Skip to content
PlanIndex Get alerts
Menu

Planning application

47 And 49 Elm Park Road London N3 1EG

Granted Barnet 25/3470/FUL Full Application

Works: Extension Loft or dormer Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Single storey side extension with 1no. rooflight to no. 47. Single storey side and rear extension with 4no. rooflights to no. 49

As published by the council, reference 25/3470/FUL

Application record

Reference
25/3470/FUL
Type
Full Application
Status
Approved subject to conditions
Decision
Approve subject to conditions
Received
21 Aug 2025
Validated
26 Aug 2025
Decided
8 Oct 2025
Ward
Finchley Church End
Decision by
Delegated Decision
Postcode
N3 1EG

Timeline

Dates from the published record

  1. 21 Aug 2025

    Received by Barnet

  2. 26 Aug 2025

    Validated

    Checked as complete and ready for consideration.

  3. 8 Oct 2025

    Decision issued: Approve subject to conditions

  4. 10 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, an architecture practice registered in Harpenden

8 applications on PlanIndex · across 3 councils

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

12 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 37C Elm Park Road London N3 1EG

    26/2262/RCU Submitted 17 Jun 2026 45m away

    79% historically approved · decision due ~12 Aug

    Installation of 2no. obscured-glazed bathroom windows to side elevation (Retrospective Application)

    Awaiting decision Windows or glazing
  • Ground Floor Flat 44A Elm Park Road London N3 1EB

    25/4873/FUL Submitted 4 Dec 2025 59m away

    60% historically approved · decision due ~2 Feb

    Erection of a replacement summer house

    Awaiting decision Full applications 7 docs
  • Flat 1 2 Dollis Road London N3 1RG

    26/1946/FUL Submitted 26 May 2026 101m away

    60% historically approved · decision due ~21 Jul

    Erection of a garden shed. Erection of timber fence

    Awaiting decision Full applications 8 docs
    Small domestic
  • Land Adjacent To Railway Viaduct Links View London N3 1RN

    TPP/0118/26 Submitted 26 Feb 2026 162m away

    86% historically approved · decision due ~23 Apr

    1 x Ash (applicants ref. T1) - Height 16m, spread 14m. Reduction of 2 metres. Standing in Area A1 of Tree Preservation Order.

    Awaiting decision Trees 3 docs
  • Flat 1 2 Dollis Road London N3 1RG

    26/1140/FUL Submitted 25 Mar 2026 193m away

    Erection of a garden shed

    Granted Full applications 9 docs
    Small domestic
  • 54A Dollis Park London N3 1BS

    26/2433/RCU Submitted 26 Jun 2026 235m away

    79% historically approved · decision due ~21 Aug

    Single storey front extension (Retrospective Application)

    Awaiting decision Extension
    Small domestic

In Barnet

  • 26/3239/FUL Awaiting decision

    Henley Court Watford Way London NW4 4SR

    Construction of additional floor to provide 7no. self-contained flats. Construction of two storey side extension with rooms in the roofspace to provide 2no. self-contained flats. Associated refuse storage

    4 Sep 2026 Full applications
  • 26/3238/FUL Awaiting decision

    2 North End Road London NW11 7PH

    New shopfront with double glazed front folding doors

    4 Sep 2026 Full applications
  • 26/3230/FUL Awaiting decision

    50 Ballards Lane London N3 2DP

    Installation of a kitchen extract ventilation system within existing commercial unit on ground floor and flat roof with a discharge flue fixed to the rear elevation, together with associated internal alterations

    3 Sep 2026 Full applications
  • 26/3199/FUL Awaiting decision

    494 Finchley Road London NW11 8DE

    Demolition of the existing dwelling and erection of a two storey building over basement car park with rooms in the roofspace to provide 6no. self-contained residential dwellings. Associated amenity space, cycle stores and refuse/recycling storage

    1 Sep 2026 Full applications
  • 26/3200/FUL Awaiting decision

    289 Regents Park Road London N3 3JY

    Removal of front extension. Single storey side extension including new walls to replace existing boundary fences. (Part Retrospective)

    1 Sep 2026 Full applications