Planning application

Northern Ireland Electricity Plc, Northern Ireland Electricity, 4 Annagh Drive, Craigavon, BT63 5QJ

Granted Armagh City, Banbridge and Craigavon LA08/2025/1287/DC Discharge of Condition

Works: Demolition

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Discharge of Condition No. 3 of LA08/2023/3029/F. Condition 3 was previously discharged (LA08/2024/1432/DC) The development hereby permitted shall not commence until either suitably informed risk assessments produced in accordance with LCRM guidance and/or a detailed remediation strategy for the underground fuel storage tank(s) and fuel dispensing infrastructure has been provided. The remediation strategy must be in line with current Guidance for Pollution prevention (GPP 2 and GPP 27) and the Pollution Prevention Guidance (PPG27). This strategy must be submitted in writing and agreed with the Planning Authority and should identify all the remedial objectives/criteria and the measures which are proposed to mitigate them (including maps/plans showing the remediation design, implementation plan detailing timetable of works, remedial criteria, monitoring program, etc). Reason: Protection of environmental receptors and human health to ensure the site is suitable for use. However the Contractor has proposed an alternative solution to the removal of the underground fuel tanks. Instead of removing the underground fuel tanks, as previously advised, the specialist subcontractor (Baltor Systems) has proposed the following alternative methodology: Diesel tank Decommissioning Draining of the existing suction lines, degassing and disconnection from the diesel pump. Disconnection of all mains cables from the 2No. Old Pumps and Fuel Management System, removal and disposal of same to facilitate the demolition of the old pump house. Removal of all pipework from the underground diesel tank and removal of tank lid to give access for cleaning and concrete foaming. Removal of all fuel residues and sludge from the underground tank, thoroughly washing same with vacuum tanker and degassing in preparation for concrete foaming. Darafil Concrete Foam Filling of tank (assumed to be 16,000 litres) with concrete foam, overflowing same into the manhole void and issuing a decommissioning certificate. Our Environmental Consultant's comments are as follows: From: Cove Environmental Consulting With regards to this issue, the retaining of the tanks on site – subject to the correct decommissioning works – would be an acceptable alternative to the removal of the tank. The remedial design report noted the tanks would be removed however the key element is the testing around and below the level of the tank itself, so if this is still carried out then we can validate the remediation of the tank – i.e. we will be able to show that there is no contamination present in the ground immediately around / below the tank and the source of any future contamination (the tank) has been dealt with. This can all be outlined in the validation report after the works are complete. If the intention is to retain the tank, then we would recommend that sampling is undertaken both before and after the decommissioning work – the “before” round will confirm that no contamination is present (as if it is then the tank may actually have to be removed to deal with it) and “after” to ensure that no contamination is caused by the remedial works themselves.

As published by the council, reference LA08/2025/1287/DC

Application record

Reference
LA08/2025/1287/DC
Type
Discharge of Condition
Status
Determined
Decision
Granted As published: Condition Discharged
Received
15 Oct 2025
Validated
15 Oct 2025
Decided
18 Mar 2026
Ward
Craigavon Centre
Postcode
BT63 5QJ

Timeline

Dates from the published record

  1. 15 Oct 2025

    Received by Armagh City, Banbridge and Craigavon

  2. 18 Mar 2026

    Decision issued: Condition Discharged

  3. 29 Jul 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

GM Design Associates Ltd Agent, a design practice

18 applications on PlanIndex · across 8 councils · 100% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

11 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Armagh City, Banbridge and Craigavon granted permission on 18 March 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In Armagh City, Banbridge and Craigavon

  • 100 CORNAKINNEGAR ROAD KILMORE LURGAN BT67 9JP

    Proposed discharge of condition 2 of planning approval LA08/2020/1280/F. Condition 2 states: No site works of any nature or development shall take place until a programme of archaeological work (POW) has been prepared by a qualified archaeologist, submitted by the applicant and approved in writing by Armagh City, Banbridge and Craigavon Borough Council in consultation with Historic Environment Division, Department for Communities. The POW shall provide for: - The identification and evaluation of archaeological remains within the site; - Mitigation of the impacts of development through licensed excavation recording or by preservation of remains in-situ; - Post-excavation analysis sufficient to prepare an archaeological report, to publication standard if necessary; and - Preparation of the digital, documentary and material archive for deposition. Reason: To ensure that archaeological remains within the application site are properly identified and protected or appropriately recorded.

    Received 2 May, published by the council 7 Aug 2026 Conditions
  • 29 Derryclone Road, Craigavon, BT67 0BN

    Discharge of Conditions 3 and 4 of planning ref: LA08/2025/0799/F which read: Conditon 3: Within twenty four hours prior to demolition, the existing buildings on the site shall be checked for bat presence by a competent ecologist and all demolition works shall be monitored by a competent ecologist. A report of the demolition shall be submitted to the Planning Authority for approval in writing within 2 weeks. Reason: To ensure protection to bats and their roosts. Condition 4: No demolition of buildings or structures shall take place between 1 March and 31 August inclusive, unless a competent ecologist has undertaken a detailed check for active bird’s nests immediately before demolition and provided written confirmation that no nests are present/birds will be harmed and/or there are appropriate measures in place to protect nesting birds. Any such written confirmation shall be submitted to the Planning Authority within 6 weeks of works commencing. Reason: To protect breeding birds.

    Received 27 May, published by the council 29 Jul 2026 Conditions
  • LA08/2026/0943/DC Awaiting decision

    Lands at No.19 Church Road extending from the rear of No's. 1 - 17a Church Road and south and east of Glen Dimplex premises Lurgan Road, Portadown.

    Discharge of condition 08 of LA08/2019/1595/F as it relates to sites 15 and 16; the condition reads as follows: After completing any remediation works required under Conditions 5, 6 and 7 and prior to occupation of the development, a verification report shall be submitted and approved in writing by the Council. This report shall be completed by competent persons in accordance with the Model Procedures for the Management of Land Contamination (CLR11). The verification report shall present all the remediation and monitoring works undertaken and demonstrate the effectiveness of the works in managing all the risks and achieving the remedial objectives.

    Received 28 Aug, published by the council 2 Sep 2026 Conditions
  • LA08/2026/0935/DC Awaiting decision

    Nos 31, 32, 33, 34, 35, 36 and 37 Hunter's Lodge, Drumnakelly, Lurgan, Craigavon BT66 6NB

    Discharge of Condition No.4 of LA08/2026/0498/F which reads: Within three 3 calendar months of the date of this decision, the developer shall submit to the Council for its written approval a landscaping scheme showing the location, numbers, species and sizes of trees and shrubs to be planted. The scheme of planting as finally approved shall be carried out during the first planting season after the Council’s final approval of that landscaping scheme. Trees or shrubs dying, removed or becoming seriously damaged within the lifetime of the development, shall be replaced in the next planting season with others of a similar size and species unless the Council gives written consent to any variation. Reason: In the interest of visual amenity and to ensure the provision, establishment and maintenance of a high standard of landscape.

    Received 26 Aug, published by the council 5 Sep 2026 Conditions
  • LA08/2026/0919/DC Awaiting decision

    Lands at and immediately south and west of 1 Clare Road, Clare, Tandragee, BT62 2EY

    Discharge of conditions 5 and 6 of LA08/2023/2288/F - Demolition of existing dwelling, erection of 4no. semi-detached two-storey dwellings, erection of retaining walling, creation of new access onto Cloghoge Road, and associated site works

    Received 24 Aug, published by the council 5 Sep 2026 Conditions