Skip to content
PlanIndex Get alerts
Menu

Planning application

Ark Academy, Forty Avenue, Wembley, HA9 9JR

Granted Brent 08/2842 Deemed (Reg4 Councils Other Development)

Works: Trees

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

New school academy (6 forms of entry secondary school, 2 forms of entry primary school & nursery) comprising 2-, 3- and 4-storey main school building, 2-storey sports/drama hall with changing facilities, 3 hard play areas, all-weather, floodlit sports pitch, smaller floodlit sports pitch, outdoor play areas, soft play/natural habitat landscaped area, 45 staff-parking spaces, 3 disabled-parking spaces, 102 cycle-parking spaces and associated landscaping with access from Forty Avenue and Bridge Road, HA9 (as accompanied by: Revised Design and Access Statement dated February 2009; Untitled 3D visualisation drawings received 28 January 2009; Revised Transport Assessment by TPC dated March 2009; Statement of Community involvement in the process of establishing Ark Academy; Flood Risk Assessment Revision A by Dewhurst Macfarlane and Partners; Calculations confirming the proposed academy will discharge less than half the foul plus surface water drainage into the existing sewer system, by Dewhurst Macfarlane and Partners; Additional calculations, by Dewhurst Macfarlane and Partners; Flood Risk Assessment calculation sent by Smith Construction dated 24 March 2009; Energy Statement by Faber Maunsell dated 15 October 2008; Faber Maunsell letter dated 6 February 2009; Faber Maunsell Technical Note dated February 2009; Faber Maunsell document - Issue 2 - October 2008; Faber Maunsell Heat Loss and Overheating Analysis - January 2009; Desk Study and Preliminary Ground Investigation by Soil Consultants dated 14 January 2008; Draft Landscape Management Plan for Wembley Academy Natural Habitat Area along Forty Avenue Site Boundary, by Form Associates dated October 2008; Phase 1 Habitat Survey and Protected Species Assessment, by ecology consultancy dated January 2008; Tree Survey and Arboricultural Report by Challice Consulting Ltd dated 21 July 2008; Willmott Dixon Sport England Response issued 5 February 2009; 'Paper 1' - Educational need for a new secondary school with 2 form entry feeder primary; 'Paper 2' - Site selection for a new school; 'Paper 3' - Open Space Assessment; Ark Academy Access Statement by Jane Simpson Access; Ark Academy Design Challenger/ Advisor Comments dated 23.02.09; Wilmott Dixon response to GLA Stage 1 comments dated 28 January 2009; Wilmott Dixon response to Sport England comments dated 5 February 2009; Council's Screening Opinion and checklist dated 5 June 2008; Report to Executive 'School Places - follow up review of sites and pupil number forecasts - 15 January 2007'; Report to Scrutiny Committee 'Primary and Secondary Places Update' - 26 November 2008; Report to Executive 'A Strategy for the Development of Primary and Secondary Schools - Options for Delivering Additional School Places' - 13 November 2006; Approved Admissions Arrangements for Ark Academy (Primary - 2009/10 school year))

As published by the council, reference 08/2842

Application record

Reference
08/2842
Type
Deemed (Reg4 Councils Other Development)
Status
Decided
Decision
Granted As published: Grant Permission
Received
17 Oct 2008
Validated
17 Oct 2008
Decided
4 Jun 2009
Ward
Barnhill
Decision by
Delegated following committee
Postcode
HA9 9JR

Site history

Applications at this address on the Brent register

This site has had 4 applications since 2008: 4 approved, 0 refused.

