Planning application

The Oval, Parkgate Drive, Belfast, BT4 1EW

Awaiting decision Belfast LA04/2023/3230/F Full

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Proposed replacement of existing natural grass pitch with new synthetic 3G surface and associated drainage

As published by the council, reference LA04/2023/3230/F

Application record

Reference
LA04/2023/3230/F
Type
Full
Status
Consultation Open
Received
12 May 2023
Validated
13 Jun 2023
Ward
Connswater
Postcode
BT4 1EW

Timeline

Dates from the published record

  1. 12 May 2023

    Received by Belfast

  2. 13 Jun 2023

    Validated

    Checked as complete and ready for consideration.

  3. 29 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 8 August 2023, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Belfast took a median of 99 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Agent on file, an architecture practice registered in Belfast

29 applications on PlanIndex · across 10 councils · 100% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

25 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Belfast for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Glentoran FC, Parkgate Drive, Belfast, BT4 1EW.

    LA04/2025/1879/A Submitted 4 Nov 2025 47m away

    1 Hoarding, 2 Digital (retrospective)

    Granted Advertising 8 docs
  • Approximately 75 metres South-West of No.1 Airport Road Belfast.

    LA04/2026/1396/A Submitted 4 Aug 2026 295m away

    99% historically approved · decision due ~30 Sep

    Replacement of existing LED advertising with Digital Screen

    Awaiting decision Advertising 8 docs
  • 146 Parkgate Avenue, Belfast, BT4 1JD

    LA04/2026/0420/DC Submitted 4 Mar 2026 334m away

    Discharge Condition 13 of LA04/2022/0118/F - Waste Management Plan

    Decided Conditions 4 docs
  • 146 Parkgate Avenue, Belfast, BT4 1JD

    LA04/2025/0567/NMC Submitted 2 Apr 2025 345m away

    86% historically approved · decision due ~28 May

    NMC to LA04/2022/0118/F - NIE substation incorporated into layout to south of site. Section of footpath extended from entrance area to wheelchair apartment 2. Door at end of corridor changed to automatic opening vent (Samson building 'North Gable Elevation'). Secure drying area incorporated into area at end of Samson building. Minor bin storage area added to area at end of Goliath building.

    Awaiting decision Amendments 6 docs
  • 146 Parkgate Avenue, Belfast, BT41TJ

    LA04/2025/1559/DC Submitted 18 Sep 2025 345m away

    Discharge Condition 10 of LA04/2022/0118/F- Tree protection.

    Decided Conditions Trees 4 docs
  • 117 Park Avenue, Belfast, BT4 1JJ

    LA04/2025/2208/F Submitted 19 Dec 2025 411m away

    Single storey extension to the rear and side, including demolition of single-storey return and relocation of side vehicular access gate.

    Granted Full applications Extension Demolition 12 docs
    Small domestic

In Belfast

  • 5 Kingsway Gardens, Belfast, BT5 7DQ

    Rear extension and rear dormer. Existing roof to be re-tiled.

    26 May 2026 Full applications
  • 67 Martinez Avenue, Belfast, BT5 5LY

    Retrospective raised patio to the rear of the property

    27 Apr 2026 Full applications
  • LA04/2026/1520/F Awaiting decision

    64 Sandhurst Drive, Belfast, BT9 5AZ

    Demolition of existing garage and addition of two storey side and rear extension, including internal alterations.

    29 Aug 2026 Full applications
  • Parkdean Care Home 44 Fortwilliam Park, Belfast, BT15 4AS

    Proposed creation of front and rear landscaped garden areas, alterations to ground levels, new garden building, new boundary fencing and landscaping.

    12 Dec 2025 Full applications
  • 5 Diamond Avenue, Belfast, BT10 0HG

    Single-storey front extension and fenestration changes (Amended description)

    28 May 2026 Full applications