Planning application
Land east of Pencoed Rhondda Cynon Taf
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Request for comments: Construction of a sustainable transport corridor (STC) comprising an eastern and western sections (RCT application ref: 26/0305/GREG)
As published by the council, reference P/26/221/OBS
Application record
- Reference
- P/26/221/OBS
- Type
- Consultation from adjoining authorities
- Status
- Under consideration
- Received
- 24 Apr 2026
- Validated
- 24 Apr 2026
- Parish
- Pencoed Town Council
Timeline
Dates from the published record
-
24 Apr 2026
Received by Bridgend
-
28 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 19 June 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Bridgend took a median of 82 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
4 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Bridgend for determination, against a statutory target of eight weeks. Over the last year Bridgend's median decision took 82 days. More in our guide to how long planning decisions take.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Land East of Pencoed adjacent to A473 Bridgend
87% historically approved · decision due ~9 Jul
Proposed realigned section of the A473 with an active travel route to the South and attenuation pond (part of the Llanharan Sustainable Transport Corridor) ~affecting Footpath 19 Pencoed
Awaiting decision Full applications 130 docs -
Glenwood New Road Llanharan Bridgend CF35 5LD
2 pitched dormers to front elevation, open oak frame porch to front main entrance
Granted Full applications Extension Loft or dormer 11 docsSmall domestic -
Cartref 10 Brynna Road Brynna Rhondda Cynon Taf CF35 6PD
92% historically approved · decision due ~10 Nov
Proposed Increase in roof ridge height to provide loft accommodation and erection of a single-storey rear extension
Awaiting decision Full applications Extension Roofing 3 docsSmall domestic -
7 Belmont Brynna Rhondda Cynon Taf CF35 6PF
Application to widen vehicular access of existing driveway
Granted Full applications 2 docs -
Land To The North Of Brynna Road Brynna
92% historically approved · decision due ~22 Jan
Development of 25 affordable dwellings and associated works (Planning Policy Tech Note; Transport Assessment Addendum; Site Investigation; Ecological Management Plan; Revised Boundary Detail; and other revised plans to reflect changes to traffic calming/site entrance; received 30th January 2020)
Awaiting decision Full applications 60 docs -
Other outline applications
In Bridgend
-
P/26/454/SOR Awaiting decision
Marlas wastewater rising main
Request for screening opinion for construction of a 5.75km linear section of replacement pipeline
-
P/26/452/OUT Awaiting decision
Carline Transport Site / Compact Cars Ewenny Industrial Estate Bridgend CF31 3YY
Two Class A1 retail units, drive thru coffee shop and EV charging station, with car parking, landscaping and associated works.
-
P/26/281/SOR Decided
Land west of Dol Felin (Mill Meadow) Pyle
Request for screening opinion in respect of construction of a circa 1km section of replacement pipeline (Marlas wastewater rising main)
-
P/26/156/OUT Awaiting decision
Land to rear of 30-32 High Street Ogmore Vale CF32 7AD
Erection of a detached 2-bedroom dwelling
-
P/25/648/SOR Decided
Land south east of Pont Rhyd-y-Cyff, Llangynwyd
Request for an Environmental Impact Assessment (EIA) Screening Opinion in respect of residential development of up to 140 dwellings (including 15% affordable homes), landscaping, access, public open space and associated infrastructure