  • 12/1140 Granted

    Ark Academy, Forty Avenue, Wembley, HA9 9JR

    Non-material amendment comprising: relocation of glazing and doors to line of main rear elevation of school of full planning permission 08/2842 dated 04/06/2009 for New school academy (6 forms of entry secondary school, 2 forms of entry primary school & nursery) comprising 2-, 3- and 4-storey main school building, 2-storey sports/drama hall with changing facilities, 3 hard play areas, all-weather, floodlit sports pitch, smaller floodlit sports pitch, outdoor play areas, soft play/natural habitat landscaped area, 45 staff-parking spaces, 3 disabled-parking spaces, 102 cycle-parking spaces and associated landscaping with access from Forty Avenue and Bridge Road, HA9 (as accompanied by: Revised Design and Access Statement dated February 2009; Untitled 3D visualisation drawings received 28 January 2009; Revised Transport Assessment by TPC dated March 2009; Statement of Community involvement in the process of establishing Ark Academy; Flood Risk Assessment Revision A by Dewhurst Macfarlane and Partners; Calculations confirming the proposed academy will discharge less than half the foul plus surface water drainage into the existing sewer system, by Dewhurst Macfarlane and Partners; Additional calculations, by Dewhurst Macfarlane and Partners; Flood Risk Assessment calculation sent by Smith Construction dated 24 March 2009; Energy Statement by Faber Maunsell dated 15 October 2008; Faber Maunsell letter dated 6 February 2009; Faber Maunsell Technical Note dated February 2009; Faber Maunsell document - Issue 2 - October 2008; Faber Maunsell Heat Loss and Overheating Analysis - January 2009; Desk Study and Preliminary Ground Investigation by Soil Consultants dated 14 January 2008; Draft Landscape Management Plan for Wembley Academy Natural Habitat Area along Forty Avenue Site Boundary, by Form Associates dated October 2008; Phase 1 Habitat Survey and Protected Species Assessment, by ecology consultancy dated January 2008; Tree Survey and Arboricultural Report by Challice Consulting Ltd dated 21 July 2008; Willmott Dixon Sport England Response issued 5 February 2009; 'Paper 1' - Educational need for a new secondary school with 2 form entry feeder primary; 'Paper 2' - Site selection for a new school; 'Paper 3' - Open Space Assessment; Ark Academy Access Statement by Jane Simpson Access; Ark Academy Design Challenger/ Advisor Comments dated 23.02.09; Wilmott Dixon response to GLA Stage 1 comments dated 28 January 2009; Wilmott Dixon response to Sport England comments dated 5 February 2009; Council's Screening Opinion and checklist dated 5 June 2008; Report to Executive 'School Places - follow up review of sites and pupil number forecasts - 15 January 2007'; Report to Scrutiny Committee 'Primary and Secondary Places Update' - 26 November 2008; Report to Executive 'A Strategy for the Development of Primary and Secondary Schools - Options for Delivering Additional School Places' - 13 November 2006; Approved Admissions Arrangements for Ark Academy (Primary - 2009/10 school year))

    Decided 30 May 2012 Amendments
  • 10/1655 Granted

    Ark Academy, Forty Avenue, Wembley, HA9 9JR

    Details pursuant to condition No 13 (Site Investigation), and 21 (verification report confirming remediation works) of Deemed (Reg4 Councils Other Development) reference 08/2842 dated 4 June, 2009, for New school academy (6 forms of entry secondary school, 2 forms of entry primary school & nursery) comprising 2-, 3- and 4-storey main school building, 2-storey sports/drama hall with changing facilities, 3 hard play areas, all-weather, floodlit sports pitch, smaller floodlit sports pitch, outdoor play areas, soft play/natural habitat landscaped area, 45 staff-parking spaces, 3 disabled-parking spaces, 102 cycle-parking spaces and associated landscaping with access from Forty Avenue and Bridge Road, HA9 (as accompanied by: Revised Design and Access Statement dated February 2009; Untitled 3D visualisation drawings received 28 January 2009; Revised Transport Assessment by TPC dated March 2009; Statement of Community involvement in the process of establishing Ark Academy; Flood Risk Assessment Revision A by Dewhurst Macfarlane and Partners; Calculations confirming the proposed academy will discharge less than half the foul plus surface water drainage into the existing sewer system, by Dewhurst Macfarlane and Partners; Additional calculations, by Dewhurst Macfarlane and Partners; Flood Risk Assessment calculation sent by Smith Construction dated 24 March 2009; Energy Statement by Faber Maunsell dated 15 October 2008; Faber Maunsell letter dated 6 February 2009; Faber Maunsell Technical Note dated February 2009; Faber Maunsell document - Issue 2 - October 2008; Faber Maunsell Heat Loss and Overheating Analysis - January 2009; Desk Study and Preliminary Ground Investigation by Soil Consultants dated 14 January 2008; Draft Landscape Management Plan for Wembley Academy Natural Habitat Area along Forty Avenue Site Boundary, by Form Associates dated October 2008; Phase 1 Habitat Survey and Protected Species Assessment, by ecology consultancy dated January 2008; Tree Survey and Arboricultural Report by Challice Consulting Ltd dated 21 July 2008; Willmott Dixon Sport England Response issued 5 February 2009; 'Paper 1' - Educational need for a new secondary school with 2 form entry feeder primary; 'Paper 2' - Site selection for a new school; 'Paper 3' - Open Space Assessment; Ark Academy Access Statement by Jane Simpson Access; Ark Academy Design Challenger/ Advisor Comments dated 23.02.09; Wilmott Dixon response to GLA Stage 1 comments dated 28 January 2009; Wilmott Dixon response to Sport England comments dated 5 February 2009; Council's Screening Opinion and checklist dated 5 June 2008; Report to Executive 'School Places - follow up review of sites and pupil number forecasts - 15 January 2007'; Report to Scrutiny Committee 'Primary and Secondary Places Update' - 26 November 2008; Report to Executive 'A Strategy for the Development of Primary and Secondary Schools - Options for Delivering Additional School Places' - 13 November 2006; Approved Admissions Arrangements for Ark Academy (Primary - 2009/10 school year))

