 31 Aug 2022
  • BIORETENTION DETAIL Plan · 31 Aug 2022
  • TREE RETENTION/REMOVAL PLAN Plan · 31 Aug 2022
  • GENERAL ARRANGEMENT PLAN Plan · 31 Aug 2022
  • ILLUSTRATIVE MASTERPLAN Plan · 31 Aug 2022
  • SOFTWORKS SHEET 1 Plan · 31 Aug 2022
  • SOFTWORKS SHEET 2 Plan · 31 Aug 2022
  • SOFTWORKS SHEET 3 Plan · 31 Aug 2022
  • SOFTWORKS SHEET 4 Plan · 31 Aug 2022
  • PROPOSED SOFTWORK SCHEDULE Application Support Info · 31 Aug 2022
  • MAINTENANCE AND MANAGEMENT PLAN Application Support Info · 31 Aug 2022
  • ARBORICULTURAL IMPACT ASSESSMENT Application Support Info · 31 Aug 2022
  • ARBORICULTURAL METHOD STATEMENT Application Support Info · 31 Aug 2022
  • LIGHTING STRATEGY Application Support Info · 31 Aug 2022
  • ENERGY STATEMENT Application Support Info · 31 Aug 2022
  • ACCESSIBLE HOUSING STATEMENT Application Support Info · 31 Aug 2022
  • INC AFFORDABLE HOUSING STATEMENT Planning Statement · 31 Aug 2022
  • 107 BOUNDARY TREATMENTS LAYOUT Plan · 31 Aug 2022
  • FORM_1_CIL_ADDITIONAL_INFORMATION CIL Notices · 31 Aug 2022
  • TS001 TOPOGRAPHICAL SURVEY Plan · 31 Aug 2022

Trade members open them from here.

Open the documents

What this grant of permission means

Bristol, City of granted permission on 25 April 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About reserved matters applications

A reserved matters application fills in the detail held back from an earlier outline permission, judged against that permission rather than the principle of development. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Bleadon Quarry Bridge Road Bleadon BS24 0AU

    22/P/2113/RM Submitted 31 Aug 2022 0m away

    Reserved matters application for appearance, landscaping, layout and scale for the erection of 42no. dwellings and office building pursuant to outline permission 19/P/0835/OUT (outline application with details of access (matters of layout, scale, appearance and landscaping are reserved) for the demolition of all industrial buildings, plant and machinery, the erection of up to 42 dwellings and 500 sqm of flexible Use Class A2/B1/D1 floor space, open space, landscaping, new vehicle and pedestrian access, and associated works)

    Granted Reserved matters Demolition 137 docs
    Major scheme
  • Bleadon Quarry Bridge Road Bleadon BS24 0AU

    22/P/2108/NMA Submitted 30 Aug 2022 0m away

    Non material amendment to application 19/P/0835/OUT (outline application with details of access (matters of layout, scale, appearance and landscaping are reserved) for the demolition of all industrial buildings, plant and machinery, the erection of up to 42 dwellings and 500 sqm of flexible Use Class A2/B1/D1 floor space, open space, landscaping, new vehicle and pedestrian access, and associated works) to allow for the amendment to the wording of Condition 19 (footpaths)

    Granted Amendments Demolition 11 docs
    Major scheme
  • Land Known As The Paddock East Of Rockville Bridge Road Bleadon BS24 0AU

    26/P/0614/RM Submitted 18 Mar 2026 0m away

    Reserved Matters application for approval of appearance, landscaping, layout and scale for the erection 3no. dwellings, pursuant to outline planning permission 23/P/1707/OUT

    Granted Reserved matters 22 docs
    Several homes
  • The Nook Bridge Road Bleadon North Somerset BS24 0AU

    23/P/0074/FUH Submitted 11 Jan 2023 0m away

    Proposed erection of a single storey front extension.

    Granted Householder Extension 13 docs
    Small domestic
  • Bleadon Quarry Bridge Road Bleadon BS24 0AU

    23/P/0979/MOD Submitted 11 May 2023 0m away

    Modification and discharge of obligation in the S106 agreement in Paragraph 3.2 of Schedule 2 for Public Open Space Provision relating to Outline planning permission 19/P/0835/OUT

    Granted Conditions 8 docs
  • The Poplars Bridge Road Bleadon Weston-super-Mare BS24 0AU

    25/P/2480/AOC Submitted 1 Dec 2025 0m away

    Request to discharge condition 8 (Surface water drainage details and programme of implementation) on application 23/P/1492/FUL.

    Granted Conditions 5 docs

In Bristol, City of

  • 25/P/2619/RM Granted

    Mendip Garage And Garndiffaith Street End Blagdon BS40 7TL

    Application for approval of reserved matters of appearance and landscaping pursuant to outline planning permission 22/P/1368/OUT (erection of 9 no. self-build dwellings associated access, car parking and landscaping following demolition of existing buildings on Mendip Garage and Garndiffaith sites)

    18 Dec 2025 Reserved matters
  • 26/P/1418/RM Awaiting decision

    Land At Nut Tree Farm Off Barton Road (Opposite Lime Trees) Winscombe BS25 1DU

    Reserved Matters application for approval of appearance, landscaping, layout and scale for the erection of two agricultural workers dwellings, pursuant to outline planning permission 24/P/0203/OUT

    6 Jul 2026 Reserved matters
  • 26/P/0614/RM Granted

    Land Known As The Paddock East Of Rockville Bridge Road Bleadon BS24 0AU

    Reserved Matters application for approval of appearance, landscaping, layout and scale for the erection 3no. dwellings, pursuant to outline planning permission 23/P/1707/OUT

    18 Mar 2026 Reserved matters
  • 25/P/2215/RM Granted

    Land At Weston Rugby Football Club Sunnyside Road North Weston-super-Mare BS23 3PA

    Reserved matters application for appearance, landscaping, layout and scale for Phase 2A comprising a pocket park with associated landscaping pursuant to Outline Planning Permission 21/P/3368/OUT

    23 Oct 2025 Reserved matters
  • 25/P/1625/RM Awaiting decision

    Lydcott Lodge Lane Wraxall BS48 1BH

    Reserved matters application for appearance, layout, landscaping and scale for the erection of 6no. dwellings pursuant to outline planning permission 23/P/1387/OUT

    8 Aug 2025 Reserved matters