Planning application

Land to the north of the Network Park Industrial Estate and west of Saltley Park Industrial Estate Birmingham

Granted Birmingham 2024/04900/PA High Speed Rail (London to West Midlands) Act 2017

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Details of earthworks to form saltley retained fill central to carry HS2 tracks on a level set above the adjacent Network Rail tracks from saltley canal underbridge to saltley retained fill east. Earthworks include retaining walls and supporting embankments, attenuation basin, flood defence bund and maintenance access strip. Road vehicle parking area and security fencing also proposed. This is a plans and specifications submission for lighting made under Schedule 17 paragraph (3) of the High Speed Rail (London-West Midlands) Act 2017.

As published by the council, reference 2024/04900/PA

Application record

Reference
2024/04900/PA
Type
High Speed Rail (London to West Midlands) Act 2017
Status
Decided: APPROVE SUBJECT TO CONDITIONS
Decision
APPROVE SUBJECT TO CONDITIONS
Received
24 Jul 2024
Validated
1 Aug 2024
Decided
26 Sep 2024
Ward
Alum Rock

Timeline

Dates from the published record

  1. 24 Jul 2024

    Received by Birmingham

  2. 1 Aug 2024

    Validated

    Checked as complete and ready for consideration.

  3. 26 Sep 2024

    Decision issued: APPROVE SUBJECT TO CONDITIONS

  4. 14 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

19 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Birmingham granted permission on 26 September 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About prior approval applications

Prior approval applies where permitted development rights already grant the principle of the work, leaving the council only the specific matters the rules name, commonly within 56 days. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 116 Peterfield Avenue Harold Hill Essex RM3 9PH

    2025/02249/PA Submitted 15 Apr 2025 0m away

    Change of Use to a Doggy Day Care/Grooming Parlour using Class A Sui Generis

    Withdrawn Full applications 1 doc
  • Moseley Park Birmingham Moseley B13 8DD

    2025/06083/PA Submitted 28 Oct 2025 0m away

    71% historically approved · decision due ~17 May

    Construction of new pathway with associated works

    Awaiting decision Full applications 8 docs
  • Land at Maryvale Rise Birmingham B44

    2025/00647/PA Submitted 3 Feb 2025 0m away

    71% historically approved · decision due ~12 May

    Erection of 2no. semi-detached dormer bungalows with associated works

    Awaiting decision Full applications Loft or dormer 8 docs
  • Dacoll Ltd, Dacoll House Kingsbury Road Birmingham B76 9DD

    2026/01274/PA Submitted 9 Mar 2026 0m away

    Application to determine if prior approval is required for a proposed change of use at ground floor from Commercial, Business & Service (Use Class E) to 5 no. 1 bed flats (Use Class C3)

    Granted Prior approval New dwelling 8 docs
  • Land adjacent Sainsburys Selly Oak Shopping Park Selly Oak Birmingham B29 6SN

    2025/04874/PA Submitted 1 Sep 2025 0m away

    71% historically approved · decision due ~8 Jun

    Installation of new section of canal with residential moorings, installation of swing bridge and creation of bunds

    Awaiting decision Full applications 9 docs
  • 8 Redfern Road Tyseley Birmingham B11 2BH

    2024/06964/PA Submitted 31 Oct 2024 0m away

    Notification for Prior Approval for the installation of 729 roof mounted Solar PV panels with 386.37 kWp capacity

    Granted Prior approval 9 docs

In Birmingham

  • 2026/04402/PA Granted

    69 Dads Lane, Birmingham, B13 8PG

    Erection of 5 metre deep single storey rear extension. Maximum height 3.7 metres, eaves height 2.7 metres

    22 Jul 2026 Prior approval
  • 2026/04343/PA Granted

    45 Horse Shoes Lane, Birmingham, B26 3HS

    Erection of 6 metre deep single storey rear extension. Maximum height 3.9 metres, eaves height 2.8 metres

    15 Jul 2026 Prior approval
  • 2026/05415/PA Awaiting decision

    90 Hoggs Lane, Birmingham, B31 1SR

    Erection of 5.07 metre deep single storey rear extension. Maximum height 3 metres, eaves height 3 metres

    2 Sep 2026 Prior approval
  • 2026/05432/PA Awaiting decision

    35 Albert Road, Birmingham, B21 9LA

    Erection of 6 metre deep single storey rear extension. Maximum height 3 metres, eaves height 2.6 metres

    2 Sep 2026 Prior approval
  • 2026/04564/PA Granted

    307 Streetly Road, Birmingham, B23 5JN

    Erection of 6 metre deep single storey rear extension. Maximum height 3 metres, eaves height 3 metres

    31 Jul 2026 Prior approval