Planning application
Ark Academy, Forty Avenue, Wembley, HA9 9JR
Works: Trees
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Details pursuant to condition No 13 (Site Investigation), and 21 (verification report confirming remediation works) of Deemed (Reg4 Councils Other Development) reference 08/2842 dated 4 June, 2009, for New school academy (6 forms of entry secondary school, 2 forms of entry primary school & nursery) comprising 2-, 3- and 4-storey main school building, 2-storey sports/drama hall with changing facilities, 3 hard play areas, all-weather, floodlit sports pitch, smaller floodlit sports pitch, outdoor play areas, soft play/natural habitat landscaped area, 45 staff-parking spaces, 3 disabled-parking spaces, 102 cycle-parking spaces and associated landscaping with access from Forty Avenue and Bridge Road, HA9 (as accompanied by: Revised Design and Access Statement dated February 2009; Untitled 3D visualisation drawings received 28 January 2009; Revised Transport Assessment by TPC dated March 2009; Statement of Community involvement in the process of establishing Ark Academy; Flood Risk Assessment Revision A by Dewhurst Macfarlane and Partners; Calculations confirming the proposed academy will discharge less than half the foul plus surface water drainage into the existing sewer system, by Dewhurst Macfarlane and Partners; Additional calculations, by Dewhurst Macfarlane and Partners; Flood Risk Assessment calculation sent by Smith Construction dated 24 March 2009; Energy Statement by Faber Maunsell dated 15 October 2008; Faber Maunsell letter dated 6 February 2009; Faber Maunsell Technical Note dated February 2009; Faber Maunsell document - Issue 2 - October 2008; Faber Maunsell Heat Loss and Overheating Analysis - January 2009; Desk Study and Preliminary Ground Investigation by Soil Consultants dated 14 January 2008; Draft Landscape Management Plan for Wembley Academy Natural Habitat Area along Forty Avenue Site Boundary, by Form Associates dated October 2008; Phase 1 Habitat Survey and Protected Species Assessment, by ecology consultancy dated January 2008; Tree Survey and Arboricultural Report by Challice Consulting Ltd dated 21 July 2008; Willmott Dixon Sport England Response issued 5 February 2009; 'Paper 1' - Educational need for a new secondary school with 2 form entry feeder primary; 'Paper 2' - Site selection for a new school; 'Paper 3' - Open Space Assessment; Ark Academy Access Statement by Jane Simpson Access; Ark Academy Design Challenger/ Advisor Comments dated 23.02.09; Wilmott Dixon response to GLA Stage 1 comments dated 28 January 2009; Wilmott Dixon response to Sport England comments dated 5 February 2009; Council's Screening Opinion and checklist dated 5 June 2008; Report to Executive 'School Places - follow up review of sites and pupil number forecasts - 15 January 2007'; Report to Scrutiny Committee 'Primary and Secondary Places Update' - 26 November 2008; Report to Executive 'A Strategy for the Development of Primary and Secondary Schools - Options for Delivering Additional School Places' - 13 November 2006; Approved Admissions Arrangements for Ark Academy (Primary - 2009/10 school year))
As published by the council, reference 10/1655
Application record
- Reference
- 10/1655
- Type
- Conditions pursuant to a full permission
- Status
- Decided
- Decision
- Granted As published: Grant Permission
- Received
- 28 Jun 2010
- Validated
- 28 Jun 2010
- Decided
- 17 Aug 2010
- Ward
- Barnhill
- Decision by
- Delegated Team Manager
- Postcode
- HA9 9JR
Site history
Applications at this address on the Brent register
This site has had 4 applications since 2008: 4 approved, 0 refused.
