Skip to content
PlanIndex Get alerts
Menu

Planning application

Land To The East Of Ely Road Barham Suffolk

Awaiting decision Babergh DC/26/03281 Discharge of Condition(s)

Relates to DC/22/06117

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Discharge of Conditions Application for DC/22/06117 - Condition 18 (Residents Travel Pack) and 23 (Sustainable Urban Drainage System) Condition 18 Residents' Travel Pack Condition 23 SUDS approved drawings

As published by the council, reference DC/26/03281

Application record

Reference
DC/26/03281
Type
Discharge of Condition(s)
Status
Awaiting decision
Received
30 Jul 2026
Validated
30 Jul 2026
Ward
Claydon & Barham
Parish
Barham

Site history

Applications at this address on the Babergh register

This site has had 5 applications since 2025: 0 approved, 2 refused.

  • DC/26/03798 Awaiting decision

    Land To The East Of Ely Road Barham Suffolk

    Discharge of Conditions Application for DC/22/06117 - Discharge of Conditions 5 (Advance Planting), 6 (Landscape Management), 7 (Hard and Soft Landscaping), 9 (Open Space and Play Space), 19 (Fire Hydrants), 28 (Ecology Mitigation and Enhancement Measures), 30 (Landscape and Ecological Management Plan), 31 (Lighting Design Scheme for Biodiversity) and 32 (SPA and Ramsar Site)

    Submitted 2 Sep 2026 Conditions
  • DC/26/03617 Awaiting decision

    Land To The East Of Ely Road Barham Suffolk

    Discharge of Conditions Application for DC/22/01274 - Condition 5 (Plot 53 Landscaping)

    Submitted 20 Aug 2026 Conditions
  • DC/25/04919 Refused

    Land To The East Of Ely Road Barham Suffolk

    Discharge of Conditions Application for DC/22/06117 - Condition 5 (Advance Planting), Condition 6 (Landscape Management), Condition 7 (Hard and Soft Landscaping)

    Decided 2 Feb 2026 Conditions
  • DC/25/04918 Refused

    Land To The East Of Ely Road Barham Suffolk

    Discharge of Condition Application for DC/22/01274 - Condition 5 (Plot 53 Landscaping)

    Decided 30 Jan 2026 Conditions

Timeline

Dates from the published record

  1. 30 Jul 2026

    Received by Babergh

  2. 2 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 24 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Babergh took a median of 49 days over the applications it decided in the last year.

Cases linked to this one on the register

  • DC/22/06117 Granted

    Land To The East Of Ely Road Claydon Suffolk

    Application under Section 73 of the Town and Country Planning Act 1990 - Variation of Condition 37 (Market Housing Mix) of planning permission DC/18/00861 Dated: 23/04/2021 - Outline Planning Application (with means of access to be considered) - Erection of up to 67 dwellings, public open space and supporting site infrastructure includ+ing access.

    Decided 2 Oct 2024 Conditions

Who's behind it

Company information only, from the register and Companies House

Ingleton Wood LLP Agent, registered in London

Active · incorporated 2004 · London

256 applications on PlanIndex · across 36 councils · 97% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Aspen Build Ltd Applicant, registered in Manchester

