Skip to content
PlanIndex Get alerts
Menu

Ward · Brent

Planning applications in Barnhill

Page 12 of 12, newest first. Back to the Barnhill overview.

Applications in Barnhill

Newest first ยท page 12 of 12

  • 15/5663 Granted

    17C Chalkhill Road, Wembley, HA9 9DS

    Proposed erection of a rear dormer window to second floor flat

    Submitted 25 Feb 2016 Full applications
  • 16/0089 Granted

    340 Preston Road, Harrow, HA3 0QH

    Retrospective application for change of use from residential care home (Use class C2) to a day centre providing respite care and occassional overnight stay (Use Class Sui Generis, comprising a mix of Use Class D1 and Use Class C2) and proposed widening of existing vehicular crossover

    Submitted 1 Feb 2016 Full applications
  • 16/0124 Refused

    121 & 121A Chalkhill Road, Wembley, HA9 9AL

    Demolition of garage and rear conservatory and erection of a single storey side and rear extension, side dormer window, alterations to windows and insertion of new door to ground floor side elevation and change of use of the existing 2 flats into a residential family assessment centre (Use class C2) with associated car and cycle parking and landscaping

    Submitted 12 Jan 2016 Full applications
  • 15/5543 Refused

    45 Corringham Road, Wembley, HA9 9PX

    Insertion of door to enclose recessed porch of dwellinghouse (article 4)

    Submitted 21 Dec 2015 Householder
  • 15/5490 Granted

    44 West Hill, Wembley, HA9 9RS

    Retrospective planning permission for demolition of attached garage and erection of two storey side and part single and part two storey rear extension to dwellinghouse (revised desc)

    Submitted 17 Dec 2015 Householder
  • 15/4192 Granted

    28 Barn Way, Wembley, HA9 9NW

    Certificate of lawfulness for proposed use of office in dwellinghouse to operate as a telephone based booking office for a chauffeur service.

    Submitted 29 Sep 2015 Lawful development
  • 12/1140 Granted

    Ark Academy, Forty Avenue, Wembley, HA9 9JR

    Non-material amendment comprising: relocation of glazing and doors to line of main rear elevation of school of full planning permission 08/2842 dated 04/06/2009 for New school academy (6 forms of entry secondary school, 2 forms of entry primary school & nursery) comprising 2-, 3- and 4-storey main school building, 2-storey sports/drama hall with changing facilities, 3 hard play areas, all-weather, floodlit sports pitch, smaller floodlit sports pitch, outdoor play areas, soft play/natural habitat landscaped area, 45 staff-parking spaces, 3 disabled-parking spaces, 102 cycle-parking spaces and associated landscaping with access from Forty Avenue and Bridge Road, HA9 (as accompanied by: Revised Design and Access Statement dated February 2009; Untitled 3D visualisation drawings received 28 January 2009; Revised Transport Assessment by TPC dated March 2009; Statement of Community involvement in the process of establishing Ark Academy; Flood Risk Assessment Revision A by Dewhurst Macfarlane and Partners; Calculations confirming the proposed academy will discharge less than half the foul plus surface water drainage into the existing sewer system, by Dewhurst Macfarlane and Partners; Additional calculations, by Dewhurst Macfarlane and Partners; Flood Risk Assessment calculation sent by Smith Construction dated 24 March 2009; Energy Statement by Faber Maunsell dated 15 October 2008; Faber Maunsell letter dated 6 February 2009; Faber Maunsell Technical Note dated February 2009; Faber Maunsell document - Issue 2 - October 2008; Faber Maunsell Heat Loss and Overheating Analysis - January 2009; Desk Study and Preliminary Ground Investigation by Soil Consultants dated 14 January 2008; Draft Landscape Management Plan for Wembley Academy Natural Habitat Area along Forty Avenue Site Boundary, by Form Associates dated October 2008; Phase 1 Habitat Survey and Protected Species Assessment, by ecology consultancy dated January 2008; Tree Survey and Arboricultural Report by Challice Consulting Ltd dated 21 July 2008; Willmott Dixon Sport England Response issued 5 February 2009; 'Paper 1' - Educational need for a new secondary school with 2 form entry feeder primary; 'Paper 2' - Site selection for a new school; 'Paper 3' - Open Space Assessment; Ark Academy Access Statement by Jane Simpson Access; Ark Academy Design Challenger/ Advisor Comments dated 23.02.09; Wilmott Dixon response to GLA Stage 1 comments dated 28 January 2009; Wilmott Dixon response to Sport England comments dated 5 February 2009; Council's Screening Opinion and checklist dated 5 June 2008; Report to Executive 'School Places - follow up review of sites and pupil number forecasts - 15 January 2007'; Report to Scrutiny Committee 'Primary and Secondary Places Update' - 26 November 2008; Report to Executive 'A Strategy for the Development of Primary and Secondary Schools - Options for Delivering Additional School Places' - 13 November 2006; Approved Admissions Arrangements for Ark Academy (Primary - 2009/10 school year))

