Planning application

T G Eakin Ltd 15 Ballystockart Road, Comber, BT23 5QY

Awaiting decision Ards and North Down LA06/2026/0623/DC Discharge of Condition

Works: Extension

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Discharge of Condition 5 of previously approved application LA06/2023/1513/F which states:- Within one month of the extension becoming operational, an additional noise survey and verification report shall be submitted to an approved in writing by the Council. This report shall confirm the specification of all plant associated with the extension and any associated noise attenuation measures included. It shall confirm that the combined rating level of plant and equipment associated with the proposed extension in relation to current background sound levels at all nearby receptors as specified in table 6 of the Noise Impact Assessment Report. The specific noise level from any plant/ equipment shall be rated to include a correction for tonal, impulsive noise or any other features that draw attention to it in accordance with BS4142:2014. Information Submitted: Post-commissioning Noise Monitoring Survey and Verification Report

As published by the council, reference LA06/2026/0623/DC

Application record

Reference
LA06/2026/0623/DC
Type
Discharge of Condition
Status
Consultation Open
Received
7 Jul 2026
Validated
20 Jul 2026
Ward
Comber West
Postcode
BT23 5QY

Timeline

Dates from the published record

  1. 7 Jul 2026

    Received by Ards and North Down

  2. 20 Jul 2026

    Validated

    Checked as complete and ready for consideration.

  3. 29 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 14 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Ards and North Down took a median of 78 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Gravis Planning Ltd Agent, a planning consultancy registered in Holywood

Active · incorporated 2005 · Holywood

234 applications on PlanIndex · across 40 councils · 98% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Ards and North Down for determination, against a statutory target of eight weeks. Over the last year Ards and North Down decided condition discharge and variation applications in a median of 46 days. More in our guide to how long planning decisions take.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

In Ards and North Down

  • LA06/2026/0825/DC Awaiting decision

    Lands adjacent to 61 High Street Donaghadee

    Discharge of Condition No -13 of previous Approval LA06/2024/0405/F No site works of any nature or development shall take place until a programme of archaeological work (POW) has been prepared by a qualified archaeologist, submitted by the applicant and approved in writing by Ards and North Down Borough Council (ANDBC) in consultation with Historic Environment Division, Department for Communities. The POW shall provide for: The identification and evaluation of archaeological remains within the site, • Mitigation of the impacts of development through licensed excavation recording or by preservation of remains in-situ; • Post-excavation analysis sufficient to prepare an archaeological report, to publication standard if necessary; and • Preparation of the digital, documentary and material archive for deposition.

    9 Sep 2026 Conditions
  • Lands to rear Of 38 High Street, Donaghadee with access adjacent to 11-13 New Street, Donaghadee

    Discharge of Conditions 2 and 3 of previously approved application LA06/2017/0959/F. Condition 2 Summary of condition requirements: 'The vehicular access, including visibility splays and any forward sight distance, shall be provided in accordance with the proposed site layout plan, Drawing Number 02/E, bearing the Council date stamp 12th April 2021, prior to the commencement of any other development hereby permitted and prior to commencement of any other development hereby permitted. Reason: To ensure there is a satisfactory means of access in the interests of road safety and the convenience of road users.' and Condition 3 Summary of condition requirements: The area within the visibility splays and any forward sight line shall be cleared to provide a level surface no higher than 250mm above the level of the adjoining carriageway, prior to the commencement of any other development hereby permitted, and such splays shall be retained and kept clear thereafter. Reason: To ensure there is a satisfactory means of access in the interests of road safety and the convenience of road users. Photos of the access and visibility splays provided in accordance with the approved site layout plan 02/E

    7 Aug 2026 Conditions
  • Lands To Rear Of No.38 High Street Donaghadee With Access Adjacent To Nos. 11-13 New Street Donaghadee

    Discharge of Condition 11 of previously approved application LA06/2017/0959/F which states:- Prior to the commencement of works, samples of the proposed stone and brick for use on the new proposed buildings and boundary walls shall be submitted to and agreed in writing by the Council in conjunction with Historic Environment Division. The works shall thereafter be carried out solely in accordance with the approved samples. A sample of the stone and brick shall be retained on site until the project is complete Reason: To ensure that special regard is paid to protecting the special architectural and historic interest and integrity of the building under Section 80 of The Planning Act (NI) 2011. Photo samples of the proposed stone and brick for use on the new proposed buildings and boundary walls. The two panels are located within the site

    7 Aug 2026 Conditions
  • 3 (The Square) Portaferry Road Cloughey BT22 1HR And lands adjoining No.s 5,7 and 9 Portaferry Road, BT22 1HP and No.s 2,12,18 and 22 Mill Lane Cloughey, BT22 1HT

    Discharge of Condition 8 of Planning Approval: LA06/2019/0634/F - The drainage assessment states that it is proposed to attenuate more than the 30 year event in the drainage network. Therefore, prior to the commencement of any development hereby permitted, a final drainage assessment, containing a detailed drainage network design and compliant with Annex D of PPS 15 must be submitted to the Council for its consideration and written approval; or written confirmation from NIW stating that they will adopt a drainage network that will attenuate the 1 in 100 year storm event.

    14 Aug 2026 Conditions
  • Lands to the NW of Kiltonga Industrial Estate SW of Belfast Road and South of Milecross Road Newtownards

    Discharge of Condition 29 of previously approved application LA06/2021/1476/F which states: A programme of post-excavation analysis, preparation of an archaeological report, dissemination of results and preparation of the excavation archive shall be undertaken in accordance with the programme of archaeological work approved under condition 27. These measures shall be implemented, and a final archaeological report shall be submitted to the Council within 12 months of the completion of archaeological site works, or as otherwise agreed in writing with the Council. Submitting a POW report which states discovery that there was an archaeological evaluation carried out in 2017 across the site which didn’t encounter any archaeology. This should mean no further archaeological works are required on site

    11 Jun 2026 Conditions