    Decided 17 Aug 2010 Conditions
  • 09/1360 Granted

    Ark Academy, Forty Avenue, Wembley, HA9 9JR

    Details pursuant to Condition 5 (Tree Protection), Condition 7 (Breeding Bird Survey), Condition 9 (Tree Survey Details), and Condition 10 (Wheel Wash Facilities) of Deemed (Reg4 Council's Other Development) Reference No. 08/2842 dated 04/06/2009, for New school academy (6 forms of entry secondary school, 2 forms of entry primary school & nursery) comprising 2-, 3- and 4-storey main school building, 2-storey sports/drama hall with changing facilities, 3 hard play areas, all-weather, floodlit sports pitch, smaller floodlit sports pitch, outdoor play areas, soft play/natural habitat landscaped area, 45 staff-parking spaces, 3 disabled-parking spaces, 102 cycle-parking spaces and associated landscaping with access from Forty Avenue and Bridge Road, HA9 (as accompanied by: Revised Design and Access Statement dated February 2009; Untitled 3D visualisation drawings received 28 January 2009; Revised Transport Assessment by TPC dated March 2009; Statement of Community involvement in the process of establishing Ark Academy; Flood Risk Assessment Revision A by Dewhurst Macfarlane and Partners; Calculations confirming the proposed academy will discharge less than half the foul plus surface water drainage into the existing sewer system, by Dewhurst Macfarlane and Partners; Additional calculations, by Dewhurst Macfarlane and Partners; Flood Risk Assessment calculation sent by Smith Construction dated 24 March 2009; Energy Statement by Faber Maunsell dated 15 October 2008; Faber Maunsell letter dated 6 February 2009; Faber Maunsell Technical Note dated February 2009; Faber Maunsell document - Issue 2 - October 2008; Faber Maunsell Heat Loss and Overheating Analysis - January 2009; Desk Study and Preliminary Ground Investigation by Soil Consultants dated 14 January 2008; Draft Landscape Management Plan for Wembley Academy Natural Habitat Area along Forty Avenue Site Boundary, by Form Associates dated October 2008; Phase 1 Habitat Survey and Protected Species Assessment, by ecology consultancy dated January 2008; Tree Survey and Arboricultural Report by Challice Consulting Ltd dated 21 July 2008; Willmott Dixon Sport England Response issued 5 February 2009; 'Paper 1' - Educational need for a new secondary school with 2 form entry feeder primary; 'Paper 2' - Site selection for a new school; 'Paper 3' - Open Space Assessment; Ark Academy Access Statement by Jane Simpson Access; Ark Academy Design Challenger/ Advisor Comments dated 23.02.09; Wilmott Dixon response to GLA Stage 1 comments dated 28 January 2009; Wilmott Dixon response to Sport England comments dated 5 February 2009; Council's Screening Opinion and checklist dated 5 June 2008; Report to Executive 'School Places - follow up review of sites and pupil number forecasts - 15 January 2007'; Report to Scrutiny Committee 'Primary and Secondary Places Update' - 26 November 2008; Report to Executive 'A Strategy for the Development of Primary and Secondary Schools - Options for Delivering Additional School Places' - 13 November 2006; Approved Admissions Arrangements for Ark Academy (Primary - 2009/10 school year))

