Planning application

Located between Birmingham Museum Collection Centre, passing over the River Rea to a point adjacent east of the West Midlands Signalling Centre

Awaiting decision Birmingham 2026/05825/PA High Speed Rail (London to West Midlands) Act 2017

Relates to 2023/06670/PA

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Plans and Specifications submission under Schedule 17 of the High Speed Rail (London - West Midlands) Act 2017 for the construction of the Duddeston Junction Viaduct, associated reinforced concrete abutments and maintenance access infrastructure, attenuation basin, engineering earthworks, maintenance access strips, vehicle parking and turning areas, and the installation of vehicle restraint systems and permanent security fencing (revised submission of 2023/06670/PA)

As published by the council, reference 2026/05825/PA

Application record

Reference
2026/05825/PA
Type
High Speed Rail (London to West Midlands) Act 2017
Status
Pending As published: REGISTERED: Under Consultation
Received
10 Sep 2026
Validated
17 Sep 2026
Ward
Nechells

Comment by 10 October 2026

The council is taking comments on this application until then. Comments go to Birmingham through their own planning portal.

Site history

Applications at this address on the Birmingham register

This site has had 2 applications since 2023: 1 approved, 0 refused.

  • 2023/06670/PA Granted

    Located between Birmingham Museum Collection Centre, passing over the River Rea to a point adjacent east of the West Midlands Signalling Centre

    Building works and Earthworks comprising a viaduct extending over the River Rea. The viaduct includes an integral Maintenance Access Point with a double staircase and pedestrian walkway on either side of the viaduct. Earthworks to include an attenuation basin. This is a Plans and Specifications submission made under Schedule 17 of the High Speed Rail (London-West Midlands) Act 2017.

    Decided 1 Dec 2023 Prior approval

Timeline

Dates from the published record

  1. 10 Sep 2026

    Received by Birmingham

  2. 17 Sep 2026

    Validated

    Checked as complete and ready for consideration.

  3. 21 Sep 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 12 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Birmingham took a median of 66 days over the applications it decided in the last year.

Cases linked to this one on the register

  • 2023/06670/PA Granted

    Located between Birmingham Museum Collection Centre, passing over the River Rea to a point adjacent east of the West Midlands Signalling Centre

    Building works and Earthworks comprising a viaduct extending over the River Rea. The viaduct includes an integral Maintenance Access Point with a double staircase and pedestrian walkway on either side of the viaduct. Earthworks to include an attenuation basin. This is a Plans and Specifications submission made under Schedule 17 of the High Speed Rail (London-West Midlands) Act 2017.

    Decided 1 Dec 2023 Prior approval

Documents

Plans, drawings, consultee responses and the officer's report

26 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Birmingham for determination, against a statutory target of eight weeks. Over the last year Birmingham decided prior approval applications in a median of 35 days. More in our guide to how long planning decisions take.

About prior approval applications

Prior approval applies where permitted development rights already grant the principle of the work, leaving the council only the specific matters the rules name, commonly within 56 days. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 116 Peterfield Avenue Harold Hill Essex RM3 9PH

    2025/02249/PA Submitted 15 Apr 2025 50 yards away

    Change of Use to a Doggy Day Care/Grooming Parlour using Class A Sui Generis

    Withdrawn Full applications 1 doc
  • Moseley Park Birmingham Moseley B13 8DD

    2025/06083/PA Submitted 28 Oct 2025 50 yards away

    71% historically approved · decision due ~17 May

    Construction of new pathway with associated works

    Awaiting decision Full applications 8 docs
  • Land at Maryvale Rise Birmingham B44

    2025/00647/PA Submitted 3 Feb 2025 50 yards away

    Erection of 2no. semi-detached dormer bungalows with associated works

    Refused Full applications Loft or dormer 10 docs
  • Land to the north of the Network Park Industrial Estate and west of Saltley Park Industrial Estate Birmingham

    2024/04900/PA Submitted 24 Jul 2024 50 yards away

    Details of earthworks to form saltley retained fill central to carry HS2 tracks on a level set above the adjacent Network Rail tracks from saltley canal underbridge to saltley retained fill east. Earthworks include retaining walls and supporting embankments, attenuation basin, flood defence bund and maintenance access strip. Road vehicle parking area and security fencing also proposed. This is a plans and specifications submission for lighting made under Schedule 17 paragraph (3) of the High Speed Rail (London-West Midlands) Act 2017.

    Granted Prior approval 19 docs
  • Former MG Works Off Dalmuir Road Longbridge Birmingham B45

    2022/07996/PA Submitted 26 Oct 2022 50 yards away

    Application to determine the details for conditions 2 (Demolition method statement) and 3 (Bat survey) attached to prior notification application 2022/07006/PA

    Granted Conditions Demolition 6 docs
  • Dacoll Ltd, Dacoll House Kingsbury Road Birmingham B76 9DD

    2026/01274/PA Submitted 9 Mar 2026 50 yards away

    Application to determine if prior approval is required for a proposed change of use at ground floor from Commercial, Business & Service (Use Class E) to 5 no. 1 bed flats (Use Class C3)

    Granted Prior approval New dwelling 8 docs

In Birmingham

  • 2026/04898/PA Awaiting decision

    144 Addison Road, Birmingham, B14 7EP

    Erection of 5 metre deep single storey rear extension. Maximum height 3 metres, eaves height 2.8 metres

    Received 10 Aug, published by the council 27 Aug 2026 Prior approval
  • 2026/05834/PA Awaiting decision

    84 Falcon Lodge Crescent, Birmingham, B75 7LU

    Erection of 4 metre deep single storey rear extension. Maximum height 3.8 metres, eaves height 2.7 metres

    Received 17 Sep, published by the council 21 Sep 2026 Prior approval
  • 2026/05833/PA Awaiting decision

    126 Trittiford Road, Birmingham, B13 0HD

    Erection of 6 metre deep single storey rear extension. Maximum height 3.2 metres, eaves height 2.55 metres

    Received 17 Sep, published by the council 21 Sep 2026 Prior approval
  • 2026/04870/PA Awaiting decision

    246 Tennal Road, Birmingham, B32 2HJ

    Erection of 5.3 metre deep single storey rear extension. Maximum height 3.2 metres, eaves height 3 metres

    Received 7 Aug, published by the council 14 Aug 2026 Prior approval
  • 2026/05824/PA Awaiting decision

    land rear of 76 - 78 Yardley Road Birmingham B27 6LG

    Application to determine if prior approval is required for a proposed change of use of part of the building from Commercial, Business & Service (Use Class E) to 1 no. dwellinghouse (Use Class C3)

    Received 16 Sep, published by the council 21 Sep 2026 Prior approval