Skip to content
PlanIndex Get alerts
Menu

Planning application

113 Cathedral Road, Armagh, BT61 8AQ

Granted Armagh City, Banbridge and Craigavon LA08/2025/1513/F Full

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of single storey extension to side and rear and two storey extension to rear of existing dwelling, single storey standalone home gym building in rear garden with associated site works and landscaping

As published by the council, reference LA08/2025/1513/F

Application record

Reference
LA08/2025/1513/F
Type
Full
Status
Determined
Decision
Granted
Received
4 Dec 2025
Validated
23 Dec 2025
Decided
22 May 2026
Ward
Cathedral (Armagh,Banbridge & Craigavon)
Postcode
BT61 8AQ

Timeline

Dates from the published record

  1. 4 Dec 2025

    Received by Armagh City, Banbridge and Craigavon

  2. 23 Dec 2025

    Validated

    Checked as complete and ready for consideration.

  3. 22 May 2026

    Decision issued: Granted

  4. 29 Jul 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

McAleenan Architects + Interior Design Ltd Agent, an architecture practice registered in Armagh

Active · incorporated 2014 · Armagh

24 applications on PlanIndex · across 4 councils · 100% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

16 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Armagh City, Banbridge and Craigavon granted permission on 22 May 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 72 Cathedral Road, Armagh, BT61 8AG

    LA08/2025/1156/F Submitted 29 Sep 2025 185m away

    Change of use from existing store (Use Class B4) to a Wellness Centre (Sui Generis), alterations to NW facing elevation and addition of a plant room

    Granted Full applications 27 docs
  • Lands adjacent to and 15m South of 1 Callan Bank, Armagh BT60 4BZ

    LA08/2026/0925/NMC Submitted 25 Aug 2026 282m away

    85% historically approved · decision due ~20 Oct

    Addition of a first floor bedroom space over the ground floor sun lounge. Removal of window to first floor landing to accommodate the additional bedroom.

    Awaiting decision Amendments Windows or glazing 4 docs
  • 100 Cathedral Road, Armagh, BT61 8AE

    LA08/2026/0558/F Submitted 21 May 2026 410m away

    97% historically approved · decision due ~28 Jul

    The construction of a single storey extension to provide an additional equine treatment room.

    Awaiting decision Full applications Extension 13 docs
    Small domestic

In Armagh City, Banbridge and Craigavon

  • 1 Ballynafern Road, Banbridge, BT32 5AE

    Proposed re-roofing of thatched roof with slate

    Received 26 Aug, published by the council 29 Jul 2026 Full applications
  • 236 Banbridge Road, Lawrencetown, BT63 6DW

    Conversion and reconfiguration of lawful existing ground floor retail unit (sale of fireplaces, stoves and associated accessories) to provide extension to existing dwelling and demolition of lawful retail buildings (sale of fireplaces, stoves and associated accessories) and separate brick shed. Conversion, reconfiguration and extension to existing building to accommodate the relocation of existing and proposed lawful retail floorspace for the sale of fireplaces, stoves and associated accessories and provision of ancillary storage, car parking, landscaping and all associated site works’.

    Received 9 May, published by the council 7 Aug 2026 Full applications
  • Lands within the grounds of Clady GAC, 65 Clady Road, Mowhan, Armagh, BT60 2HA

    Erection of changing pavilion incorporating 2 team changing rooms plus accessible changing, meeting room and gym/multi-activity area (existing changing pavilion & storage room to be retained), erection of new entrance wall and gates and associated site works (in substitution for planning approval reference no LA08/2022/1238/F)

    Received 19 Feb, published by the council 29 Jul 2026 Full applications
  • 5 Drummiller Lane, Craigavon, BT63 6BR

    Partial demolition of existing single-storey front block, rebuilding with reduced floor area, and associated alterations to the existing property.

    Received 13 Mar, published by the council 29 Jul 2026 Full applications
  • 25 metres SE of entrance/exit to Tesco Extra building, Tesco Extra, Bridgewater Retail Park, Banbridge, BT32 4LF

    Erection of Timpson pod (for dry cleaning, shoe repair, key cutting, jewellery repairs, watch repairs, engraving, etc. Dry cleaning will not be undertaken within the kiosk, items to be cleaned would be dropped off and collected at the kiosk) with steps for access and provision of 15 No 1m high bollards for protection and a pedestrian crossing and tactile pavement.

    Received 5 May, published by the council 29 Jul 2026 Full applications