Proposal
Discharge of condition 2 of previously approved application LA06/2016/1108/F which states : All hard and soft landscape works shall be carried out in accordance with the approved plans Drawing Nos. 08A and 09A bearing the date stamp 15 December 2020 and Drawing No. 10 bearing the date stamp 14 October 2016, and the appropriate British Standard or other recognised Codes of Practice and shall be retained thereafter. A specification detailing the timing for the implementation of hard and soft landscaping works shall be submitted to and approved in writing by the Council prior to commencement of any works on the site. All l hard and soft landscaping shall be carried out in accordance with the approved specification. Reason: To ensure the provision, establishment and maintenance of a high standard of landscape. Discharge of condition 7 of previously approved application LA06/2016/1108/F which states : A Final Construction Environmental Management Plan (CEMP) shall be submitted to and approved by the Council in writing prior to the commencement of any works on site. This final CEMP shall contain all the mitigation as described in the Outline Construction Environmental Management Plan completed by Doran Consulting, dated November 2019 and shall be implemented as approved during the construction phase to the satisfaction of the Council. Reason: To ensure that the appointed contractor is aware of and implements the appropriate environmental mitigation during improvements construction phase. Discharge of condition 11 of previously approved application LA06/2016/1108/F which states : A revised Noise Impact Assessment /Noise Management Plan for this development shall be submitted to and agreed by the Council in writing prior to any development works commencing on site. This report shall include: An assessment of the potential noise from construction activities which must have reference to BS 5228-1:2009+A1:2014 and include confirmation that the construction works will not exceed the Category A limit (65 dB LAeq daytime). An outline of the ongoing noise monitoring programme during all construction works, (including locations/ frequency) to verify compliance with the set levels. Details of all mitigation measures to control the construction noise from the site. The noise mitigation measures shall be implemented as approved during the construction phase to the satisfaction of the Council. Reason: In the interests of amenity.
As published by the council, reference LA06/2026/0567/DC
Application record
- Reference
- LA06/2026/0567/DC
- Type
- Discharge of Condition
- Status
- Consultation Open
- Received
- 23 Jun 2026
- Validated
- 23 Jun 2026
- Ward
- Broadway
- Postcode
- BT20 4LG
Site history
Applications at this address on the Ards and North Down register
This site has had 2 applications since 2026: 0 approved, 1 refused.
-
LA06/2026/0321/NMC Refused
Ward Park Hamilton Road, Bangor, BT20 4LG
Non-Material Change to previous approval LA06/2016/1108/F to include: Addition of feature entrance arch at Hamilton Road entrance; addition of pathway to north of site; and removal of peacock enclosure.
Timeline
Dates from the published record
-
23 Jun 2026
Received by Ards and North Down
-
29 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 18 August 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Ards and North Down took a median of 81 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
8 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Ards and North Down for determination, against a statutory target of eight weeks. Over the last year Ards and North Down decided condition discharge and variation applications in a median of 61 days. More in our guide to how long planning decisions take.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Ward Park Hamilton Road, Bangor, BT20 4LG
Non-Material Change to previous approval LA06/2016/1108/F to include: Addition of feature entrance arch at Hamilton Road entrance; addition of pathway to north of site; and removal of peacock enclosure.
Refused Amendments 3 docs -
Ward Park Tennis Courts, Castle Street, Bangor, BT20 4TP
98% historically approved · decision due ~3 Mar
The upgrade, repositioning and replacement of existing 6No. 10m floodlighting columns and installation of 6No. concrete bases.
Awaiting decision Full applications 14 docs -
17 Maralin Avenue, Bangor, BT20 4RQ
Single-storey side extension (facing road); enlarged rear dormer
Granted Full applications Extension Loft or dormer 17 docsSmall domestic -
-
11 Maralin Avenue Bangor BT20 4RQ
Two-storey extension to side and rear (including rear balcony).
