Planning application

146 Parkgate Avenue, Belfast, BT4 1JD

Awaiting decision Belfast LA04/2025/0567/NMC Non Material Change

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

NMC to LA04/2022/0118/F - NIE substation incorporated into layout to south of site. Section of footpath extended from entrance area to wheelchair apartment 2. Door at end of corridor changed to automatic opening vent (Samson building 'North Gable Elevation'). Secure drying area incorporated into area at end of Samson building. Minor bin storage area added to area at end of Goliath building.

As published by the council, reference LA04/2025/0567/NMC

Application record

Reference
LA04/2025/0567/NMC
Type
Non Material Change
Status
Under Consideration
Received
2 Apr 2025
Validated
2 Apr 2025
Ward
Connswater
Postcode
BT4 1JD

Timeline

Dates from the published record

  1. 2 Apr 2025

    Received by Belfast

  2. 6 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 28 May 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Belfast took a median of 99 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Agent on file, an architecture practice registered in Belfast

26 applications on PlanIndex · across 9 councils · 91% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Belfast for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About amendments applications

How this application type works

An amendment application changes a permission that already exists. Non-material amendments cover small adjustments with no wider effect, while minor material amendments, usually made by varying a condition, allow modest design changes without a fresh application. Anything beyond that needs a new permission, so the scope here is deliberately narrow.

More on amendments applications in our guide

Nearby applications

Within 500 metres

  • 146 Parkgate Avenue, Belfast, BT41TJ

    LA04/2025/1559/DC Submitted 18 Sep 2025 0m away

    Discharge Condition 10 of LA04/2022/0118/F- Tree protection.

    Decided Conditions Trees 4 docs
  • 146 Parkgate Avenue, Belfast, BT4 1JD

    LA04/2026/0420/DC Submitted 4 Mar 2026 12m away

    Discharge Condition 13 of LA04/2022/0118/F - Waste Management Plan

    Decided Conditions 4 docs
  • 117 Park Avenue, Belfast, BT4 1JJ

    LA04/2025/2208/F Submitted 19 Dec 2025 153m away

    Single storey extension to the rear and side, including demolition of single-storey return and relocation of side vehicular access gate.

    Granted Full applications Extension Demolition 12 docs
    Small domestic
  • 103 Park Avenue, Belfast, BT4 1JJ

    LA04/2026/1203/F Submitted 26 Jun 2026 197m away

    Change of use from dwelling house to 6 bed, 6 person House in Multiple Occupancy (HMO)

    Granted Full applications 15 docs
    Domestic
  • The Oval, Parkgate Drive, Belfast, BT4 1EW

    LA04/2023/3230/F Submitted 12 May 2023 345m away

    98% historically approved · decision due ~8 Aug

    Proposed replacement of existing natural grass pitch with new synthetic 3G surface and associated drainage

    Awaiting decision Full applications 25 docs
  • 156-158 Connsbrook Avenue, Strandtown, Belfast,BT4 1JX

    LA04/2024/1357/A Submitted 7 Aug 2024 380m away

    1 Shop sign, 1 Projecting sign, 4 Other - Wall Mounted Info Signs

    Granted Advertising 13 docs

In Belfast

  • 42 Circular Road, Belfast, BT4 2GA

    Non material change to LA04/2023/4203/F relating to: 1. Size and material of rear carport/balcony changed 2. Design of front elevation bay window changed 3. Change of roof type to kitchen roof 3. Removal of brick materials to render. 4. Addition of window to both side elevations.

    17 Dec 2025 Amendments
  • Lands at Cabin Hill, Upper Newtownards Road, Belfast BT4

    NMC to LA04/2024/0015/F: Removal of tree T140 and hedge group G134 to ensure visibility splays are unobstructed, and the addition of compensatory planting

    23 Jun 2026 Amendments
  • Lands at Cabin Hill, Upper Newtownards Road, Belfast.

    Amendment to condition No.13 of LA04/2024/0015/F to reflect updated Tree Impact and Protection Plan.

    6 Jul 2026 Amendments
  • 1 Willesden Park, Belfast, BT9 5GX

    Non Material Change to LA04/2024/0342/F: Addition of matching ground floor high level obscure window to match that already previously approved to elevation to provide improved symmetry to elevation and light to internal of extension.

    3 Jul 2026 Amendments
  • LA04/2026/1391/NMC Awaiting decision

    Land at Kings Hall and RUAS site south of Upper Lisburn Road/Balmoral Avenue, West of Harberton Park and North East of Balmoral Golf Club Belfast BT9 6GW

    Amendments to the approved façade treatment, including revisions to the arrangement and detailing of architectural fins, mesh panels and associated elevational components to the approved multi-storey car park.

    4 Aug 2026 Amendments