Skip to content
PlanIndex Get alerts
Menu

Planning application

LA06/2026/0320/F

14 Laburnum Drive, Comber, BT23 5WG

Granted Ards and North Down Full

Proposal

Front door widening and removal of front door canopy

As published by the council, reference LA06/2026/0320/F

Timeline

Dates from the published record

  1. 15 Apr 2026

    Received by Ards and North Down

  2. 30 Apr 2026

    Validated

    Checked as complete and ready for consideration.

  3. 15 Jun 2026

    Decision issued: Granted

  4. 29 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • LA06/2025/1093/DC Awaiting decision

    Lands South East of the Copelands Link Roundabout at the Comber Bypass, Comber

    Discharge of Condition 12 of previously approved application LA06/2018/0997/RM which states:- A programme of post excavation analysis , preparation of an Archaeological Report dissemination of results and preparation of the excavation archive shall be undertaken in accordance with the programme of archaeological work approved under condition 10. These measures shall be implemented and a final archaeological report shall be submitted to local council within 12 months of the completion or archaeological site works , or as otherwise agreed in writing with council Submitted documentation: Final Archaeological Report

    4 Dec 2025 245m away Conditions
  • Lands SE of the Copelands Link roundabout at the Comber Bypass, Comber

    Discharge of condition 10 to the planning approval LA06/2018/0997/RM, which states: No site works of any nature or development shall take place until a programme of archaeological work (POW) has been prepared by a qualified archaeologist, submitted by the applicant and approved in writing by the Council in consultation with Historic Environment Division, Department for Communities. The POW shall provide for - the identification and evaluation of archaeological remains within the site; - mitigation of the impacts of the development through licensed excavation recording or by preservation of remains in-situ post-excavation analysis sufficient to prepare an archaeological report, to publication standard if necessary; and – preparation of the digital, documentary and material archive for deposition .

    30 Oct 2025 263m away Conditions
  • 35m South West of 12 Little Enler Way, Comber, BT23 5AU

    Construction of new retail unit, petrol filling station, ATM, bulk fuels and associated access, parking, site works and landscaping (Amended/Additional documents)

    7 Jan 2026 311m away Full applications
  • 41a Copeland Crescent, Comber, BT23 5JA

    Single storey garage extension to side of dwelling

    8 Jan 2026 350m away Full applications
  • LA06/2025/1117/DC Awaiting decision

    Lands south east of the Copelands Link roundabout at the Comber By Pass, Comber, BT23 5BW

    Discharge of condition 12 of approval LA06/2019/0568/RM Final Archaeological Report A programme of post-excavation analysis, preparation of an archaeological report, dissemination of results and preparation of an excavation archive shall be undertaken in accordance with the programme of archaeological work approved under condition 10. These measures shall be implemented and a final archaeological report shall be submitted to the local council within 12 months of the completion of archaeological site works, or as otherwise agreed in writing with council.

    12 Dec 2025 382m away Conditions
  • LA06/2026/0408/F Awaiting decision

    Lands at Enler Village, Comber, approximately 25m south of No’s 31 - 40 Little Enler Green, BT23 5FB and approximately 20m east of No’s 1 - 15 Little Enler Gardens, BT23 5UX

    Proposed erection of 18 no. apartments across 2 no. blocks with associated access, parking and landscaping works

    11 May 2026 494m away Full applications

In Ards and North Down

  • 389 Old Holywood Road Holywood BT18 9QH

    Two-storey and single-storey extensions to front

    29 Dec 2025 Full applications
  • 9-15 Crawfords Farm Grove, Bangor, BT19 1PL

    Retention of 5 dwellings, access and parking, and erection of new dwelling (Change of house type to approval LA06/2017/0877/RM) (Amended Plans)

    13 Oct 2025 Full applications
  • Cordners, 13 Conway Square & 4 Lower Mary Street, Newtownards, BT23 4DA

    Replacement of fire damaged shop unit, raise roof level to rear of no 13, raise roof ridge level and facade alterations to no 4.

    2 Dec 2025 Full applications
  • 18a Old Seahill Road, Holywood, BT18 0EG

    Front and side extension (including front balcony, elevational changes and use of garage to habitable room)

    25 May 2026 Full applications
  • 21 Cambourne Park Newtownards BT23 4WE

    Extension of domestic curtilage and erection of fence (retrospective)

    2 Mar 2026 Full applications