Planning application
Click Oil, 84 Heron Road, Belfast, BT3 9EA
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Part retrospective permission for retention of warehouse for storage and distribution including ancillary office use, erection of unmanned petrol station, above ground tanks and associated works. Prospective single storey rear extension to existing warehouse, underground fuel tank and associated works including a new canopy, two wash bays, lighting columns, re-siting of existing fuel pump, landscaping, boundary treatments, control gates and amended access.
As published by the council, reference LA04/2025/1890/F
Application record
- Reference
- LA04/2025/1890/F
- Type
- Full
- Status
- Consultation Open
- Received
- 6 Nov 2025
- Validated
- 23 Feb 2026
- Ward
- Sydenham
- Postcode
- BT3 9EA
Timeline
Dates from the published record
-
6 Nov 2025
Received by Belfast
-
23 Feb 2026
Validated
Checked as complete and ready for consideration.
-
22 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 20 April 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Belfast took a median of 101 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Clarman Architects LTD Agent, an architecture practice
16 applications on PlanIndex · across 5 councils
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
48 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Belfast for determination, against a statutory target of eight weeks. Over the last year Belfast decided full applications in a median of 119 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Lands adjacent to 84 Heron Road, Belfast, BT3 9EA
Retention of hardstanding area for the storage of vehicles. Amendments to existing access; Erection of boundary treatments, lighting and access control gates.
Granted Full applications 26 docs -
Airbus WPU, Airport Road West, Belfast, BT3 9ED
86% historically approved · decision due ~9 Sep
Non-Material Change to approval LA04/2019/2850/F- minor adjustments including slightly increased office area, changes to office elevations, change to roof profile of autoclave bay, addition of roof access stair to east elevation (of Phase 1A), and increase in comms room to east elevation (of Phase 1A).
Awaiting decision Amendments 1 doc -
Spirit Aerosystems, Lands circa. 150m East of 7 Airport Road West, Belfast, BT3 9DZ
Erection of a new associated office building (approx. 10,125 m² GIA) with associated infrastructure and ancillary facilities, including substations, security and waste management facilities, parking for cars, HGVs and cycles spaces, new site access, internal roads, and all associated works.
Granted 4 docs -
Lands at Irwin Way, Belfast Harbour Estate. Located approximately 140m northwest of 7 Airport Road West, Belfast and approximately 200m northeast 11 Airport Road West, Belfast, BT3 9ED.
98% historically approved · decision due ~12 Mar
Storage and Distribution Warehouse for the refurbishment and processing of gas cylinders (to include degassing zone, shot blasting area, powder coating and pressure testing zones & external secure storage area) with office and ancillary spaces, roof mounted PV, and, all associated site works including car parking, new vehicular and servicing access, EV charging stations, refuse store, external tanks and substation.
Awaiting decision Full applications 54 docs
Other full applications
In Belfast
-
LA04/2025/1954/F Granted
16 Sans Souci Park, Belfast, BT9 5BZ
Solar Panels on the south facing roof slope
-
LA04/2026/0711/F Granted
10 Casaeldona Rise, Belfast, BT6 9RA
single-storey rear extension and first-floor rear extension; alterations to windows
-
LA04/2026/0421/F Withdrawn
Footpath south of 272-274 Upper Newtownards Road, Belfast, County Antrim, BT4 3EU
Existing 11.5m lamp post to be removed and replaced with a 20m street pole with a wraparound cabinet. Proposed 9no. antennas, 2no. GPS nodes, 1no. bowler cabinet, 1no. cabinet, and ancillary upgrades thereto.
-
LA04/2026/0374/F Granted
17 Castlemore Avenue, Belfast, BT6 9RF
Retention of lean to garage to side of dwelling and area of hardstanding to front (Amended Description and plans).
-
LA04/2025/0635/F Refused
142 Ravenhill Road, Belfast, BT6 8ED
Change of use from ground floor shop (A1) to studio apartment (C1) alterations to building facades and additional site works.