    Decided 10 Jun 2009 Conditions

Timeline

Dates from the published record

  1. 17 Oct 2008

    Received by Brent

  2. 4 Jun 2009

    Decision issued: Grant Permission

  3. 21 Sep 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Willmott Dixon Construction Ltd Agent, a construction firm registered in Letchworth Garden City

Active · incorporated 1963 · Letchworth Garden City

16 applications on PlanIndex · across 10 councils · 100% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

59 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Brent granted permission on 4 June 2009, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About less common application types

This application sits outside the common categories, and the council record linked on this page sets out the specific procedure that applies. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Ark Academy, Forty Avenue, Wembley, HA9 9JR

    12/1140 Submitted 2 May 2012 50 yards away

    Non-material amendment comprising: relocation of glazing and doors to line of main rear elevation of school of full planning permission 08/2842 dated 04/06/2009 for New school academy (6 forms of entry secondary school, 2 forms of entry primary school & nursery) comprising 2-, 3- and 4-storey main school building, 2-storey sports/drama hall with changing facilities, 3 hard play areas, all-weather, floodlit sports pitch, smaller floodlit sports pitch, outdoor play areas, soft play/natural habitat landscaped area, 45 staff-parking spaces, 3 disabled-parking spaces, 102 cycle-parking spaces and associated landscaping with access from Forty Avenue and Bridge Road, HA9 (as accompanied by: Revised Design and Access Statement dated February 2009; Untitled 3D visualisation drawings received 28 January 2009; Revised Transport Assessment by TPC dated March 2009; Statement of Community involvement in the process of establishing Ark Academy; Flood Risk Assessment Revision A by Dewhurst Macfarlane and Partners; Calculations confirming the proposed academy will discharge less than half the foul plus surface water drainage into the existing sewer system, by Dewhurst Macfarlane and Partners; Additional calculations, by Dewhurst Macfarlane and Partners; Flood Risk Assessment calculation sent by Smith Construction dated 24 March 2009; Energy Statement by Faber Maunsell dated 15 October 2008; Faber Maunsell letter dated 6 February 2009; Faber Maunsell Technical Note dated February 2009; Faber Maunsell document - Issue 2 - October 2008; Faber Maunsell Heat Loss and Overheating Analysis - January 2009; Desk Study and Preliminary Ground Investigation by Soil Consultants dated 14 January 2008; Draft Landscape Management Plan for Wembley Academy Natural Habitat Area along Forty Avenue Site Boundary, by Form Associates dated October 2008; Phase 1 Habitat Survey and Protected Species Assessment, by ecology consultancy dated January 2008; Tree Survey and Arboricultural Report by Challice Consulting Ltd dated 21 July 2008; Willmott Dixon Sport England Response issued 5 February 2009; 'Paper 1' - Educational need for a new secondary school with 2 form entry feeder primary; 'Paper 2' - Site selection for a new school; 'Paper 3' - Open Space Assessment; Ark Academy Access Statement by Jane Simpson Access; Ark Academy Design Challenger/ Advisor Comments dated 23.02.09; Wilmott Dixon response to GLA Stage 1 comments dated 28 January 2009; Wilmott Dixon response to Sport England comments dated 5 February 2009; Council's Screening Opinion and checklist dated 5 June 2008; Report to Executive 'School Places - follow up review of sites and pupil number forecasts - 15 January 2007'; Report to Scrutiny Committee 'Primary and Secondary Places Update' - 26 November 2008; Report to Executive 'A Strategy for the Development of Primary and Secondary Schools - Options for Delivering Additional School Places' - 13 November 2006; Approved Admissions Arrangements for Ark Academy (Primary - 2009/10 school year))

    Granted Amendments Windows or glazing Trees 11 docs
  • Ark Academy, Forty Avenue, Wembley, HA9 9JR