    Submitted 2 May 2012 Amendments
  • 10/1655 Granted

    Ark Academy, Forty Avenue, Wembley, HA9 9JR

    Details pursuant to condition No 13 (Site Investigation), and 21 (verification report confirming remediation works) of Deemed (Reg4 Councils Other Development) reference 08/2842 dated 4 June, 2009, for New school academy (6 forms of entry secondary school, 2 forms of entry primary school & nursery) comprising 2-, 3- and 4-storey main school building, 2-storey sports/drama hall with changing facilities, 3 hard play areas, all-weather, floodlit sports pitch, smaller floodlit sports pitch, outdoor play areas, soft play/natural habitat landscaped area, 45 staff-parking spaces, 3 disabled-parking spaces, 102 cycle-parking spaces and associated landscaping with access from Forty Avenue and Bridge Road, HA9 (as accompanied by: Revised Design and Access Statement dated February 2009; Untitled 3D visualisation drawings received 28 January 2009; Revised Transport Assessment by TPC dated March 2009; Statement of Community involvement in the process of establishing Ark Academy; Flood Risk Assessment Revision A by Dewhurst Macfarlane and Partners; Calculations confirming the proposed academy will discharge less than half the foul plus surface water drainage into the existing sewer system, by Dewhurst Macfarlane and Partners; Additional calculations, by Dewhurst Macfarlane and Partners; Flood Risk Assessment calculation sent by Smith Construction dated 24 March 2009; Energy Statement by Faber Maunsell dated 15 October 2008; Faber Maunsell letter dated 6 February 2009; Faber Maunsell Technical Note dated February 2009; Faber Maunsell document - Issue 2 - October 2008; Faber Maunsell Heat Loss and Overheating Analysis - January 2009; Desk Study and Preliminary Ground Investigation by Soil Consultants dated 14 January 2008; Draft Landscape Management Plan for Wembley Academy Natural Habitat Area along Forty Avenue Site Boundary, by Form Associates dated October 2008; Phase 1 Habitat Survey and Protected Species Assessment, by ecology consultancy dated January 2008; Tree Survey and Arboricultural Report by Challice Consulting Ltd dated 21 July 2008; Willmott Dixon Sport England Response issued 5 February 2009; 'Paper 1' - Educational need for a new secondary school with 2 form entry feeder primary; 'Paper 2' - Site selection for a new school; 'Paper 3' - Open Space Assessment; Ark Academy Access Statement by Jane Simpson Access; Ark Academy Design Challenger/ Advisor Comments dated 23.02.09; Wilmott Dixon response to GLA Stage 1 comments dated 28 January 2009; Wilmott Dixon response to Sport England comments dated 5 February 2009; Council's Screening Opinion and checklist dated 5 June 2008; Report to Executive 'School Places - follow up review of sites and pupil number forecasts - 15 January 2007'; Report to Scrutiny Committee 'Primary and Secondary Places Update' - 26 November 2008; Report to Executive 'A Strategy for the Development of Primary and Secondary Schools - Options for Delivering Additional School Places' - 13 November 2006; Approved Admissions Arrangements for Ark Academy (Primary - 2009/10 school year))