Granted Full applications Extension 22 docs -
64 Moira Drive, Bangor, BT20 4RW
Single storey east side and rear extension with first floor covered balcony
Granted Full applications Extension 14 docsSmall domestic
Other condition discharge and variation applications
In Ards and North Down
-
LA06/2026/0884/DC Awaiting decision
Vacant site North of Balloo Road, West of Bangor Grammar sports pitches and to the rear of nos 1-13 Rowan Glen, Balloo Road, Bangor, BT19 7UU
Discharge of Condiition 10 of previously approved application LA06/2022/0873/F which states - Prior to the construction of the drainage network, the applicant shall submit a Drainage Assessment, compliant with Policy FLD 3 & Annex D of PPS 15, to be agreed in writing with the Council, which demonstrates the safe management of any out of sewer flooding emanating from the surface water drainage network, agreed under Article 161 under the Water and Sewerage Services Act (Northern Ireland) 2016, in a 1 in 100 year event. Reason: In order to safeguard against surface water flood risk
-
LA06/2026/0887/DC Awaiting decision
Former Juvenile Justice Services Centre site (169 Rathgael Road) and surrounding lands which lie to the north of the Rathgael Road and west of the Rathgael Road/Balloo Road/Newtownards Road roundabout junction Bangor
Discharge of Condition 9 of previously approved application LA06/2016/0596/F which states - Prior to the occupation of the proposed development, the applicant shall provide to the Council, for approval, a Verification Report. This report must demonstrate that all the measures outlined in Section 10 of the RPS report entitled Proposed Residential Development, Rathgael Road, Bangor, Remedial Strategy referenced IBR0736 and bearing the Council date stamp 17th June 2016 have been fully implemented. The Verification Report shall demonstrate the successful completion of the remediation works and that the site is now fit for end-use. It must demonstrate that the identified potential pollutant linkages are effectively broken. The Verification Report shall be in accordance with current best practice and guidance as outlined by the Environment Agency. In particular, this Verification Report must demonstrate: a) Full Details of the installation and depths of the clean cover barriers have been confirmed as per layout. b) All fuel transfer lines and all associated pipework have been traced and removed in accordance with PPG 2 Above Ground Oil Storage Tanks. All remaining soils (or base and side-walls of all excavations) have been sampled and proven suitable for the proposed end-use. c) The hotspots of heavy metal and hydrocarbon contamination have been removed by excavation to a depth of 0.5m below the depth of the exceedance. All remaining soils (or base and side-walls of all excavations) have been sampled and demonstrably proven suitable for the proposed end-use. d) All imported soil brought on to the site has been accompanied by traceability documentation and has been demonstrably proven to be suitable for the end use. Reason: In the interests of living conditions of residents of the proposed development. Remedial Verification Report
-
LA06/2026/0879/DC Awaiting decision
Royal Hotel and Windsor Bar, 22-28 Quay Street, Bangor, BT20 5ED
Discharge of Condition 6 of previously approved application LA06/2021/1477/F which states - Prior to the construction of the drainage network, a Drainage Assessment, compliant with FLD 3 & Annex D of PPS 15, shall be submitted to and agreed in writing by the Council which demonstrates the safe management of any out of sewer flooding emanating from the surface water drainage network, in a 1 in 100 year event with an additional allowance for climate change. Reason: To safeguard against flood risk to the development and from the development to elsewhere. Drainage Assessment produced by Design ID ref 19053-DID-ZZ-XX-RP-0002
-
LA06/2026/0878/DC Awaiting decision
Royal Hotel and Windsor Bar, 22-28 Quay Street, Bangor, T20 5ED
Discharge of Condition 5 of previously approved application LA06/2021/1477/F which states - No development shall take place on-site until the method of sewage disposal has been agreed in writing with Northern Ireland Water (NIW) or a consent to discharge has been granted under the terms of the Water (NI) Order 1999. Reason: To ensure there will be no adverse impact on the environment. NI Water agreement
-
LA06/2026/0873/DC Awaiting decision
Lands South of 37-77 Court Street and 1-11 Canal Row, situated within Bawn Wall and bounded by the canal, Newtowards
Discharge of Condition 15 of previously approved application LA06/2023/2434/F which states - On completion of the remediation and prior to the occupation of any dwelling hereby approved, the applicant shall provide to the Council, for approval in writing, a Verification Report. This report shall demonstrate that the remediation measures outlined in the report titled; ‘Contaminated Land Assessment (Phase 1 PRA, Phase 2 GQRA and Outline Remediation Strategy) Lands within the Bawn Wall, Newtownards, referenced P3098-1 and dated November 2023, have been fully implemented. This report shall demonstrate the successful completion of remediation works and demonstrate that the site is now fit for end-use and include details of: • Capping system • The methodology and programme of the capping system • Photographs and records of any excavation works within the source area including photographs showing depths to accommodate the capping layer • Photographs of the clean material being used and placed on the source area, also showing depths being placed • Records and photographs showing the depth of the capping system as required • Details of the materials that were used for the capping system along with laboratory certificates and results which confirm that the materials are suitable for use. Reason: Protection of human health. VERIFICATION REPORT FOR PHASE 5 (UNITS 1-6 AND 34-41)