    10/1655 Submitted 28 Jun 2010 50 yards away

    Details pursuant to condition No 13 (Site Investigation), and 21 (verification report confirming remediation works) of Deemed (Reg4 Councils Other Development) reference 08/2842 dated 4 June, 2009, for New school academy (6 forms of entry secondary school, 2 forms of entry primary school & nursery) comprising 2-, 3- and 4-storey main school building, 2-storey sports/drama hall with changing facilities, 3 hard play areas, all-weather, floodlit sports pitch, smaller floodlit sports pitch, outdoor play areas, soft play/natural habitat landscaped area, 45 staff-parking spaces, 3 disabled-parking spaces, 102 cycle-parking spaces and associated landscaping with access from Forty Avenue and Bridge Road, HA9 (as accompanied by: Revised Design and Access Statement dated February 2009; Untitled 3D visualisation drawings received 28 January 2009; Revised Transport Assessment by TPC dated March 2009; Statement of Community involvement in the process of establishing Ark Academy; Flood Risk Assessment Revision A by Dewhurst Macfarlane and Partners; Calculations confirming the proposed academy will discharge less than half the foul plus surface water drainage into the existing sewer system, by Dewhurst Macfarlane and Partners; Additional calculations, by Dewhurst Macfarlane and Partners; Flood Risk Assessment calculation sent by Smith Construction dated 24 March 2009; Energy Statement by Faber Maunsell dated 15 October 2008; Faber Maunsell letter dated 6 February 2009; Faber Maunsell Technical Note dated February 2009; Faber Maunsell document - Issue 2 - October 2008; Faber Maunsell Heat Loss and Overheating Analysis - January 2009; Desk Study and Preliminary Ground Investigation by Soil Consultants dated 14 January 2008; Draft Landscape Management Plan for Wembley Academy Natural Habitat Area along Forty Avenue Site Boundary, by Form Associates dated October 2008; Phase 1 Habitat Survey and Protected Species Assessment, by ecology consultancy dated January 2008; Tree Survey and Arboricultural Report by Challice Consulting Ltd dated 21 July 2008; Willmott Dixon Sport England Response issued 5 February 2009; 'Paper 1' - Educational need for a new secondary school with 2 form entry feeder primary; 'Paper 2' - Site selection for a new school; 'Paper 3' - Open Space Assessment; Ark Academy Access Statement by Jane Simpson Access; Ark Academy Design Challenger/ Advisor Comments dated 23.02.09; Wilmott Dixon response to GLA Stage 1 comments dated 28 January 2009; Wilmott Dixon response to Sport England comments dated 5 February 2009; Council's Screening Opinion and checklist dated 5 June 2008; Report to Executive 'School Places - follow up review of sites and pupil number forecasts - 15 January 2007'; Report to Scrutiny Committee 'Primary and Secondary Places Update' - 26 November 2008; Report to Executive 'A Strategy for the Development of Primary and Secondary Schools - Options for Delivering Additional School Places' - 13 November 2006; Approved Admissions Arrangements for Ark Academy (Primary - 2009/10 school year))

