Skip to content
PlanIndex Get alerts
Menu

Planning application

77 Eglantine Avenue, Belfast, BT9 6EW

Awaiting decision Belfast LA04/2026/0116/F Full

Works: New dwelling Demolition Several homes

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Change of use from self contained offices to 3 No. apartments (1 No. 1-bed & 2 No. 2-bed) including part demolition of existing two storey rear return to allow for new three storey rear return and associated site works

As published by the council, reference LA04/2026/0116/F

Application record

Reference
LA04/2026/0116/F
Type
Full
Status
Consultation Open
Received
26 Jan 2026
Validated
20 Feb 2026
Ward
Windsor
Postcode
BT9 6EW

Timeline

Dates from the published record

  1. 26 Jan 2026

    Received by Belfast

  2. 20 Feb 2026

    Validated

    Checked as complete and ready for consideration.

  3. 22 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 17 April 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Belfast took a median of 101 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

CMP Planning & Design Ltd Agent, a planning consultancy registered in Belfast

Active · incorporated 2024 · Belfast

38 applications on PlanIndex · across 6 councils · 100% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

15 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Belfast for determination, against a statutory target of eight weeks. Over the last year Belfast decided full applications in a median of 119 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 64 Malone Avenue, Belfast, BT9 6ER

    LA04/2026/1424/F Submitted 12 Aug 2026 0.1 miles away

    98% historically approved · decision due ~7 Oct

    Change of use of existing 7-bed HMO in first and second floors to form 1No 2-bed apartment & 1No 3-bed apartment (existing ground floor apartment unaltered), including associated siteworks

    Awaiting decision Full applications 12 docs
  • 70 Malone Avenue, Belfast, BT9 6ER

    LA04/2026/0906/F Submitted 18 May 2026 0.1 miles away

    98% historically approved · decision due ~4 Aug

    Conversion of existing terraced property from 8-bed HMO to 3no. 2-bed flats. Single storey rear extension and second floor extension to rear return. Alterations to elevations.

    Awaiting decision Full applications New dwelling Extension 5 docs
    Small domestic
  • 70 Malone Avenue, Belfast, BT9 6ER

    LA04/2026/0908/DCA Submitted 18 May 2026 0.1 miles away

    98% historically approved · decision due ~13 Aug

    Conversion of existing terraced property from 8-bed HMO to 3no. 2-bed flats. Rear offshoot extension and ground floor rear extension. Replacement windows.

    Awaiting decision Heritage and listed buildings New dwelling Extension +1 5 docs
  • 18 Wellington Park, Belfast, BT9 6DJ

    LA04/2026/1278/F Submitted 16 Jul 2026 0.1 miles away

    Retrospective alterations to rear boundary wall of dwelling to form access door

    Granted Full applications 5 docs
    Small domestic
  • 40-42 Eglantine Avenue, Belfast, BT9 6DX

    LA04/2026/0819/F Submitted 6 May 2026 0.1 miles away

    98% historically approved · decision due ~21 Aug

    Change of Use from 1st & 2nd Floor Offices to 13No. Single-person long and short term Accommodation Units associated with the charity

    Awaiting decision Full applications 13 docs
  • 106 Malone Avenue, Belfast, BT9 6ES

    LA04/2025/2180/F Submitted 17 Dec 2025 0.1 miles away

    Change of use from residential dwelling to short term let (ground floor)

    Refused Full applications 11 docs
    Domestic

In Belfast

  • 16 Sans Souci Park, Belfast, BT9 5BZ

    Solar Panels on the south facing roof slope

    Received 13 Nov, published by the council 22 Jul 2026 Full applications
  • 10 Casaeldona Rise, Belfast, BT6 9RA

    single-storey rear extension and first-floor rear extension; alterations to windows

    Received 15 Apr, published by the council 22 Jul 2026 Full applications
  • LA04/2026/0421/F Withdrawn

    Footpath south of 272-274 Upper Newtownards Road, Belfast, County Antrim, BT4 3EU

    Existing 11.5m lamp post to be removed and replaced with a 20m street pole with a wraparound cabinet. Proposed 9no. antennas, 2no. GPS nodes, 1no. bowler cabinet, 1no. cabinet, and ancillary upgrades thereto.

    Received 5 Mar, published by the council 22 Jul 2026 Full applications
  • 17 Castlemore Avenue, Belfast, BT6 9RF

    Retention of lean to garage to side of dwelling and area of hardstanding to front (Amended Description and plans).

    Received 2 Mar, published by the council 22 Jul 2026 Full applications
  • 142 Ravenhill Road, Belfast, BT6 8ED

    Change of use from ground floor shop (A1) to studio apartment (C1) alterations to building facades and additional site works.

    Received 14 Apr, published by the council 6 Aug 2026 Full applications