-
12/1140 Granted
Ark Academy, Forty Avenue, Wembley, HA9 9JR
Non-material amendment comprising: relocation of glazing and doors to line of main rear elevation of school of full planning permission 08/2842 dated 04/06/2009 for New school academy (6 forms of entry secondary school, 2 forms of entry primary school & nursery) comprising 2-, 3- and 4-storey main school building, 2-storey sports/drama hall with changing facilities, 3 hard play areas, all-weather, floodlit sports pitch, smaller floodlit sports pitch, outdoor play areas, soft play/natural habitat landscaped area, 45 staff-parking spaces, 3 disabled-parking spaces, 102 cycle-parking spaces and associated landscaping with access from Forty Avenue and Bridge Road, HA9 (as accompanied by: Revised Design and Access Statement dated February 2009; Untitled 3D visualisation drawings received 28 January 2009; Revised Transport Assessment by TPC dated March 2009; Statement of Community involvement in the process of establishing Ark Academy; Flood Risk Assessment Revision A by Dewhurst Macfarlane and Partners; Calculations confirming the proposed academy will discharge less than half the foul plus surface water drainage into the existing sewer system, by Dewhurst Macfarlane and Partners; Additional calculations, by Dewhurst Macfarlane and Partners; Flood Risk Assessment calculation sent by Smith Construction dated 24 March 2009; Energy Statement by Faber Maunsell dated 15 October 2008; Faber Maunsell letter dated 6 February 2009; Faber Maunsell Technical Note dated February 2009; Faber Maunsell document - Issue 2 - October 2008; Faber Maunsell Heat Loss and Overheating Analysis - January 2009; Desk Study and Preliminary Ground Investigation by Soil Consultants dated 14 January 2008; Draft Landscape Management Plan for Wembley Academy Natural Habitat Area along Forty Avenue Site Boundary, by Form Associates dated October 2008; Phase 1 Habitat Survey and Protected Species Assessment, by ecology consultancy dated January 2008; Tree Survey and Arboricultural Report by Challice Consulting Ltd dated 21 July 2008; Willmott Dixon Sport England Response issued 5 February 2009; 'Paper 1' - Educational need for a new secondary school with 2 form entry feeder primary; 'Paper 2' - Site selection for a new school; 'Paper 3' - Open Space Assessment; Ark Academy Access Statement by Jane Simpson Access; Ark Academy Design Challenger/ Advisor Comments dated 23.02.09; Wilmott Dixon response to GLA Stage 1 comments dated 28 January 2009; Wilmott Dixon response to Sport England comments dated 5 February 2009; Council's Screening Opinion and checklist dated 5 June 2008; Report to Executive 'School Places - follow up review of sites and pupil number forecasts - 15 January 2007'; Report to Scrutiny Committee 'Primary and Secondary Places Update' - 26 November 2008; Report to Executive 'A Strategy for the Development of Primary and Secondary Schools - Options for Delivering Additional School Places' - 13 November 2006; Approved Admissions Arrangements for Ark Academy (Primary - 2009/10 school year))
-
09/1360 Granted
Ark Academy, Forty Avenue, Wembley, HA9 9JR
Details pursuant to Condition 5 (Tree Protection), Condition 7 (Breeding Bird Survey), Condition 9 (Tree Survey Details), and Condition 10 (Wheel Wash Facilities) of Deemed (Reg4 Council's Other Development) Reference No. 08/2842 dated 04/06/2009, for New school academy (6 forms of entry secondary school, 2 forms of entry primary school & nursery) comprising 2-, 3- and 4-storey main school building, 2-storey sports/drama hall with changing facilities, 3 hard play areas, all-weather, floodlit sports pitch, smaller floodlit sports pitch, outdoor play areas, soft play/natural habitat landscaped area, 45 staff-parking spaces, 3 disabled-parking spaces, 102 cycle-parking spaces and associated landscaping with access from Forty Avenue and Bridge Road, HA9 (as accompanied by: Revised Design and Access Statement dated February 2009; Untitled 3D visualisation drawings received 28 January 2009; Revised Transport Assessment by TPC dated March 2009; Statement of Community involvement in the process of establishing Ark Academy; Flood Risk Assessment Revision A by Dewhurst Macfarlane and Partners; Calculations confirming the proposed academy will discharge less than half the foul plus surface water drainage into the existing sewer system, by Dewhurst Macfarlane and Partners; Additional