Skip to content
PlanIndex Get alerts
Menu

Planning application

AMIC Harbour Building, 5 Airport Road, Belfast, BT3 9EF

Awaiting decision Belfast LA04/2026/1262/F Full

Works: Extension Demolition

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Demolition of buildings to south-west of main building, erection of double height extension on south-west side facing Airport Road (18.08m height) with triple height extension (21.85m height) to rear on south-west side, erection of double height extension (12.07m height) on north-east side (total additional 6,754m² floorspace Use Class (B1)(c)). PV panels, access from Airport Road, car parking, cycle parking, boundary fencing and all other associated works.

As published by the council, reference LA04/2026/1262/F

Application record

Reference
LA04/2026/1262/F
Type
Full
Status
Consultation Open
Received
9 Jul 2026
Validated
9 Jul 2026
Ward
Sydenham
Postcode
BT3 9EF

Timeline

Dates from the published record

  1. 9 Jul 2026

    Received by Belfast

  2. 6 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 3 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Belfast took a median of 99 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Agent on file, a planning consultancy registered in Co Down

41 applications on PlanIndex · across 8 councils · 100% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

53 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Belfast for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • NIACE Building, 5 Airport Road, Belfast, BT3 9EF

    LA04/2026/0719/PAN Submitted 17 Apr 2026 0m away

    Extension to and internal reconfiguration of the NIACE Building (Use Class B1(c). The development of an additional 6,750 sqm (approx.) gross floorspace to the southwest and northeast of the existing NIACE Building and the internal reconfiguration of 1,100 sqm (approx.) of the existing 3,912 sqm gross floorspace. Demolition of dilapidated buildings to the southwest, access from Airport Road, car parking, associated operational development and enabling works.

    Decided Extension Demolition 3 docs
  • Harland and Wolff Queens Island, Belfast, BT3 9DU

    LA04/2026/0401/F Submitted 25 Feb 2026 388m away

    98% historically approved · decision due ~22 Apr

    4no moving tent covers for final assembly of ship components (Class B3)

    Awaiting decision Full applications 9 docs
  • Approximately 75 metres South-West of No.1 Airport Road Belfast.

    LA04/2026/1396/A Submitted 4 Aug 2026 402m away

    99% historically approved · decision due ~30 Sep

    Replacement of existing LED advertising with Digital Screen

    Awaiting decision Advertising 8 docs
  • Glentoran FC, Parkgate Drive, Belfast, BT4 1EW.

    LA04/2025/1879/A Submitted 4 Nov 2025 444m away

    1 Hoarding, 2 Digital (retrospective)

    Granted Advertising 8 docs
  • 81 Sydenham Road, Belfast, BT3 9DJ

    LA04/2025/1529/F Submitted 15 Sep 2025 479m away

    Change of use of storage and distribution (Class B4) to offices (Class B1) with elevational changes

    Withdrawn Full applications 14 docs
  • The Oval, Parkgate Drive, Belfast, BT4 1EW

    LA04/2023/3230/F Submitted 12 May 2023 491m away

    98% historically approved · decision due ~8 Aug

    Proposed replacement of existing natural grass pitch with new synthetic 3G surface and associated drainage

    Awaiting decision Full applications 25 docs

In Belfast

  • 5 Kingsway Gardens, Belfast, BT5 7DQ

    Rear extension and rear dormer. Existing roof to be re-tiled.

    26 May 2026 Full applications
  • 67 Martinez Avenue, Belfast, BT5 5LY

    Retrospective raised patio to the rear of the property

    27 Apr 2026 Full applications
  • LA04/2026/1520/F Awaiting decision

    64 Sandhurst Drive, Belfast, BT9 5AZ

    Demolition of existing garage and addition of two storey side and rear extension, including internal alterations.

    29 Aug 2026 Full applications
  • Parkdean Care Home 44 Fortwilliam Park, Belfast, BT15 4AS

    Proposed creation of front and rear landscaped garden areas, alterations to ground levels, new garden building, new boundary fencing and landscaping.

    12 Dec 2025 Full applications
  • 5 Diamond Avenue, Belfast, BT10 0HG

    Single-storey front extension and fenestration changes (Amended description)

    28 May 2026 Full applications