Planning application
Airbus WPU, Airport Road West, Belfast, BT3 9ED
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Non-Material Change to approval LA04/2019/2850/F- minor adjustments including slightly increased office area, changes to office elevations, change to roof profile of autoclave bay, addition of roof access stair to east elevation (of Phase 1A), and increase in comms room to east elevation (of Phase 1A).
As published by the council, reference LA04/2026/1227/NMC
Application record
- Reference
- LA04/2026/1227/NMC
- Type
- Non Material Change
- Status
- Valid
- Received
- 6 Jul 2026
- Validated
- 15 Jul 2026
- Ward
- Sydenham
- Postcode
- BT3 9ED
Timeline
Dates from the published record
-
6 Jul 2026
Received by Belfast
-
15 Jul 2026
Validated
Checked as complete and ready for consideration.
-
22 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 9 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Belfast took a median of 106 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Rapport Architects Agent, an architecture practice registered in Belfast
Active · incorporated 2011 · Belfast
13 applications on PlanIndex · across 2 councils
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
1 document on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Belfast for determination, against a statutory target of eight weeks. Over the last year Belfast decided amendment applications in a median of 62 days. More in our guide to how long planning decisions take.
About amendment applications
An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Spirit Aerosystems, Lands circa. 150m East of 7 Airport Road West, Belfast, BT3 9DZ
Erection of a new associated office building (approx. 10,125 m² GIA) with associated infrastructure and ancillary facilities, including substations, security and waste management facilities, parking for cars, HGVs and cycles spaces, new site access, internal roads, and all associated works.
Granted 4 docs -
Lands adjacent to 84 Heron Road, Belfast, BT3 9EA
Retention of hardstanding area for the storage of vehicles. Amendments to existing access; Erection of boundary treatments, lighting and access control gates.
Granted Full applications 27 docs -
Click Oil, 84 Heron Road, Belfast, BT3 9EA
97% historically approved · decision due ~20 Apr
Part retrospective permission for retention of warehouse for storage and distribution including ancillary office use, erection of unmanned petrol station, above ground tanks and associated works. Prospective single storey rear extension to existing warehouse, underground fuel tank and associated works including a new canopy, two wash bays, lighting columns, re-siting of existing fuel pump, landscaping, boundary treatments, control gates and amended access.
Awaiting decision Full applications Extension 48 docsSmall domestic -
Belfast City Airport, Sydenham Bypass, Belfast. BT3 9JH
Belfast City Airport is proposing a programme of improvements to enhance passenger facilities, improve aircraft operations and strengthen connectivity to and from the airport. This PAN relates to a proposed outline planning application for supporting airport infrastructure and associated development, including: • ancillary aviation operations, including aircraft hangars, aviation fuel tanks and associated infrastructure; • a hotel; • the installation of solar photovoltaic (PV) panels at various locations across the airport; • an electric vehicle charging hub; and • improvements to landscaping, drainage, utilities, servicing infrastructure, and other ancillary development
Granted 5 docs -
Belfast City Airport, Sydenham Bypass, Belfast. BT3 9JH
Belfast City Airport is proposing a programme of improvements to enhance passenger facilities, improve aircraft operations and strengthen connectivity to and from the airport. The proposals include both physical redevelopment works and changes to existing operational controls set out in the Planning Agreement, including an increase in the permitted number of aircraft take-offs and landings per annum and amendments to the hours during which aircraft operations may take place. The proposed development comprises: • Extensions and alterations to the existing passenger terminal, including construction of a replacement passenger pier and associated aircraft boarding facilities. • Additional aircraft stands and improvements to apron and taxiway infrastructure. • Improvements to airfield operational facilities and supporting infrastructure. • Inclusion of sustainable construction measures and low carbon technologies. • Surface access and infrastructure improvements comprising a multi-modal forecourt. • Enhancements to vehicular access, egress and internal circulation, including creation of a new left slip road from the Sydenham Bypass into the airport and improvements to the airport entrance through a dual right turn lane. • Rationalisation and enhancement of car parking provision, including a creation of a multi-storey car park and long stay car park. • Installation of a foul sewer connection from the onsite pumping station to Kinnegar Wastewater Treatment Works. • A temporary construction compound, and associated infrastructure, engineering, landscaping and ancillary works.
Granted Extension 6 docs -
Belfast City Airport Sydenham Bypass Belfast BT3 9JH Northern Ireland
This PAN relates to a proposed outline planning application affecting land within the administrative areas of both Belfast City Council and Ards and North Down Borough Council. Separate PANs have been submitted to each Council and should be read alongside the parallel PAN for the proposed outline planning application at Belfast City Airport. The consultation arrangements set out in Section G apply to both planning applications and to the proposed amendments to the Planning Agreement, which are being undertaken as part of a voluntary public consultation process. Belfast City Airport is proposing a programme of improvements to enhance passenger facilities, improve aircraft operations and strengthen connectivity to and from the airport. This PAN relates to a proposed outline planning application for supporting airport infrastructure and associated development including:: •ancillary aviation operations, including aircraft hangars, aviation fuel tanks and associated infrastructure; •a hotel; •the installation of solar photovoltaic (PV) panels at various locations across the airport; • an electric vehicle charging hub; and • improvements to landscaping, drainage, utilities, servicing infrastructure, and other ancillary development.
Granted 4 docs
Other amendment applications
In Belfast
-
LA04/2026/0836/NMC Granted
Lands located on the corner junction of Hamilton Road, to the south of the T13 Building (We are Vertigo) located on Queens Road, Titanic Quarter, Belfast BT3 9DT.
Minor amendment to access arrangements and boundary wall as previously approved under planning reference LA04/2022/1420/F
-
LA04/2026/1588/NMC Refused
43 Houston Park, Belfast, BT5 6AT
Enlargement and alterations to rear dormer previously approved under LA04/2025/1830/F.
-
LA04/2026/1593/NMC Refused
63 Gilnahirk Road, Belfast, BT5 7DE
Amendments to positioning and size of the approved 3nr front dormers NMC - LA04/2025/0262/F.
-
LA04/2026/1321/NMC Refused
35 Wynchurch Avenue, Belfast, BT6 0JP
Amendment from pitched roof to flat roof on the two storey extension to previous planning permission LA04/2025/1895/F.
-
LA04/2026/1153/NMC Granted
1-21 Castlereagh Road Ballymacarret Belfast BT5 5FB
NMC to approval LA04/2023/2763/F. Alterations include amendments to internal layouts, window alterations,balcony amendments, alterations to approved materials.