Planning application
Lands adjacent to 61 High Street Donaghadee
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Discharge of Condition No -13 of previous Approval LA06/2024/0405/F No site works of any nature or development shall take place until a programme of archaeological work (POW) has been prepared by a qualified archaeologist, submitted by the applicant and approved in writing by Ards and North Down Borough Council (ANDBC) in consultation with Historic Environment Division, Department for Communities. The POW shall provide for: The identification and evaluation of archaeological remains within the site, • Mitigation of the impacts of development through licensed excavation recording or by preservation of remains in-situ; • Post-excavation analysis sufficient to prepare an archaeological report, to publication standard if necessary; and • Preparation of the digital, documentary and material archive for deposition.
As published by the council, reference LA06/2026/0825/DC
Application record
- Reference
- LA06/2026/0825/DC
- Type
- Discharge of Condition
- Status
- Consultation Open
- Received
- 9 Sep 2026
- Validated
- 10 Sep 2026
- Ward
- Donaghadee
Timeline
Dates from the published record
-
9 Sep 2026
Received by Ards and North Down
-
10 Sep 2026
Validated
Checked as complete and ready for consideration.
-
14 Sep 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 5 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Ards and North Down took a median of 81 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Gahan and Long Ltd Agent
18 applications on PlanIndex · across 9 councils · 100% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
1 document on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Ards and North Down for determination, against a statutory target of eight weeks. Over the last year Ards and North Down decided condition discharge and variation applications in a median of 61 days. More in our guide to how long planning decisions take.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
59 High Street, Donaghadee, BT21 0AQ
96% historically approved · decision due ~14 Sep
Replacement of cast iron fireplace with wood burning stove. Lining the flue, removal of the hearth, inset panel and boards from the firebox, lining the wall behind the stove with brick slips, installing granite and the fitting of termination vents to the top of 4 chimneys.
Awaiting decision Heritage and listed buildings 12 docs -
49a High Street, Donaghadee, BT21 0AQ
96% historically approved · decision due ~21 May
Alterations to existing residential annexe to include part removal of internal wall, removal of 1 No. external window and re-opening of 2No. external windows
Awaiting decision Heritage and listed buildings Windows or glazing 9 docs -
49a High Street, Donaghadee, BT21 0AQ
98% historically approved · decision due ~28 May
Extension and alterations to residential annex to facilitate change of use to short term holiday accommodation
Awaiting decision Full applications Extension 15 docs -
47 High Street, Donaghadee, BT21 0AQ
Change-of-use from Dwelling to Short-term holiday let accommodation and raised decking to the rear (Retrospective) (Amended Proposal Description)
Granted Full applications 9 docsDomestic -
1-3 New Street, Donaghadee, BT21 0AG
Change of use of first floor office to holiday rental accommodation including ground floor bin storage (amended description)
Granted Full applications 16 docs -
Lands to rear of 38 High Street Donaghadee with access adjacent to 11-13 New Street Donaghadee
Discharge of Condition 7 of previously approved application LA06/2017/0959/F which states:- No development shall take place until full details of all proposed tree and shrub planting and a programme of works, have been submitted to and approved in writing by the Council and all tree and shrub planting shall be carried out in accordance with those details and at those times. Reason: To ensure the provision, establishment, and maintenance of a high standard of landscape. Please describe which part of the condition this application relates to: This Landscape Proposal presents a design scheme prepared by a qualified landscape architect, and will provide for the provision and establishment of a high standard of landscape. TSA Covering Letter Landscaping Proposal Site Location Plan Decision Notice
Granted Conditions Trees 6 docs
Other condition discharge and variation applications
In Ards and North Down
-
LA06/2026/0884/DC Awaiting decision
Vacant site North of Balloo Road, West of Bangor Grammar sports pitches and to the rear of nos 1-13 Rowan Glen, Balloo Road, Bangor, BT19 7UU
Discharge of Condiition 10 of previously approved application LA06/2022/0873/F which states - Prior to the construction of the drainage network, the applicant shall submit a Drainage Assessment, compliant with Policy FLD 3 & Annex D of PPS 15, to be agreed in writing with the Council, which demonstrates the safe management of any out of sewer flooding emanating from the surface water drainage network, agreed under Article 161 under the Water and Sewerage Services Act (Northern Ireland) 2016, in a 1 in 100 year event. Reason: In order to safeguard against surface water flood risk
