Planning application

8 Redfern Road Tyseley Birmingham B11 2BH

Granted Birmingham 2024/06964/PA Permitted Development Commercial from May 2013

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Notification for Prior Approval for the installation of 729 roof mounted Solar PV panels with 386.37 kWp capacity

As published by the council, reference 2024/06964/PA

Application record

Reference
2024/06964/PA
Type
Permitted Development Commercial from May 2013
Status
Granted As published: Decided: NO PRIOR APPROVAL REQUIRED
Decision
Granted As published: NO PRIOR APPROVAL REQUIRED
Received
31 Oct 2024
Validated
4 Nov 2024
Decided
17 Dec 2024
Ward
Tyseley & Hay Mills
Postcode
B11 2BH

Timeline

Dates from the published record

  1. 31 Oct 2024

    Received by Birmingham

  2. 4 Nov 2024

    Validated

    Checked as complete and ready for consideration.

  3. 17 Dec 2024

    Decision issued: NO PRIOR APPROVAL REQUIRED

  4. 7 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

9 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Birmingham granted permission on 17 December 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About prior approval applications

Prior approval applies where permitted development rights already grant the principle of the work, leaving the council only the specific matters the rules name, commonly within 56 days. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 116 Peterfield Avenue Harold Hill Essex RM3 9PH

    2025/02249/PA Submitted 15 Apr 2025 50 yards away

    Change of Use to a Doggy Day Care/Grooming Parlour using Class A Sui Generis

    Withdrawn Full applications 1 doc
  • Moseley Park Birmingham Moseley B13 8DD

    2025/06083/PA Submitted 28 Oct 2025 50 yards away

    71% historically approved · decision due ~17 May

    Construction of new pathway with associated works

    Awaiting decision Full applications 11 docs
  • Rockwool Peddimore Sutton Coldfield Birmingham

    2024/07706/PA Submitted 4 Dec 2024 50 yards away

    Environmental Impact Assessment scoping request for addendum to original 2019 Environmental Assessment to account for proposed amendments to increases in heights on the approved parameters plan

    Decided Prior approval 2 docs
  • Land at Maryvale Rise Birmingham B44

    2025/00647/PA Submitted 3 Feb 2025 50 yards away

    Erection of 2no. semi-detached dormer bungalows with associated works

    Refused Full applications Loft or dormer 10 docs
  • Land to the north of the Network Park Industrial Estate and west of Saltley Park Industrial Estate Birmingham

    2024/04900/PA Submitted 24 Jul 2024 50 yards away

    Details of earthworks to form saltley retained fill central to carry HS2 tracks on a level set above the adjacent Network Rail tracks from saltley canal underbridge to saltley retained fill east. Earthworks include retaining walls and supporting embankments, attenuation basin, flood defence bund and maintenance access strip. Road vehicle parking area and security fencing also proposed. This is a plans and specifications submission for lighting made under Schedule 17 paragraph (3) of the High Speed Rail (London-West Midlands) Act 2017.

    Granted Prior approval 19 docs
  • Located between Birmingham Museum Collection Centre, passing over the River Rea to a point adjacent east of the West Midlands Signalling Centre

    2026/05825/PA Submitted 10 Sep 2026 50 yards away

    89% historically approved · decision due ~12 Nov

    Plans and Specifications submission under Schedule 17 of the High Speed Rail (London - West Midlands) Act 2017 for the construction of the Duddeston Junction Viaduct, associated reinforced concrete abutments and maintenance access infrastructure, attenuation basin, engineering earthworks, maintenance access strips, vehicle parking and turning areas, and the installation of vehicle restraint systems and permanent security fencing (revised submission of 2023/06670/PA)

    Awaiting decision Prior approval 26 docs

In Birmingham

  • 2026/06224/PA Awaiting decision

    29 The Grove, Birmingham, B31 3JX

    Erection of 4 metre deep single storey rear extension. Maximum height 3.8 metres, eaves height 2.65 metres

    Received 8 Oct, published by the council 12 Oct 2026 Prior approval
  • 2026/06212/PA Awaiting decision

    137 Hodge Hill Road, Birmingham, B34 6DY

    Erection of 6 metre deep single storey rear extension. Maximum height 3.8 metres, eaves height 2.8 metres

    Received 8 Oct, published by the council 12 Oct 2026 Prior approval
  • 2026/05112/PA Granted

    83 Fox Green Crescent, Birmingham, B27 7SG

    Erection of 5 metre deep single storey rear extension. Maximum height 3.9 metres, eaves height 3 metres

    Received 21 Aug, published by the council 27 Aug 2026 Prior approval
  • 2026/05062/PA Granted

    10 Brewers Square, Birmingham, B16 0PN

    Erection of 3.5 metre deep single storey rear extension. Maximum height 4 metres, eaves height 3 metres

    Received 18 Aug, published by the council 11 Sep 2026 Prior approval
  • 2026/04891/PA Granted

    95 Millhouse Road, Birmingham, B25 8QT

    Erection of 4 metre deep single storey rear extension. Maximum height 3.8 metres, eaves height 2.7 metres

    Received 10 Aug, published by the council 11 Sep 2026 Prior approval