Planning application

LA08/2026/0604/DC

Approximately 170m West of No. 98 Clonmore Road, Dungannon, BT71 6HX

Awaiting decision Armagh City, Banbridge and Craigavon Discharge of Condition

Proposal

An application to discharge Condition No. 7 of enforcement appeal decision 2022/E0057 Condition 7 states: Within three months of the date of this decision, a medium intensity, omnidirectional, night vision compatible, steady red obstacle light shall be installed at the highest point of the hub and shall be lit at all times for the lifespan of the turbine.

As published by the council, reference LA08/2026/0604/DC

Timeline

Dates from the published record

  1. 4 Jun 2026

    Received by Armagh City, Banbridge and Craigavon

  2. 29 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Armagh City, Banbridge and Craigavon for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About conditions applications

How this application type works

This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.

More on conditions applications in our guide

Nearby applications

Within 500 metres

  • LA08/2026/0606/DC Awaiting decision

    Approximately 170m West of No. 98 Clonmore Road, Dungannon, BT71 6HX

    An application to discharge Condition No. 1 of enforcement appeal decision 2022/E0057 Condition 1 states: Within three months of the date of this decision, software shall be installed into the control system of the turbine and retained thereafter for the lifespan of the turbine to limit the noise output to 100dB mode. Evidence that the 100dB mode has been implemented shall be submitted to the Council within three months of this decision for approval in writing.

    4 Jun 2026 4m away Conditions
  • LA08/2026/0605/DC Awaiting decision

    Approximately 170m West of No. 98 Clonmore Road, Dungannon, BT71 6HX

    An application to discharge Condition No. 4 of enforcement appeal decision 2022/E0057 Condition 4 states: Within three months of the date of this decision, software shall be installed into the control system of the turbine and retained thereafter for the lifespan of the turbine to ensure the effects of shadow flicker on any occupied property does not exceed the allowances set out in the Best Practice Guidance to PPS 18, that being not more than 30 hours per year or 30 minutes per day. Evidence that the shadow flicker mitigation software has been installed shall be submitted to the Council within three months of this decision for approval in writing.

    4 Jun 2026 4m away Conditions
  • LA08/2026/0603/DC Awaiting decision

    Approximately 170m West of No. 98 Clonmore Road, Dungannon, BT71 6HX

    An application to discharge Condition No. 8 of enforcement appeal decision 2022/E0057 Condition 8 states: Within three months of the date of this decision, the wind turbine blades shall be “feathered” when wind speeds are below the “cut-in speed” of the turbine and shall be retained as such for the lifespan of the turbine. This shall involve pitching the blades to 90 degrees and/or rotating the blades parallel to the wind direction to reduce the blade rotation speed below two revolutions per minute while idling.

    4 Jun 2026 4m away Conditions
  • LA08/2026/0066/F Awaiting decision

    Lands adjacent to and 80 metres north-west of 96 Clonmore Road, and adjacent to and 95 metres west of 98 Clonmore Road, Dungannon, BT71 6HX

    Erection of light industrial packaging (use class B2) and storage and distribution (use class B4) building and associated site works”.

    19 Jan 2026 98m away Full applications
  • Lands immediately adjacent and west of 114 Clonmore Road, Dungannon

    Erection of dwelling and garage (change of house type (siting) to that approved under M/2010/0015/F)

    19 Feb 2026 247m away Full applications
  • Lands adjacent to and east of No. 113 Clonmore Road, Clonmore, Dungannon, BT71 6HX

    Erection of 2 No. detached dwellings and associated site works

    10 Sep 2025 324m away Full applications

In Armagh City, Banbridge and Craigavon

  • Lands at No. 9 Derrinraw Road, Portadown, BT62 1UX

    Discharge of condition 8 of LA08/2024/1525/F which reads: A final Construction Environmental Management Plan (fCEMP) must be submitted within 8 weeks following the grant of planning permission. This shall include all necessary mitigation measures for the construction phase of the development as outlined in the oCEMP (Taggarts, May 2025) to avoid the egress of any polluting discharges to Lough Neagh and Lough Beg Ramsar site and Lough Neagh and Lough Beg SPA.

    22 May 2026 Conditions
  • Lands at 41 Mullavilly Road adjacent to and East of 38 and 39 Laurel heights East of 39 and 48 Laurel Drive West of 1-11 Rose Gardens and to the South of 5 14 and 16 Mullavilly Green Access is to be between No's 5 and 16 Mullavilly Green Laurelvale/Mullavilly, Tandragee BT62 2NT

    Discharge of condition 14 of LA08/2022/1173/O. Condition 14 states "No site works of any nature or development shall take place until a programme of archaeological work (POW) has been prepared by a qualified archaeologist, submitted by the applicant and approved in writing by the Council in consultation with Historic Environment Division, Department for Communities. The POW shall provide for: The identification and evaluation of archaeological remains within the site; Mitigation of the impacts of development through licensed excavation recording or by preservation of remains in-situ; Post-excavation analysis sufficient to prepare an archaeological report, to publication standard if necessary; and Preparation of the digital, documentary and material archive for deposition. Reason: to ensure that archaeological remains within the application site are properly identified, and protected or appropriately recorded."

    11 May 2026 Conditions
  • 45 High Street, Lurgan, BT66 8AH

    Discharge of condition 04 of LA08/2022/0819/LBC which reads: No work shall commence on the works until samples of all finish materials have been submitted to and agreed in writing with the Council in conjunction with HED and all works shall conform to the agreed samples. This includes, glazing, frames, roof finishes, rain water goods. Samples to be retained on site until completion of the works.

    4 Jun 2026 Conditions
  • Lands 52m north-west of nos. 48-50 Killycomain Road, 40m sout-east of nos. 26-32 Bachelors Avenue, 44m south of 16 and 18 Bachelors Avenue, Portadown (with access onto Killycomain Road)

    Discharge of condition 34 of LA08/2023/2031/F which reads: No development shall take place until a Wastewater Impact Assessment has been submitted to and approved in writing by the Council, in consultation with NI Water, with the Wastewater Impact Assessment demonstrating that the development can be served by the public sewerage system or that acceptable alternative provision for disposal of sewerage has been made. Any mitigation measures contained therein shall be implemented prior to the commencement of the development herby permitted, or in accordance with a programme to be submitted to and agreed in writing with the Council.

    14 May 2026 Conditions
  • 90 Collegelands Road, Charlemont, Dungannon BT71 6SW and lands to the Southeast

    Discharge of Condition number: 10 of LA08/2021/1346/F which reads: No development shall take place on-site until final details of the method of sewage disposal has been submitted to and agreed in writing by the Council and any mitigation measures contained therein shall be implemented prior to the occupation of any part of the development.

    8 May 2026 Conditions