Dissolved · incorporated 2005 · Manchester

2 applications on PlanIndex · across 2 councils

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

29 documents on file for this application

  • TRAVEL PLAN RESPONSE Consultee Comment · 19 Aug 2026
  • FLOOD AND WATER RESPONSE Consultee Comment · 12 Aug 2026
  • APPLICATION FORM Application Form · 30 Jul 2026
  • RESIDENTS TRAVEL PACK - ELY ROAD FINAL Additional Information · 30 Jul 2026
  • HOME USER GUIDE - ELY ROAD Additional Information · 30 Jul 2026
  • 231349_C-0402_ C02 (S38 ADOPTABLE HIGHWAY DETAILS SHEET 2) Drawing · 30 Jul 2026
  • 231349_C-0403_ C01 (S38 ADOPTABLE HIGHWAY DETAILS SHEET 3) Drawing · 30 Jul 2026
  • 231349_C-0404_ C01 (S38 ADOPTABLE HIGHWAY DETAILS SHEET 4) Drawing · 30 Jul 2026
  • 231349_C-0401_ C01 (S38 ADOPTABLE HIGHWAY DETAILS SHEET 1) Drawing · 30 Jul 2026
  • 231349_C-0254 C01 (ROAD AND SEWER LONGSECTIONS SHEET 4) Drawing · 30 Jul 2026
  • 231349_C-0255 C01 (ROAD AND SEWER LONGSECTIONS SHEET 5) Drawing · 30 Jul 2026
  • 231349_C-0256 C01 (ROAD AND SEWER LONGSECTIONS SHEET 6) Drawing · 30 Jul 2026
  • 231349_C-0257 C01 (ROAD AND SEWER LONGSECTIONS SHEET 7) Drawing · 30 Jul 2026
  • 231349_C-0251 C01 (ROAD AND SEWER LONGSECTIONS SHEET 1) Drawing · 30 Jul 2026
  • 231349_C-0252 C01 (ROAD AND SEWER LONGSECTIONS SHEET 2) Drawing · 30 Jul 2026
  • 231349_C-0253 C01 (ROAD AND SEWER LONGSECTIONS SHEET 3) Drawing · 30 Jul 2026
  • 231349_C-0182_C01 (S104 DCG DETAILS SHEET 2) Drawing · 30 Jul 2026
  • 231349_C-0183_C01 (S104 DCG DETAILS SHEET 3) Drawing · 30 Jul 2026
  • 231349_C-0184_C01 (S104 DCG DETAILS SHEET 4) Drawing · 30 Jul 2026
  • 231349_C-0185 C01 (S104 DCG DETAILS SHEET 5) Drawing · 30 Jul 2026
  • 231349_C-0181_C01 (S104 DCG DETAILS SHEET 1) Drawing · 30 Jul 2026
  • 231349_C-0155 C04 (S38 SURFACING AND KERBING PLAN SHEET 2) Drawing · 30 Jul 2026
  • 231349_C-0158 C01 (CBR PLAN) Drawing · 30 Jul 2026
  • S104 AGREEMENT PLAN 231349_C-0170 C02 (S104 PLAN) Drawing · 30 Jul 2026
  • 231349_C-0151 C03 (S38 PINK PLAN) Drawing · 30 Jul 2026
  • 231349_C-0152 C04 (S38 COLOUR PLAN) Drawing · 30 Jul 2026
  • 231349_C-0153 C01 (S38 CONTOUR PLAN) Drawing · 30 Jul 2026
  • 231349_C-0154 C04 (S38 SURFACING AND KERBING PLAN SHEET 1) Drawing · 30 Jul 2026
  • COVERING LETTER Additional Information · 30 Jul 2026

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Babergh for determination, against a statutory target of eight weeks. Over the last year Babergh decided condition discharge and variation applications in a median of 46 days. More in our guide to how long planning decisions take.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Land To The East Of Ely Road Barham Suffolk

    DC/26/03798 Submitted 2 Sep 2026 0m away

    95% historically approved · decision due ~30 Oct

    Discharge of Conditions Application for DC/22/06117 - Discharge of Conditions 5 (Advance Planting), 6 (Landscape Management), 7 (Hard and Soft Landscaping), 9 (Open Space and Play Space), 19 (Fire Hydrants), 28 (Ecology Mitigation and Enhancement Measures), 30 (Landscape and Ecological Management Plan), 31 (Lighting Design Scheme for Biodiversity) and 32 (SPA and Ramsar Site)

    Awaiting decision Conditions 21 docs
  • Land To The East Of Ely Road Barham Suffolk

