Planning application
Lands to the rear of 23-61 Castle Street, Comber, BT23 5EA
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Discharge of Condition 6 of previously approved application LA06/2021/1220/F which states - Prior to the occupation of the proposed development, a Verification Report shall be submitted to and agreed in writing by the Council. This report shall demonstrate that the remediation measures outlined in the Pentland Macdonald report; Contamination Assessment and remediation strategy, Castle Lane, Comber referenced PM19- 1137 and dated December 20219 have been implemented. The Verification Report shall demonstrate the successful completion of remediation works and that the site is now fit for end-use (Residential with Plant Uptake). It must demonstrate that the identified potential pollutant linkages are effectively broken. The Verification Report shall be in accordance with current guidance and best practice. In particular, this Verification Report must demonstrate that: • The final site layout including areas of hardstandlng, gardens and soft landscaped areas are as specified in the Site Plan Proposed Drawing No. 03A. • The emplacement of capping layers across gardens and landscaped areas is as specified: In garden areas- 1m capping layer comprising a capillary break layer of a minimum of 300mm of granular material; overlain by 700mm of clean subsoil and topsoil and in soft landscaped areas- the emplacement of a 0.5m thick capping layer of glean gravel/ subsoil topsoil. All material used in the capping layers must be demonstrably proven suitable for use. • Gas protection measures have been installed in line with a Characteristic Situation 2 scenario which attain a gas protection score of 3.5 (Table 4, B88485) and shall include two or more of the following measures: • Concrete floor slabs; • A proprietary gas resistant membrane installed across the entire footprint of the buildings; • A passively ventilated under floor void. The verification of the gas protection measures shall follow CIRIA C735 Good Practice on the testing and verification of protection systems for buildings against hazardous ground gases. Information Submitted: Verification Report
As published by the council, reference LA06/2026/0523/DC
Application record
- Reference
- LA06/2026/0523/DC
- Type
- Discharge of Condition
- Status
- Determined
- Decision
- Granted As published: Condition Discharged
- Received
- 11 Jun 2026
- Validated
- 11 Jun 2026
- Decided
- 21 Jul 2026
- Ward
- Comber West
- Postcode
- BT23 5EA
Timeline
Dates from the published record
-
11 Jun 2026
Received by Ards and North Down
-
21 Jul 2026
Decision issued: Condition Discharged
-
29 Jul 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Campbell Architects Limited Agent, an architecture practice registered in Milton Keynes
Liquidation · incorporated 2007 · Milton Keynes
19 applications on PlanIndex · across 4 councils · 100% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
7 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Ards and North Down granted permission on 21 July 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Lands to the rear of Nos. 23-61 Castle Street, Comber, BT23 5EA
Non material change to approved scheme to incorporate site specific amendments, including; - Minor updates to position and size of specific openings (windows & doors) within houses and apartments - Minor alterations to arrangement of materials within approved elevations (extent of coverage only - no change from approved palette) - Removal of - Minor updates to site arrangements to capture small on-site variations
Granted Amendments New dwelling Windows or glazing 24 docs -
Lands to the rear of Nos. 23-61 Castle Street, Comber, BT23 5EA
Discharge of Condition 12 of previously approved application LA06/2021/1220/F which states:- No residential units shall be occupied until a Landscape Management and Maintenance Plan has been submitted to and approved by the Council in writing. The plan shall set out the period of the plan, long term objectives, management responsibilities, performance measures and maintenance schedules for all areas of landscaping and open space. The landscape management plan shall be carried out as approved in perpetuity. Landscape Management & Maintenance Plan Condition and Discharge of Condition 13. which states:- The long term management and maintenance of the open space, as indicated in blue on Drawing No. 19 shall be undertaken by a management company commissioned by the developer. Details of the arrangements to be put in place to establish the management company and details of the alternative measures which will take effect in the event that the management arrangements break down, must be submitted to and agreed in writing with the Council prior to the occupation of any part of the development hereby permitted Radius Housing letter
Granted Conditions 7 docs -
Lands to the rear of Nos. 23-61 Castle Street, Comber, BT23 5EA
Discharge Condition 5 of LA06/2021/1220/F, which states: "A programme of post-excavation analysis, preparation of an archaeological report, dissemination of results and preparation of the excavation archive shall be undertaken in accordance with the programme of archaeological work approved under condition 3. These measures shall be implemented and a final archaeological report shall be submitted to and agreed in writing with the Council within 12 months of the completion of archaeological site works, or as otherwise agreed in writing with the Council."