calculations, by Dewhurst Macfarlane and Partners; Flood Risk Assessment calculation sent by Smith Construction dated 24 March 2009; Energy Statement by Faber Maunsell dated 15 October 2008; Faber Maunsell letter dated 6 February 2009; Faber Maunsell Technical Note dated February 2009; Faber Maunsell document - Issue 2 - October 2008; Faber Maunsell Heat Loss and Overheating Analysis - January 2009; Desk Study and Preliminary Ground Investigation by Soil Consultants dated 14 January 2008; Draft Landscape Management Plan for Wembley Academy Natural Habitat Area along Forty Avenue Site Boundary, by Form Associates dated October 2008; Phase 1 Habitat Survey and Protected Species Assessment, by ecology consultancy dated January 2008; Tree Survey and Arboricultural Report by Challice Consulting Ltd dated 21 July 2008; Willmott Dixon Sport England Response issued 5 February 2009; 'Paper 1' - Educational need for a new secondary school with 2 form entry feeder primary; 'Paper 2' - Site selection for a new school; 'Paper 3' - Open Space Assessment; Ark Academy Access Statement by Jane Simpson Access; Ark Academy Design Challenger/ Advisor Comments dated 23.02.09; Wilmott Dixon response to GLA Stage 1 comments dated 28 January 2009; Wilmott Dixon response to Sport England comments dated 5 February 2009; Council's Screening Opinion and checklist dated 5 June 2008; Report to Executive 'School Places - follow up review of sites and pupil number forecasts - 15 January 2007'; Report to Scrutiny Committee 'Primary and Secondary Places Update' - 26 November 2008; Report to Executive 'A Strategy for the Development of Primary and Secondary Schools - Options for Delivering Additional School Places' - 13 November 2006; Approved Admissions Arrangements for Ark Academy (Primary - 2009/10 school year))
-
08/2842 Granted
Ark Academy, Forty Avenue, Wembley, HA9 9JR
New school academy (6 forms of entry secondary school, 2 forms of entry primary school & nursery) comprising 2-, 3- and 4-storey main school building, 2-storey sports/drama hall with changing facilities, 3 hard play areas, all-weather, floodlit sports pitch, smaller floodlit sports pitch, outdoor play areas, soft play/natural habitat landscaped area, 45 staff-parking spaces, 3 disabled-parking spaces, 102 cycle-parking spaces and associated landscaping with access from Forty Avenue and Bridge Road, HA9 (as accompanied by: Revised Design and Access Statement dated February 2009; Untitled 3D visualisation drawings received 28 January 2009; Revised Transport Assessment by TPC dated March 2009; Statement of Community involvement in the process of establishing Ark Academy; Flood Risk Assessment Revision A by Dewhurst Macfarlane and Partners; Calculations confirming the proposed academy will discharge less than half the foul plus surface water drainage into the existing sewer system, by Dewhurst Macfarlane and Partners; Additional calculations, by Dewhurst Macfarlane and Partners; Flood Risk Assessment calculation sent by Smith Construction dated 24 March 2009; Energy Statement by Faber Maunsell dated 15 October 2008; Faber Maunsell letter dated 6 February 2009; Faber Maunsell Technical Note dated February 2009; Faber Maunsell document - Issue 2 - October 2008; Faber Maunsell Heat Loss and Overheating Analysis - January 2009; Desk Study and Preliminary Ground Investigation by Soil Consultants dated 14 January 2008; Draft Landscape Management Plan for Wembley Academy Natural Habitat Area along Forty Avenue Site Boundary, by Form Associates dated October 2008; Phase 1 Habitat Survey and Protected Species Assessment, by ecology consultancy dated January 2008; Tree Survey and Arboricultural Report by Challice Consulting Ltd dated 21 July 2008; Willmott Dixon Sport England Response issued 5 February 2009; 'Paper 1' - Educational need for a new secondary school with 2 form entry feeder primary; 'Paper 2' - Site selection for a new school; 'Paper 3' - Open Space Assessment; Ark Academy Access Statement by Jane Simpson Access; Ark Academy Design Challenger/ Advisor Comments dated 23.02.09; Wilmott Dixon response to GLA Stage 1 comments dated 28 January 2009; Wilmott Dixon response to Sport England comments dated 5 February 2009; Council's Screening Opinion and checklist dated 5 June 2008; Report to Executive 'School Places - follow up review of sites and pupil number forecasts - 15 January 2007'; Report to Scrutiny Committee 'Primary and Secondary Places Update' - 26 November 2008; Report to Executive 'A Strategy for the Development of Primary and Secondary Schools - Options for Delivering Additional School Places' - 13 November 2006; Approved Admissions Arrangements for Ark Academy (Primary - 2009/10 school year))