    DC/25/04919 Submitted 6 Nov 2025 0m away

    Discharge of Conditions Application for DC/22/06117 - Condition 5 (Advance Planting), Condition 6 (Landscape Management), Condition 7 (Hard and Soft Landscaping)

    Refused Conditions 14 docs
  • Land To The East Of Ely Road Barham Suffolk

    DC/25/04918 Submitted 6 Nov 2025 0m away

    Discharge of Condition Application for DC/22/01274 - Condition 5 (Plot 53 Landscaping)

    Refused Conditions 6 docs
  • Land To The East Of Ely Road Barham Suffolk

    DC/26/03617 Submitted 20 Aug 2026 0m away

    95% historically approved · decision due ~15 Oct

    Discharge of Conditions Application for DC/22/01274 - Condition 5 (Plot 53 Landscaping)

    Awaiting decision Conditions 7 docs
  • Land To The East Of Ely Road Barham Suffolk

    DC/26/03281 Submitted 30 Jul 2026 0m away

    95% historically approved · decision due ~24 Sep

    Discharge of Conditions Application for DC/22/06117 - Condition 18 (Residents Travel Pack) and 23 (Sustainable Urban Drainage System) Condition 18 Residents' Travel Pack Condition 23 SUDS approved drawings

    Awaiting decision Conditions 29 docs
  • Land To The East Of Ely Road Claydon Suffolk

    DC/22/06117 Submitted 9 Dec 2022 0m away

    Application under Section 73 of the Town and Country Planning Act 1990 - Variation of Condition 37 (Market Housing Mix) of planning permission DC/18/00861 Dated: 23/04/2021 - Outline Planning Application (with means of access to be considered) - Erection of up to 67 dwellings, public open space and supporting site infrastructure includ+ing access.

    Granted Conditions 8 docs
    Major scheme

In Babergh

  • DC/26/02932 Granted

    Rectory Cottage Old Rectory Lane Shimpling Bury St Edmunds Suffolk IP29 4HQ

    Discharge of Conditions Application for DC/24/04287 - Condition 5 (Biodiversity Enhancement Strategy), Condition 8 (Foul Drainage Scheme), Condition 12 (Electric Vehicle Charging), Condition 13 (Refuse Storage Details), Condition 14 (Cycle Storage), Condition 16 (Soft Landscaping Scheme), Condition 18 (Landscape and Ecological Management Plan)

    8 Jul 2026 Conditions
  • DC/26/02619 Granted

    5, 7, 11 And 15-21 (odd) Pightle Grove, Rattlesden, Bury St Edmunds, Suffolk, IP30 0T

    Confirmation of Compliance with Conditions for DC/19/03840 and DC/18/00229

    15 Jun 2026 Conditions
  • DC/26/03967 Awaiting decision

    Unit 9 Crowcroft Road Industrial Estate Nedging With Naughton Ipswich Suffolk IP7 7HR

    Discharge of Conditions Application for DC/26/01829 - Condition 6 (Construction Management Plan)

    11 Sep 2026 Conditions
  • DC/26/03966 Awaiting decision

    Hadleigh High School Highlands Road Hadleigh Ipswich Suffolk IP7 5HU

    Discharge of Conditions Application for DC/26/00385 - Conditions 10 (Biodiversity Enhancement Strategy), 11 (Wildlife Sensitive Lighting Design Scheme), 13 (Hard and Soft landscaping Scheme ), 14 (Landscape Management Plan), 16 (Design Details of The MUGA), 19 (Design Specification of the Sports Hall) and 27 (Parking Details)

    11 Sep 2026 Conditions
  • DC/26/03971 Awaiting decision

    The Homestead The Street Brome And Oakley Eye Suffolk IP23 8AE

    Discharge of Conditions Application for DC/26/00687 - Condition 6 (Biodiversity Enhancement Layout)

    11 Sep 2026 Conditions