Granted Conditions 7 docs -
Directly North of 61 Castle Street, Comber, BT23 5DY
1no. shipping container to be used as self-tanning booth (Sui Generis use class) and 1no. retrospective self-service parcel collection unit (Amended Plans/Description)
Granted Full applications 16 docs -
61 Castle Street, Comber, BT23 5DY
1x Shop sign with trough light, 1x fascia sign with trough light and 1x digital screen
Granted Advertising 17 docs -
First Floor 28a Castle Street Comber BT23 5DZ
Change of use of existing storeroom to retail unit
Granted Full applications 13 docs
Other condition discharge and variation applications
In Ards and North Down
-
LA06/2026/0884/DC Awaiting decision
Vacant site North of Balloo Road, West of Bangor Grammar sports pitches and to the rear of nos 1-13 Rowan Glen, Balloo Road, Bangor, BT19 7UU
Discharge of Condiition 10 of previously approved application LA06/2022/0873/F which states - Prior to the construction of the drainage network, the applicant shall submit a Drainage Assessment, compliant with Policy FLD 3 & Annex D of PPS 15, to be agreed in writing with the Council, which demonstrates the safe management of any out of sewer flooding emanating from the surface water drainage network, agreed under Article 161 under the Water and Sewerage Services Act (Northern Ireland) 2016, in a 1 in 100 year event. Reason: In order to safeguard against surface water flood risk
-
LA06/2026/0887/DC Awaiting decision
Former Juvenile Justice Services Centre site (169 Rathgael Road) and surrounding lands which lie to the north of the Rathgael Road and west of the Rathgael Road/Balloo Road/Newtownards Road roundabout junction Bangor
Discharge of Condition 9 of previously approved application LA06/2016/0596/F which states - Prior to the occupation of the proposed development, the applicant shall provide to the Council, for approval, a Verification Report. This report must demonstrate that all the measures outlined in Section 10 of the RPS report entitled Proposed Residential Development, Rathgael Road, Bangor, Remedial Strategy referenced IBR0736 and bearing the Council date stamp 17th June 2016 have been fully implemented. The Verification Report shall demonstrate the successful completion of the remediation works and that the site is now fit for end-use. It must demonstrate that the identified potential pollutant linkages are effectively broken. The Verification Report shall be in accordance with current best practice and guidance as outlined by the Environment Agency. In particular, this Verification Report must demonstrate: a) Full Details of the installation and depths of the clean cover barriers have been confirmed as per layout. b) All fuel transfer lines and all associated pipework have been traced and removed in accordance with PPG 2 Above Ground Oil Storage Tanks. All remaining soils (or base and side-walls of all excavations) have been sampled and proven suitable for the proposed end-use. c) The hotspots of heavy metal and hydrocarbon contamination have been removed by excavation to a depth of 0.5m below the depth of the exceedance. All remaining soils (or base and side-walls of all excavations) have been sampled and demonstrably proven suitable for the proposed end-use. d) All imported soil brought on to the site has been accompanied by traceability documentation and has been demonstrably proven to be suitable for the end use. Reason: In the interests of living conditions of residents of the proposed development. Remedial Verification Report
-
LA06/2026/0879/DC Awaiting decision
Royal Hotel and Windsor Bar, 22-28 Quay Street, Bangor, BT20 5ED
Discharge of Condition 6 of previously approved application LA06/2021/1477/F which states - Prior to the construction of the drainage network, a Drainage Assessment, compliant with FLD 3 & Annex D of PPS 15, shall be submitted to and agreed in writing by the Council which demonstrates the safe management of any out of sewer flooding emanating from the surface water drainage network, in a 1 in 100 year event with an additional allowance for climate change. Reason: To safeguard against flood risk to the development and from the development to elsewhere. Drainage Assessment produced by Design ID ref 19053-DID-ZZ-XX-RP-0002
-
LA06/2026/0878/DC Awaiting decision
Royal Hotel and Windsor Bar, 22-28 Quay Street, Bangor, T20 5ED
Discharge of Condition 5 of previously approved application LA06/2021/1477/F which states - No development shall take place on-site until the method of sewage disposal has been agreed in writing with Northern Ireland Water (NIW) or a consent to discharge has been granted under the terms of the Water (NI) Order 1999. Reason: To ensure there will be no adverse impact on the environment. NI Water agreement
-
LA06/2026/0873/DC Awaiting decision
Lands South of 37-77 Court Street and 1-11 Canal Row, situated within Bawn Wall and bounded by the canal, Newtowards
Discharge of Condition 15 of previously approved application LA06/2023/2434/F which states - On completion of the remediation and prior to the occupation of any dwelling hereby approved, the applicant shall provide to the Council, for approval in writing, a Verification Report. This report shall demonstrate that the remediation measures outlined in the report titled; ‘Contaminated Land Assessment (Phase 1 PRA, Phase 2 GQRA and Outline Remediation Strategy) Lands within the Bawn Wall, Newtownards, referenced P3098-1 and dated November 2023, have been fully implemented. This report shall demonstrate the successful completion of remediation works and demonstrate that the site is now fit for end-use and include details of: • Capping system • The methodology and programme of the capping system • Photographs and records of any excavation works within the source area including photographs showing depths to accommodate the capping layer • Photographs of the clean material being used and placed on the source area, also showing depths being placed • Records and photographs showing the depth of the capping system as required • Details of the materials that were used for the capping system along with laboratory certificates and results which confirm that the materials are suitable for use. Reason: Protection of human health. VERIFICATION REPORT FOR PHASE 5 (UNITS 1-6 AND 34-41)