Timeline
Dates from the published record
-
28 Jun 2010
Received by Brent
-
17 Aug 2010
Decision issued: Grant Permission
-
21 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Studio E Architects Agent, an architecture practice registered in Ilford
Liquidation · incorporated 1994 · Ilford
1 application on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
8 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Brent granted permission on 17 August 2010, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Ark Academy, Forty Avenue, Wembley, HA9 9JR
Non-material amendment comprising: relocation of glazing and doors to line of main rear elevation of school of full planning permission 08/2842 dated 04/06/2009 for New school academy (6 forms of entry secondary school, 2 forms of entry primary school & nursery) comprising 2-, 3- and 4-storey main school building, 2-storey sports/drama hall with changing facilities, 3 hard play areas, all-weather, floodlit sports pitch, smaller floodlit sports pitch, outdoor play areas, soft play/natural habitat landscaped area, 45 staff-parking spaces, 3 disabled-parking spaces, 102 cycle-parking spaces and associated landscaping with access from Forty Avenue and Bridge Road, HA9 (as accompanied by: Revised Design and Access Statement dated February 2009; Untitled 3D visualisation drawings received 28 January 2009; Revised Transport Assessment by TPC dated March 2009; Statement of Community involvement in the process of establishing Ark Academy; Flood Risk Assessment Revision A by Dewhurst Macfarlane and Partners; Calculations confirming the proposed academy will discharge less than half the foul plus surface water drainage into the existing sewer system, by Dewhurst Macfarlane and Partners; Additional calculations, by Dewhurst Macfarlane and Partners; Flood Risk Assessment calculation sent by Smith Construction dated 24 March 2009; Energy Statement by Faber Maunsell dated 15 October 2008; Faber Maunsell letter dated 6 February 2009; Faber Maunsell Technical Note dated February 2009; Faber Maunsell document - Issue 2 - October 2008; Faber Maunsell Heat Loss and Overheating Analysis - January 2009; Desk Study and Preliminary Ground Investigation by Soil Consultants dated 14 January 2008; Draft Landscape Management Plan for Wembley Academy Natural Habitat Area along Forty Avenue Site Boundary, by Form Associates dated October 2008; Phase 1 Habitat Survey and Protected Species Assessment, by ecology consultancy dated January 2008; Tree Survey and Arboricultural Report by Challice Consulting Ltd dated 21 July 2008; Willmott Dixon Sport England Response issued 5 February 2009; 'Paper 1' - Educational need for a new secondary school with 2 form entry feeder primary; 'Paper 2' - Site selection for a new school; 'Paper 3' - Open Space Assessment; Ark Academy Access Statement by Jane Simpson Access; Ark Academy Design Challenger/ Advisor Comments dated 23.02.09; Wilmott Dixon response to GLA Stage 1 comments dated 28 January 2009; Wilmott Dixon response to Sport England comments dated 5 February 2009; Council's Screening Opinion and checklist dated 5 June 2008; Report to Executive 'School Places - follow up review of sites and pupil number forecasts - 15 January 2007'; Report to Scrutiny Committee 'Primary and Secondary Places Update' - 26 November 2008; Report to Executive 'A Strategy for the Development of Primary and Secondary Schools - Options for Delivering Additional School Places' - 13 November 2006; Approved Admissions Arrangements for Ark Academy (Primary - 2009/10 school year))
Granted Amendments Windows or glazing Trees 11 docs -
Ark Academy, Forty Avenue, Wembley, HA9 9JR
