Skip to content
PlanIndex Get alerts
Menu

Planning application

P/25/648/SOR

Land south east of Pont Rhyd-y-Cyff, Llangynwyd

Decided Bridgend Screening opinion request

Proposal

Request for an Environmental Impact Assessment (EIA) Screening Opinion in respect of residential development of up to 140 dwellings (including 15% affordable homes), landscaping, access, public open space and associated infrastructure

As published by the council, reference P/25/648/SOR

Timeline

Dates from the published record

  1. 6 Nov 2025

    Received by Bridgend

  2. 18 Dec 2025

    Decision issued: EIA not required

  3. 28 Jul 2026

    Added to PlanIndex

After the decision

The process from here

The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.

If permission was granted, work must normally begin within five years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.

About outline applications

How this application type works

An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.

More on outline applications in our guide

Nearby applications

Within 500 metres

  • T/25/32/TPO Granted

    Land adjacent to 95 Parc Tyn-y-Waun Llangynwyd Maesteg CF34 9RH

    1 No Oak Tree - Crown lift southern side of tree; remove 2-5 overhanging branches; crown thinning to southern side of tree (less than 25%)

    19 Aug 2025 179m away Trees
  • P/26/111/LAP Awaiting decision

    20 Heol Cynwyd, Llangynwyd, Maesteg, CF34 9TB

    Certificate of Lawfulness for a proposed detached garage

    2 Mar 2026 389m away Lawful development
  • P/25/494/FUL Refused

    King Fisher House, Maesteg Road, Llangynwyd, Maesteg, CF34 9SN

    Remove existing lawned area to replace with two parking spaces

    8 Aug 2025 430m away Full applications
  • P/26/284/FUL Awaiting decision

    2 Coronation Road, Llangynwyd, Maesteg, CF34 9TA

    Demolition of substandard single garage and replace with double garage

    21 May 2026 484m away Full applications

In Bridgend

  • P/26/281/SOR Decided

    Land west of Dol Felin (Mill Meadow) Pyle

    Request for screening opinion in respect of construction of a circa 1km section of replacement pipeline (Marlas wastewater rising main)

    20 May 2026 Outline
  • P/26/221/OBS Awaiting decision

    Land east of Pencoed Rhondda Cynon Taf

    Request for comments: Construction of a sustainable transport corridor (STC) comprising an eastern and western sections (RCT application ref: 26/0305/GREG)

    24 Apr 2026 Outline
  • P/26/156/OUT Awaiting decision

    Land to rear of 30-32 High Street Ogmore Vale CF32 7AD

    Erection of a detached 2-bedroom dwelling

    20 Mar 2026 Outline
  • P/25/618/OBS Granted

    Land at Crugwyllt Fawr, Crugwyllt Fawr Access Road, Margam, Neath Port Talbot, SA13 2TB

    Request comment: Scoping Opinion in accordance with Regulation 14(1) of the Environmental Impact Assessment (Wales) Regulations 2017 for the construction of a 40 MW solar farm, associated ancillary infrastructure and landscape and environmental mitigation and enhancements on land (81 Ha) at Crugwyll...

    20 Oct 2025 Outline
  • P/25/543/SOR Decided

    Craig Y Parcau, Merthyr Mawr, Bridgend, CF32 0NT

    Request for screening opinion in respect of demolition of existing structures and construction of residential development