-
LA06/2026/0887/DC Awaiting decision
Former Juvenile Justice Services Centre site (169 Rathgael Road) and surrounding lands which lie to the north of the Rathgael Road and west of the Rathgael Road/Balloo Road/Newtownards Road roundabout junction Bangor
Discharge of Condition 9 of previously approved application LA06/2016/0596/F which states - Prior to the occupation of the proposed development, the applicant shall provide to the Council, for approval, a Verification Report. This report must demonstrate that all the measures outlined in Section 10 of the RPS report entitled Proposed Residential Development, Rathgael Road, Bangor, Remedial Strategy referenced IBR0736 and bearing the Council date stamp 17th June 2016 have been fully implemented. The Verification Report shall demonstrate the successful completion of the remediation works and that the site is now fit for end-use. It must demonstrate that the identified potential pollutant linkages are effectively broken. The Verification Report shall be in accordance with current best practice and guidance as outlined by the Environment Agency. In particular, this Verification Report must demonstrate: a) Full Details of the installation and depths of the clean cover barriers have been confirmed as per layout. b) All fuel transfer lines and all associated pipework have been traced and removed in accordance with PPG 2 Above Ground Oil Storage Tanks. All remaining soils (or base and side-walls of all excavations) have been sampled and proven suitable for the proposed end-use. c) The hotspots of heavy metal and hydrocarbon contamination have been removed by excavation to a depth of 0.5m below the depth of the exceedance. All remaining soils (or base and side-walls of all excavations) have been sampled and demonstrably proven suitable for the proposed end-use. d) All imported soil brought on to the site has been accompanied by traceability documentation and has been demonstrably proven to be suitable for the end use. Reason: In the interests of living conditions of residents of the proposed development. Remedial Verification Report
-
LA06/2026/0879/DC Awaiting decision
Royal Hotel and Windsor Bar, 22-28 Quay Street, Bangor, BT20 5ED
Discharge of Condition 6 of previously approved application LA06/2021/1477/F which states - Prior to the construction of the drainage network, a Drainage Assessment, compliant with FLD 3 & Annex D of PPS 15, shall be submitted to and agreed in writing by the Council which demonstrates the safe management of any out of sewer flooding emanating from the surface water drainage network, in a 1 in 100 year event with an additional allowance for climate change. Reason: To safeguard against flood risk to the development and from the development to elsewhere. Drainage Assessment produced by Design ID ref 19053-DID-ZZ-XX-RP-0002
-
LA06/2026/0878/DC Awaiting decision
Royal Hotel and Windsor Bar, 22-28 Quay Street, Bangor, T20 5ED
Discharge of Condition 5 of previously approved application LA06/2021/1477/F which states - No development shall take place on-site until the method of sewage disposal has been agreed in writing with Northern Ireland Water (NIW) or a consent to discharge has been granted under the terms of the Water (NI) Order 1999. Reason: To ensure there will be no adverse impact on the environment. NI Water agreement
-
LA06/2026/0873/DC Awaiting decision
Lands South of 37-77 Court Street and 1-11 Canal Row, situated within Bawn Wall and bounded by the canal, Newtowards
Discharge of Condition 15 of previously approved application LA06/2023/2434/F which states - On completion of the remediation and prior to the occupation of any dwelling hereby approved, the applicant shall provide to the Council, for approval in writing, a Verification Report. This report shall demonstrate that the remediation measures outlined in the report titled; ‘Contaminated Land Assessment (Phase 1 PRA, Phase 2 GQRA and Outline Remediation Strategy) Lands within the Bawn Wall, Newtownards, referenced P3098-1 and dated November 2023, have been fully implemented. This report shall demonstrate the successful completion of remediation works and demonstrate that the site is now fit for end-use and include details of: • Capping system • The methodology and programme of the capping system • Photographs and records of any excavation works within the source area including photographs showing depths to accommodate the capping layer • Photographs of the clean material being used and placed on the source area, also showing depths being placed • Records and photographs showing the depth of the capping system as required • Details of the materials that were used for the capping system along with laboratory certificates and results which confirm that the materials are suitable for use. Reason: Protection of human health. VERIFICATION REPORT FOR PHASE 5 (UNITS 1-6 AND 34-41)