    Granted Conditions Trees 8 docs
  • Ark Academy, Forty Avenue, Wembley, HA9 9JR

    09/1360 Submitted 4 Jun 2009 50 yards away

    Details pursuant to Condition 5 (Tree Protection), Condition 7 (Breeding Bird Survey), Condition 9 (Tree Survey Details), and Condition 10 (Wheel Wash Facilities) of Deemed (Reg4 Council's Other Development) Reference No. 08/2842 dated 04/06/2009, for New school academy (6 forms of entry secondary school, 2 forms of entry primary school & nursery) comprising 2-, 3- and 4-storey main school building, 2-storey sports/drama hall with changing facilities, 3 hard play areas, all-weather, floodlit sports pitch, smaller floodlit sports pitch, outdoor play areas, soft play/natural habitat landscaped area, 45 staff-parking spaces, 3 disabled-parking spaces, 102 cycle-parking spaces and associated landscaping with access from Forty Avenue and Bridge Road, HA9 (as accompanied by: Revised Design and Access Statement dated February 2009; Untitled 3D visualisation drawings received 28 January 2009; Revised Transport Assessment by TPC dated March 2009; Statement of Community involvement in the process of establishing Ark Academy; Flood Risk Assessment Revision A by Dewhurst Macfarlane and Partners; Calculations confirming the proposed academy will discharge less than half the foul plus surface water drainage into the existing sewer system, by Dewhurst Macfarlane and Partners; Additional calculations, by Dewhurst Macfarlane and Partners; Flood Risk Assessment calculation sent by Smith Construction dated 24 March 2009; Energy Statement by Faber Maunsell dated 15 October 2008; Faber Maunsell letter dated 6 February 2009; Faber Maunsell Technical Note dated February 2009; Faber Maunsell document - Issue 2 - October 2008; Faber Maunsell Heat Loss and Overheating Analysis - January 2009; Desk Study and Preliminary Ground Investigation by Soil Consultants dated 14 January 2008; Draft Landscape Management Plan for Wembley Academy Natural Habitat Area along Forty Avenue Site Boundary, by Form Associates dated October 2008; Phase 1 Habitat Survey and Protected Species Assessment, by ecology consultancy dated January 2008; Tree Survey and Arboricultural Report by Challice Consulting Ltd dated 21 July 2008; Willmott Dixon Sport England Response issued 5 February 2009; 'Paper 1' - Educational need for a new secondary school with 2 form entry feeder primary; 'Paper 2' - Site selection for a new school; 'Paper 3' - Open Space Assessment; Ark Academy Access Statement by Jane Simpson Access; Ark Academy Design Challenger/ Advisor Comments dated 23.02.09; Wilmott Dixon response to GLA Stage 1 comments dated 28 January 2009; Wilmott Dixon response to Sport England comments dated 5 February 2009; Council's Screening Opinion and checklist dated 5 June 2008; Report to Executive 'School Places - follow up review of sites and pupil number forecasts - 15 January 2007'; Report to Scrutiny Committee 'Primary and Secondary Places Update' - 26 November 2008; Report to Executive 'A Strategy for the Development of Primary and Secondary Schools - Options for Delivering Additional School Places' - 13 November 2006; Approved Admissions Arrangements for Ark Academy (Primary - 2009/10 school year))

    Granted Conditions Trees 9 docs
  • 2A Grand Parade, Forty Avenue, Wembley, HA9 9JS

    26/1827 Submitted 16 Jul 2026 100 yards away

    79% historically approved · decision due ~23 Sep

    Certificate of lawfulness for existing use of first floor flat as 10 bed 10 person house of multi...

    Awaiting decision
  • 7 and 7A, Bridge Road, Wembley, HA9 9AB

    21/3092 Submitted 10 Aug 2021 100 yards away

    Proposed erection of internally illuminated digital screen display to side elevation of 7 and 7A Bridge Road

    Refused Advertising 12 docs
  • 17 Bridge Road, Wembley, HA9 9AB

    21/2032 Submitted 1 Jun 2021 100 yards away

    Proposed single storey rear infill extension for ancillary use and provision of bin store at rear of restaurant.

    Granted Full applications Extension 8 docs
    Small domestic

In Brent

  • 26/0934 Granted

    Roe Green Junior School, Princes Avenue, London, NW9 9JL

    Replacement of existing 59 windows with new double-glazed aluminium units (Types A?F), to match existing size, proportions and configuration at Roe Green Junior School.

    Received 14 Apr, published by the council 25 Jul 2026 Other
  • 26/0557 Granted

    177B Walm Lane, London, NW2 3AY

    Installation of disability access ramp to front garden for first floor flat

    Received 4 Mar, published by the council 25 Jul 2026 Other
  • 25/3234 Granted

    Childrens Centre, Preston Park Primary School, College Road, Wembley, HA9 8RJ

    Installation of photovoltaic solar panels to roof of single storey building

    Received 19 Nov, published by the council 11 Aug 2026 Other
  • 25/3030 Granted

    131-139 East Lane, Wembley, HA9 7PE

    Prior approval application for demolition of existing sales building at 131-139 East Lane.

    Received 27 Oct, published by the council 11 Aug 2026 Other
  • 24/3046 Granted

    1108 Harrow Road, London, NW10 5NL

    Replacement of existing single-glazed timber windows with double-glazed uPVC windows to 1108 Harrow Road, NW10

    Received 29 Oct, published by the council 10 Sep 2026 Other