    Submitted 28 Jun 2010 Conditions
  • 09/1360 Granted

    Ark Academy, Forty Avenue, Wembley, HA9 9JR

    Details pursuant to Condition 5 (Tree Protection), Condition 7 (Breeding Bird Survey), Condition 9 (Tree Survey Details), and Condition 10 (Wheel Wash Facilities) of Deemed (Reg4 Council's Other Development) Reference No. 08/2842 dated 04/06/2009, for New school academy (6 forms of entry secondary school, 2 forms of entry primary school & nursery) comprising 2-, 3- and 4-storey main school building, 2-storey sports/drama hall with changing facilities, 3 hard play areas, all-weather, floodlit sports pitch, smaller floodlit sports pitch, outdoor play areas, soft play/natural habitat landscaped area, 45 staff-parking spaces, 3 disabled-parking spaces, 102 cycle-parking spaces and associated landscaping with access from Forty Avenue and Bridge Road, HA9 (as accompanied by: Revised Design and Access Statement dated February 2009; Untitled 3D visualisation drawings received 28 January 2009; Revised Transport Assessment by TPC dated March 2009; Statement of Community involvement in the process of establishing Ark Academy; Flood Risk Assessment Revision A by Dewhurst Macfarlane and Partners; Calculations confirming the proposed academy will discharge less than half the foul plus surface water drainage into the existing sewer system, by Dewhurst Macfarlane and Partners; Additional calculations, by Dewhurst Macfarlane and Partners; Flood Risk Assessment calculation sent by Smith Construction dated 24 March 2009; Energy Statement by Faber Maunsell dated 15 October 2008; Faber Maunsell letter dated 6 February 2009; Faber Maunsell Technical Note dated February 2009; Faber Maunsell document - Issue 2 - October 2008; Faber Maunsell Heat Loss and Overheating Analysis - January 2009; Desk Study and Preliminary Ground Investigation by Soil Consultants dated 14 January 2008; Draft Landscape Management Plan for Wembley Academy Natural Habitat Area along Forty Avenue Site Boundary, by Form Associates dated October 2008; Phase 1 Habitat Survey and Protected Species Assessment, by ecology consultancy dated January 2008; Tree Survey and Arboricultural Report by Challice Consulting Ltd dated 21 July 2008; Willmott Dixon Sport England Response issued 5 February 2009; 'Paper 1' - Educational need for a new secondary school with 2 form entry feeder primary; 'Paper 2' - Site selection for a new school; 'Paper 3' - Open Space Assessment; Ark Academy Access Statement by Jane Simpson Access; Ark Academy Design Challenger/ Advisor Comments dated 23.02.09; Wilmott Dixon response to GLA Stage 1 comments dated 28 January 2009; Wilmott Dixon response to Sport England comments dated 5 February 2009; Council's Screening Opinion and checklist dated 5 June 2008; Report to Executive 'School Places - follow up review of sites and pupil number forecasts - 15 January 2007'; Report to Scrutiny Committee 'Primary and Secondary Places Update' - 26 November 2008; Report to Executive 'A Strategy for the Development of Primary and Secondary Schools - Options for Delivering Additional School Places' - 13 November 2006; Approved Admissions Arrangements for Ark Academy (Primary - 2009/10 school year))

    Submitted 4 Jun 2009 Conditions
  • 08/2842 Granted

    Ark Academy, Forty Avenue, Wembley, HA9 9JR

    New school academy (6 forms of entry secondary school, 2 forms of entry primary school & nursery) comprising 2-, 3- and 4-storey main school building, 2-storey sports/drama hall with changing facilities, 3 hard play areas, all-weather, floodlit sports pitch, smaller floodlit sports pitch, outdoor play areas, soft play/natural habitat landscaped area, 45 staff-parking spaces, 3 disabled-parking spaces, 102 cycle-parking spaces and associated landscaping with access from Forty Avenue and Bridge Road, HA9 (as accompanied by: Revised Design and Access Statement dated February 2009; Untitled 3D visualisation drawings received 28 January 2009; Revised Transport Assessment by TPC dated March 2009; Statement of Community involvement in the process of establishing Ark Academy; Flood Risk Assessment Revision A by Dewhurst Macfarlane and Partners; Calculations confirming the proposed academy will discharge less than half the foul plus surface water drainage into the existing sewer system, by Dewhurst Macfarlane and Partners; Additional calculations, by Dewhurst Macfarlane and Partners; Flood Risk Assessment calculation sent by Smith Construction dated 24 March 2009; Energy Statement by Faber Maunsell dated 15 October 2008; Faber Maunsell letter dated 6 February 2009; Faber Maunsell Technical Note dated February 2009; Faber Maunsell document - Issue 2 - October 2008; Faber Maunsell Heat Loss and Overheating Analysis - January 2009; Desk Study and Preliminary Ground Investigation by Soil Consultants dated 14 January 2008; Draft Landscape Management Plan for Wembley Academy Natural Habitat Area along Forty Avenue Site Boundary, by Form Associates dated October 2008; Phase 1 Habitat Survey and Protected Species Assessment, by ecology consultancy dated January 2008; Tree Survey and Arboricultural Report by Challice Consulting Ltd dated 21 July 2008; Willmott Dixon Sport England Response issued 5 February 2009; 'Paper 1' - Educational need for a new secondary school with 2 form entry feeder primary; 'Paper 2' - Site selection for a new school; 'Paper 3' - Open Space Assessment; Ark Academy Access Statement by Jane Simpson Access; Ark Academy Design Challenger/ Advisor Comments dated 23.02.09; Wilmott Dixon response to GLA Stage 1 comments dated 28 January 2009; Wilmott Dixon response to Sport England comments dated 5 February 2009; Council's Screening Opinion and checklist dated 5 June 2008; Report to Executive 'School Places - follow up review of sites and pupil number forecasts - 15 January 2007'; Report to Scrutiny Committee 'Primary and Secondary Places Update' - 26 November 2008; Report to Executive 'A Strategy for the Development of Primary and Secondary Schools - Options for Delivering Additional School Places' - 13 November 2006; Approved Admissions Arrangements for Ark Academy (Primary - 2009/10 school year))

    Submitted 17 Oct 2008 Other