Skip to content
PlanIndex Get alerts
Menu

Planning application

Lands adjacent to and 15m South of 1 Callan Bank, Armagh BT60 4BZ

Awaiting decision Armagh City, Banbridge and Craigavon LA08/2026/0925/NMC Non Material Change

Works: Windows or glazing

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Addition of a first floor bedroom space over the ground floor sun lounge. Removal of window to first floor landing to accommodate the additional bedroom.

As published by the council, reference LA08/2026/0925/NMC

Application record

Reference
LA08/2026/0925/NMC
Type
Non Material Change
Status
Valid
Received
25 Aug 2026
Validated
25 Aug 2026
Ward
Cathedral (Armagh,Banbridge & Craigavon)
Postcode
BT60 4BZ

Timeline

Dates from the published record

  1. 25 Aug 2026

    Received by Armagh City, Banbridge and Craigavon

  2. 9 Sep 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 20 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Armagh City, Banbridge and Craigavon took a median of 105 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

McAleenan Architects + Interior Design Ltd Agent, an architecture practice registered in Armagh

Active · incorporated 2014 · Armagh

24 applications on PlanIndex · across 4 councils · 100% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

4 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Armagh City, Banbridge and Craigavon for determination, against a statutory target of eight weeks. Over the last year Armagh City, Banbridge and Craigavon decided amendment applications in a median of 62 days. More in our guide to how long planning decisions take.

About amendment applications

An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 72 Cathedral Road, Armagh, BT61 8AG

    LA08/2025/1156/F Submitted 29 Sep 2025 120m away

    Change of use from existing store (Use Class B4) to a Wellness Centre (Sui Generis), alterations to NW facing elevation and addition of a plant room

    Granted Full applications 27 docs
  • 113 Cathedral Road, Armagh, BT61 8AQ

    LA08/2025/1513/F Submitted 4 Dec 2025 282m away

    Erection of single storey extension to side and rear and two storey extension to rear of existing dwelling, single storey standalone home gym building in rear garden with associated site works and landscaping

    Granted Full applications Extension 16 docs
    Small domestic
  • 10b Nursery Road, Armagh, BT60 4BL

    LA08/2025/0176/F Submitted 12 Feb 2025 408m away

    97% historically approved · decision due ~14 Apr

    Erection of Class B3: General industrial buildings (replacement of existing sheds) to include all associated site works

    Awaiting decision Full applications 35 docs

In Armagh City, Banbridge and Craigavon

  • LA08/2026/0947/NMC Awaiting decision

    Land immediately south-east of Nos. 9-19 Kensington Manor, BT66 7HR and 40m north-west of No. 8 Taughrane Hall, Dollingstown, BT66 7XU (with access from Inn Road Manor)

    Amendment to boundary treatments at plots 27, 32-34 to revise approved privacy walls to 1.8m solid boarded privacy fence with hedging planted to roadside

    27 Aug 2026 Amendments
  • Upon lands adjacent to and north of No. 9 Umgola Road Drumarg Or Downs Co Armagh N.Ireland to lands adjacent to and South-West of No. 3 Umgola Road Drumarg Or Downs Co Armagh N.Ireland BT60 4DJ

    Non material change to application LA08/2018/1268/F - amendments to external finishes for rear and side elevations of sites 03,04,05,06,07,08,09,10,11,12,14,15,16 &17

    23 Jun 2026 Amendments
  • LA08/2026/0911/NMC Awaiting decision

    7-9 Dromore Street, Rathfriland, BT34 5LU

    Minor plan alterations on ground floor, omission of first floor and changes to roof finish

    20 Aug 2026 Amendments
  • Lands 60m East of No. 25 Dungannon Road, Portadown and adjacent to and east of nos.54, 56, 58 and 64 The Spires, Portadown and north of and adjacent to no.21 Dungannon Road, Portadown (with access through The Spires)

    Minor amendments to site layout at sites 162- 168.

    10 Jul 2026 Amendments
  • Sites 124 - 131 (planning reference: LA08/2025/0150/F) on lands immediately adjacent and NE of Dh, 126 Victoria Street, Lurgan BT67 9DA and 35m SW of 1 Levin Road, Lurgan, Craigavon BT67 9EU

    Proposed minor alterations to fenestration, flat canopy over front doors to provide 600mm cover as per DPG guidelines and internal layout alterations to satisfy housing association requirements.

    22 May 2026 Amendments