Skip to content
PlanIndex Get alerts
Menu

Planning application

Ground Floor Flat 44A Elm Park Road London N3 1EB

Awaiting decision Barnet 25/4873/FUL Full Application

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Erection of a replacement summer house

As published by the council, reference 25/4873/FUL

Application record

Reference
25/4873/FUL
Type
Full Application
Status
Pending Consideration
Received
4 Dec 2025
Validated
8 Dec 2025
Ward
Finchley Church End
Postcode
N3 1EB

Timeline

Dates from the published record

  1. 4 Dec 2025

    Received by Barnet

  2. 8 Dec 2025

    Validated

    Checked as complete and ready for consideration.

  3. 10 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 2 February 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Barnet took a median of 43 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Barnet for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 37C Elm Park Road London N3 1EG

    26/2262/RCU Submitted 17 Jun 2026 58m away

    79% historically approved · decision due ~12 Aug

    Installation of 2no. obscured-glazed bathroom windows to side elevation (Retrospective Application)

    Awaiting decision Windows or glazing
  • 47 And 49 Elm Park Road London N3 1EG

    25/3470/FUL Submitted 21 Aug 2025 59m away

    Single storey side extension with 1no. rooflight to no. 47. Single storey side and rear extension with 4no. rooflights to no. 49

    Granted Full applications Extension Loft or dormer 12 docs
    Small domestic
  • Flat 1 2 Dollis Road London N3 1RG

    26/1946/FUL Submitted 26 May 2026 148m away

    60% historically approved · decision due ~21 Jul

    Erection of a garden shed. Erection of timber fence

    Awaiting decision Full applications 8 docs
    Small domestic
  • Land Adjacent To Railway Viaduct Links View London N3 1RN

    TPP/0118/26 Submitted 26 Feb 2026 203m away

    86% historically approved · decision due ~23 Apr

    1 x Ash (applicants ref. T1) - Height 16m, spread 14m. Reduction of 2 metres. Standing in Area A1 of Tree Preservation Order.

    Awaiting decision Trees 3 docs
  • Flat 1 2 Dollis Road London N3 1RG

    26/1140/FUL Submitted 25 Mar 2026 219m away

    Erection of a garden shed

    Granted Full applications 9 docs
    Small domestic
  • 50 Lansdowne Road London N3 1ES

    26/1592/HSE Submitted 28 Apr 2026 246m away

    77% historically approved · decision due ~23 Jun

    Erection of a rear outbuilding with 3no. rooflights

    Awaiting decision Householder Loft or dormer 11 docs
    Small domestic

In Barnet

  • 26/3239/FUL Awaiting decision

    Henley Court Watford Way London NW4 4SR

    Construction of additional floor to provide 7no. self-contained flats. Construction of two storey side extension with rooms in the roofspace to provide 2no. self-contained flats. Associated refuse storage

    4 Sep 2026 Full applications
  • 26/3238/FUL Awaiting decision

    2 North End Road London NW11 7PH

    New shopfront with double glazed front folding doors

    4 Sep 2026 Full applications
  • 26/3230/FUL Awaiting decision

    50 Ballards Lane London N3 2DP

    Installation of a kitchen extract ventilation system within existing commercial unit on ground floor and flat roof with a discharge flue fixed to the rear elevation, together with associated internal alterations

    3 Sep 2026 Full applications
  • 26/3199/FUL Awaiting decision

    494 Finchley Road London NW11 8DE

    Demolition of the existing dwelling and erection of a two storey building over basement car park with rooms in the roofspace to provide 6no. self-contained residential dwellings. Associated amenity space, cycle stores and refuse/recycling storage

    1 Sep 2026 Full applications
  • 26/3200/FUL Awaiting decision

    289 Regents Park Road London N3 3JY

    Removal of front extension. Single storey side extension including new walls to replace existing boundary fences. (Part Retrospective)

    1 Sep 2026 Full applications