Details pursuant to Condition 5 (Tree Protection), Condition 7 (Breeding Bird Survey), Condition 9 (Tree Survey Details), and Condition 10 (Wheel Wash Facilities) of Deemed (Reg4 Council's Other Development) Reference No. 08/2842 dated 04/06/2009, for New school academy (6 forms of entry secondary school, 2 forms of entry primary school & nursery) comprising 2-, 3- and 4-storey main school building, 2-storey sports/drama hall with changing facilities, 3 hard play areas, all-weather, floodlit sports pitch, smaller floodlit sports pitch, outdoor play areas, soft play/natural habitat landscaped area, 45 staff-parking spaces, 3 disabled-parking spaces, 102 cycle-parking spaces and associated landscaping with access from Forty Avenue and Bridge Road, HA9 (as accompanied by: Revised Design and Access Statement dated February 2009; Untitled 3D visualisation drawings received 28 January 2009; Revised Transport Assessment by TPC dated March 2009; Statement of Community involvement in the process of establishing Ark Academy; Flood Risk Assessment Revision A by Dewhurst Macfarlane and Partners; Calculations confirming the proposed academy will discharge less than half the foul plus surface water drainage into the existing sewer system, by Dewhurst Macfarlane and Partners; Additional calculations, by Dewhurst Macfarlane and Partners; Flood Risk Assessment calculation sent by Smith Construction dated 24 March 2009; Energy Statement by Faber Maunsell dated 15 October 2008; Faber Maunsell letter dated 6 February 2009; Faber Maunsell Technical Note dated February 2009; Faber Maunsell document - Issue 2 - October 2008; Faber Maunsell Heat Loss and Overheating Analysis - January 2009; Desk Study and Preliminary Ground Investigation by Soil Consultants dated 14 January 2008; Draft Landscape Management Plan for Wembley Academy Natural Habitat Area along Forty Avenue Site Boundary, by Form Associates dated October 2008; Phase 1 Habitat Survey and Protected Species Assessment, by ecology consultancy dated January 2008; Tree Survey and Arboricultural Report by Challice Consulting Ltd dated 21 July 2008; Willmott Dixon Sport England Response issued 5 February 2009; 'Paper 1' - Educational need for a new secondary school with 2 form entry feeder primary; 'Paper 2' - Site selection for a new school; 'Paper 3' - Open Space Assessment; Ark Academy Access Statement by Jane Simpson Access; Ark Academy Design Challenger/ Advisor Comments dated 23.02.09; Wilmott Dixon response to GLA Stage 1 comments dated 28 January 2009; Wilmott Dixon response to Sport England comments dated 5 February 2009; Council's Screening Opinion and checklist dated 5 June 2008; Report to Executive 'School Places - follow up review of sites and pupil number forecasts - 15 January 2007'; Report to Scrutiny Committee 'Primary and Secondary Places Update' - 26 November 2008; Report to Executive 'A Strategy for the Development of Primary and Secondary Schools - Options for Delivering Additional School Places' - 13 November 2006; Approved Admissions Arrangements for Ark Academy (Primary - 2009/10 school year))
Granted Conditions Trees 9 docs -
Ark Academy, Forty Avenue, Wembley, HA9 9JR
New school academy (6 forms of entry secondary school, 2 forms of entry primary school & nursery) comprising 2-, 3- and 4-storey main school building, 2-storey sports/drama hall with changing facilities, 3 hard play areas, all-weather, floodlit sports pitch, smaller floodlit sports pitch, outdoor play areas, soft play/natural habitat landscaped area, 45 staff-parking spaces, 3 disabled-parking spaces, 102 cycle-parking spaces and associated landscaping with access from Forty Avenue and Bridge Road, HA9 (as accompanied by: Revised Design and Access Statement dated February 2009; Untitled 3D visualisation drawings received 28 January 2009; Revised Transport Assessment by TPC dated March 2009; Statement of Community involvement in the process of establishing Ark Academy; Flood Risk Assessment Revision A by Dewhurst Macfarlane and Partners; Calculations confirming the proposed academy will discharge less than half the foul plus surface water drainage into the existing sewer system, by Dewhurst Macfarlane and Partners; Additional calculations, by Dewhurst Macfarlane and Partners; Flood Risk Assessment calculation sent by Smith Construction dated 24 March 2009; Energy Statement by Faber Maunsell dated 15 October 2008; Faber Maunsell letter dated 6 February 2009; Faber Maunsell Technical Note dated February 2009; Faber Maunsell document - Issue 2 - October 2008; Faber Maunsell Heat Loss and Overheating Analysis - January 2009; Desk Study and Preliminary Ground Investigation by Soil Consultants dated 14 January 2008; Draft Landscape Management Plan for Wembley Academy Natural Habitat Area along Forty Avenue Site Boundary, by Form Associates dated October 2008; Phase 1 Habitat Survey and Protected Species Assessment, by