Skip to content
PlanIndex Get alerts
Menu

Planning application

Church Barton House Horns Lane Pagham PO21 4NZ

Awaiting decision Arun P/126/26/CLE Lawful development

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Lawful development certificate for the existing operational development comprising the excavation of a trench and installation of foul drainage infrastructure pursuant to outline planning permission P/25/17/OUT.

As published by the council, reference P/126/26/CLE

Application record

Reference
P/126/26/CLE
Category
Lawful development
Status
Undecided
Received
11 Sep 2026
Validated
14 Sep 2026
Parish
Pagham
Postcode
PO21 4NZ

Site history

Applications at this address on the Arun register

This site has had 8 applications since 2023: 1 approved, 4 refused.

  • P/2/26/DOC Refused

    Church Barton House Horns Lane Pagham PO21 4NZ

    Approval of details reserved by condition imposed under P/25/17/OUT relating to conditions 10-surface water drainage, 11-maintenance and management of surface water drainage system and 29-existing and proposed ground levels, proposed finished floor levels, levels of any paths, drives, garages and parking areas.

    Decided 12 Aug 2026 Conditions
  • P/175/25/DOC Refused

    Church Barton House Horns Lane Pagham PO21 4NZ

    Approval of details reserved by condition imposed under P/139/22/RES relating to condition 6-Mitigation Landscape Phasing Plan.

    Decided 12 Aug 2026 Conditions
  • P/173/25/DOC Refused

    Church Barton House Horns Lane Pagham PO21 4NZ

    Approval of details reserved by condition imposed under P/25/17/OUT relating to conditions 4-detailed phasing for dwellings, highways and public areas, 5-schedule of materials and finishes, 20-Employment and Skills Plan and 22-energy conservation.

    Decided 12 Aug 2026 Conditions
  • P/161/25/DOC Refused

    Church Barton House Horns Lane Pagham PO21 4NZ

    Approval of details reserved by condition imposed under P/25/17/OUT relating to conditions 17-Construction Management Plan and 27-management and maintenance scheme for the adjacent Pagham Harbour SPA.

    Decided 12 Aug 2026 Conditions
  • P/127/25/DOC Decided

    Church Barton House Horns Lane Pagham PO21 4NZ

    Approval of details reserved by condition imposed under P/25/17/OUT relating to conditions 4-Construction Phasing Scheme, 5-Materials Schedule, 9-Arboricultural Method Statement, 15-Ecological Management and Mitigation Plan, 20-Employment and Skills Plan, 22-Renewable Energy, 23-Broadband Provision and 26-Electrical Vehicle Charging.

    Decided 27 Nov 2025 Conditions
  • P/126/25/DOC Withdrawn

    Church Barton House Horns Lane Pagham PO21 4NZ

    Approval of details reserved by condition imposed under P/139/22/RES relating to condition 6-Mitigation Landscape Phasing Plan.

    Decided 10 Nov 2025 Conditions
  • P/48/23/NMA Granted

    Church Barton House Horns Lane Pagham PO21 4NZ

    Non-material amendment following grant of P/25/17/OUT relating to rewording of Condition 28 regarding m4(2) and m4(3) dwellings.

    Decided 10 May 2023 Amendments

Timeline

Dates from the published record

  1. 11 Sep 2026

    Received by Arun

  2. 14 Sep 2026

    Validated

    Checked as complete and ready for consideration.

  3. 17 Sep 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 9 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Arun took a median of 55 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Domusea Pagham Ltd St Johns House St Johns Street Chichester PO19 1UU Agent and applicant

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

What happens while it is decided

This application is with Arun for determination, against a statutory target of eight weeks. Over the last year Arun decided lawful development applications in a median of 48 days. More in our guide to how long planning decisions take.

About lawful development applications

A lawful development certificate is a legal determination that existing or proposed works do not need planning permission; the merits of the scheme are not considered. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Church Barton House Horns Lane Pagham PO21 4NZ

    P/127/25/DOC Submitted 1 Oct 2025 0m away

    Approval of details reserved by condition imposed under P/25/17/OUT relating to conditions 4-Construction Phasing Scheme, 5-Materials Schedule, 9-Arboricultural Method Statement, 15-Ecological Management and Mitigation Plan, 20-Employment and Skills Plan, 22-Renewable Energy, 23-Broadband Provision and 26-Electrical Vehicle Charging.

    Decided Conditions
  • Church Barton House Horns Lane Pagham PO21 4NZ

    P/161/25/DOC Submitted 1 Dec 2025 2m away

    Approval of details reserved by condition imposed under P/25/17/OUT relating to conditions 17-Construction Management Plan and 27-management and maintenance scheme for the adjacent Pagham Harbour SPA.

    Refused Conditions
  • Church Barton House Horns Lane Pagham PO21 4NZ

    P/48/23/NMA Submitted 13 Apr 2023 2m away

    Non-material amendment following grant of P/25/17/OUT relating to rewording of Condition 28 regarding m4(2) and m4(3) dwellings.

    Granted Amendments
    Several homes
  • Church Barton House Horns Lane Pagham PO21 4NZ

    P/126/25/DOC Submitted 30 Sep 2025 2m away

    Approval of details reserved by condition imposed under P/139/22/RES relating to condition 6-Mitigation Landscape Phasing Plan.

    Withdrawn Conditions
  • Church Barton House Horns Lane Pagham PO21 4NZ

    P/2/26/DOC Submitted 12 Jan 2026 2m away

    Approval of details reserved by condition imposed under P/25/17/OUT relating to conditions 10-surface water drainage, 11-maintenance and management of surface water drainage system and 29-existing and proposed ground levels, proposed finished floor levels, levels of any paths, drives, garages and parking areas.

    Refused Conditions
  • Church Barton House Horns Lane Pagham PO21 4NZ

    P/175/25/DOC Submitted 24 Dec 2025 2m away

    Approval of details reserved by condition imposed under P/139/22/RES relating to condition 6-Mitigation Landscape Phasing Plan.

    Refused Conditions

In Arun

  • BN/85/26/CLP Awaiting decision

    5 Tattersalls Road Fontwell BN18 0ZA

    Application for certificate of lawfulness for a proposed outbuilding within the rear curtilage of the property.

    21 Jul 2026 Lawful development
  • R/136/26/CLP Awaiting decision

    1 Amberley Road Rustington BN16 2EE

    Lawful development certificate for the proposed bricking up of existing garage roll up door and insert a double glazed window, insert French doors to replace current window to the side of the garage, replace existing roof tiles and damp proof.

    11 Sep 2026 Lawful development
  • FG/67/26/CLP Awaiting decision

    74 Langbury Lane Ferring BN12 6QA

    Application for certificate of lawfulness for a proposed double hip to gable loft conversion with rear dormer.

    20 Jul 2026 Lawful development
  • FG/66/26/CLP Awaiting decision

    45 Ferring Lane Ferring BN12 6QT

    Application for certificate of lawfulness for a proposed single-storey extension.

    15 Jul 2026 Lawful development
  • BR/124/26/CLP Withdrawn

    19 Crescent Road Bognor Regis PO21 1QG

    Application for certificate of lawfulness for a proposed single storey side extension and loft extension with rear dormer.

    10 Jul 2026 Lawful development