Planning application
1 Rugby Road, Belfast, BT7 1PS
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Change of use from Creche/Day Care Nursery (Class D1) to Purpose Built Managed Student Accommodation (Sui Generis) (9 single rooms, 2 twin rooms).
As published by the council, reference LA04/2026/0540/F
Application record
- Reference
- LA04/2026/0540/F
- Type
- Full
- Status
- Consultation Open
- Received
- 9 Mar 2026
- Validated
- 23 Mar 2026
- Ward
- Central
- Postcode
- BT7 1PS
Site history
Applications at this address on the Belfast register
This site has had 2 applications since 2024: 1 approved, 0 refused.
-
LA04/2024/1924/F Granted
1 Rugby Road, Belfast, BT7 1PS
Change of use from creche/day nursery to office accommodation.
Timeline
Dates from the published record
-
9 Mar 2026
Received by Belfast
-
23 Mar 2026
Validated
Checked as complete and ready for consideration.
-
22 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 18 May 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Belfast took a median of 106 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Fleming Mounstephen Planning Agent, a planning consultancy registered in Co Down
Active · incorporated 2007 · Co Down
45 applications on PlanIndex · across 8 councils · 100% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
27 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Belfast for determination, against a statutory target of eight weeks. Over the last year Belfast decided full applications in a median of 132 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
1 Rugby Road, Belfast, BT7 1PS
Change of use from creche/day nursery to office accommodation.
Granted Full applications 12 docs -
108 Botanic Avenue, Belfast, BT7 1JT
Strengthen existing ceiling in ground floor room and repair existing lath and plaster ceiling. Re-fix/replace heaving floor boards on the second floor and re-lay/replace existing carpet floor covering.
Granted Heritage and listed buildings 14 docs -
The McClay Library, 10 College Park, Belfast, BT7 1LP
98% historically approved · decision due ~13 Nov
Free standing digital display screen
Awaiting decision Advertising 5 docs -
The Mcclay Library, 10 College Park Avenue, Belfast, BT7 1LP
2.1m high signage structure for digital display screen
Granted Full applications 5 docs -
16 Rugby Road Belfast BT7 1PU
Change of use from House of multiple occupancy to serviced accommodation.
Granted Full applications 13 docs -
16 Rugby Road, Belfast, BT7 1PS
100% historically approved · decision due ~18 May
A Management Plan is submitted in respect of Condition 2 of planning permission LA04/2022/1980/F. For clarity, this Management Plan was previously issued to Belfast City Council by email on 31 May 2023, within the required three-month timeframe following the decision notice. The submission clearly referenced the above application. At that time, a response was received advising that applications should be made via the online portal. This was understood as general procedural guidance rather than an indication that the submitted information would not be accepted or required formal re-submission. In order to regularise the position and assist with formal discharge of the condition, the Management Plan is hereby re-submitted via the planning portal. It is respectfully requested that the original submission date is noted and taken into account, and that the discharge of Condition 2 is progressed at the earliest opportunity
Awaiting decision Conditions 1 doc
Other full applications
In Belfast
-
LA04/2025/1410/F Granted
40 Sydenham Park, Belfast, BT4 1PW
2 storey side extension. Widening of driveway
-
LA04/2025/1117/F Withdrawn
3 Clara Crescent Upper, Belfast, BT5 5EQ
Change of use from 4 bed dwelling to 5 bed / 5 person HMO including single storey extension to kitchen
-
la04/2026/0151/F Granted
42 Clara Park, Belfast, BT5 6FE
Demolition of existing single storey rear extensions to make way for a proposed new single storey extension to the rear
-
LA04/2026/1426/F Granted
6 North Sperrin, Belfast, BT5 7HU
Single storey rear and side extension and new rear patio. Demoliton of existing garage.
-
LA04/2026/1219/F Granted
96 Rosebery Road, Belfast, BT6 8JF
Replacement single storey rear extension