ecology consultancy dated January 2008; Tree Survey and Arboricultural Report by Challice Consulting Ltd dated 21 July 2008; Willmott Dixon Sport England Response issued 5 February 2009; 'Paper 1' - Educational need for a new secondary school with 2 form entry feeder primary; 'Paper 2' - Site selection for a new school; 'Paper 3' - Open Space Assessment; Ark Academy Access Statement by Jane Simpson Access; Ark Academy Design Challenger/ Advisor Comments dated 23.02.09; Wilmott Dixon response to GLA Stage 1 comments dated 28 January 2009; Wilmott Dixon response to Sport England comments dated 5 February 2009; Council's Screening Opinion and checklist dated 5 June 2008; Report to Executive 'School Places - follow up review of sites and pupil number forecasts - 15 January 2007'; Report to Scrutiny Committee 'Primary and Secondary Places Update' - 26 November 2008; Report to Executive 'A Strategy for the Development of Primary and Secondary Schools - Options for Delivering Additional School Places' - 13 November 2006; Approved Admissions Arrangements for Ark Academy (Primary - 2009/10 school year))
Granted Other Trees 59 docs -
2A Grand Parade, Forty Avenue, Wembley, HA9 9JS
79% historically approved · decision due ~23 Sep
Certificate of lawfulness for existing use of first floor flat as 10 bed 10 person house of multi...
Awaiting decision -
7 and 7A, Bridge Road, Wembley, HA9 9AB
Proposed erection of internally illuminated digital screen display to side elevation of 7 and 7A Bridge Road
Refused Advertising 12 docs -
17 Bridge Road, Wembley, HA9 9AB
Proposed single storey rear infill extension for ancillary use and provision of bin store at rear of restaurant.
Granted Full applications Extension 8 docsSmall domestic
Other condition discharge and variation applications
In Brent
-
26/2298 Awaiting decision
7 Melbury Road, Harrow, HA3 9RA
Details pursuant to condition 10 (Construction Method Statement), of Full Planning permission reference 26/1352 dated 14/08/2026 for Proposed works to existing dwelling to include the demolition of existing shed, erection of a single storey rear extension, hip to gable end roof extension, rear dormer, installation of 2x front rooflights and the proposed erection of a two-storey dwelling to adjoin No.7 Melbury Road. Associated landscaping alterations, cycle and refuse storage.
-
26/2286 Awaiting decision
1-6 Ashford House, Ashford Road, London, NW2 6TL
Details pursuant to conditions 6 (landscaping) and 8 (construction logistics plan) of Full Planning Permission reference 24/0749 dated 29 July, 2024, for Roof extension including dormer windows with associated rooflights to create a self-contained flat in the roof space and provision of cycle parking and bin store at ground floor.
-
26/2207 Awaiting decision
Land adjacent to Northwick Park Hospital, Nightingale Avenue, London, HA1 3GX
Details pursuant to partially discharge condition 43 (whole life carbon assessment) of Full Planning Permission reference 20/0701 dated 16 March, 2023, for Full planning permission for demolition of existing buildings and structures on the site, all site preparation works for a residential led mixed-use development comprising new homes, associated car and cycle spaces, a replacement nursery, commercial space, associated highways improvements, open space, hard and soft landscaping and public realm works subject to a deed of agreement under Section 106 of the Town and Country Planning Act dated the 16th of March 2023.
-
26/2206 Awaiting decision
Ex Ujima House, 388 High Road, Wembley, HA9 6AR
Details pursuant to condition 23 (permissive path for pedestrians and cyclists) of Outline Planning Permission reference 19/3092 dated 5 February, 2021, for Demolition of the existing building and erection of a new building comprising residential floorspace (Use Class C3), flexible workspace with ancillary cafe, associated hard and soft landscaping, wheelchair car parking and cycle parking.
-
26/0602 Granted
114 Wembley Hill Road, Wembley, HA9 8EN
Details pursuant to condition numbers 8 (construction logistics plan) and 9 (details of cycle storage), of full planning application reference 21/0703 dated 06/08/2021 for Demolition of garage and swimming pool and erection of a two storey dwelling with basement level and partial demolition of fire damaged dwellinghouse (Lodge) and erection of single and two storey extension with basement level and associated landscaping.