Planning application
10-12 & 6-8 Main Street, Bangor BT20 5AG
Works: Windows or glazing
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Sub-division of units 10-12 & 6-8 Main Street, Bangor. Unit 10-12 change of use from cafe/restaurant (Sui-generis) to bookmakers (Sui-generis) at ground floor only with minor shopfront alterations. Retention of unit 6-8 as cafe/restaurant (Sui-generis).
As published by the council, reference LA06/2026/0233/F
Application record
- Reference
- LA06/2026/0233/F
- Type
- Full
- Status
- Determined
- Decision
- Granted
- Received
- 19 Mar 2026
- Validated
- 27 Mar 2026
- Decided
- 20 May 2026
- Ward
- Harbour
- Postcode
- BT20 5AG
Timeline
Dates from the published record
-
19 Mar 2026
Received by Ards and North Down
-
27 Mar 2026
Validated
Checked as complete and ready for consideration.
-
20 May 2026
Decision issued: Granted
-
27 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in Belfast
80 applications on PlanIndex · across 11 councils · 97% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
13 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
-
Lands at and to the rear of 18 – 52 Main Street (Reeds Rain to TK Maxx), 2 – 34 King Street, 5 -17 Southwell Road, 5 – 41 Queen’s Parade, Marine Gardens car park, the Esplande Gardens, and area around McKee Clock, Bangor, BT20 3BJ
Demolition of existing buildings at 5-12 and 35-41 Queen's Parade, 22-30 Main Street (formerly B & M Bargains), 34-36 Main Street (Oxfam and Hospice shops), 6-34 King Street and 5-17 Southwell Road; minor extension and elevational changes to 40-42 Main Street (Caffe Nero); creation of new means of escape and installation of rooflights to 20 Main Street (Halifax); creation of new bin storage and basement access together with minor facade works to 48 Main Street (TK Maxx); erection of a mixed use development comprising culture and leisure facilities (class D), a 66 bedroom hotel, retail units, food and beverage outlets, offices (class B1- (a)), 137 residential units comprising 113 apartments in 3 blocks and 12 duplex apartments along King Street, creation of a new vehicular access onto Southwell Road to serve undercroft car park comprising 217 spaces together with 14 courtyard spaces and 24 on street, creation of new vehicular access onto King Street to serve residential parking, minor modifications to the Main Street and King Street junction and creation of a two-way street along Southwell Road from the junction with Primrose Street, creation of a new service vehicle access onto Main Street, creation of new public squares and courtyards including new pedestrian access points; and the redevelopment of Marine Gardens Car Park including partial demolition of sea-wall to create a public realm space comprising gardens and lawns, play areas, events spaces, covered shelters, 4 kiosks and 2 pavilions (housing food and beverage operators), together with other ancillary development: Variation of condition No. 2 of LA06/2020/0097/F - Amended phasing of development Variation of condition No. 3 of LA06/2020/0097/F - Minor landscape layout amendments to public realm Variation of condition No. 6 of LA06/2020/0097/F - Minor amendments to hard and soft landscaping within public realm Variation of condition No. 14 of LA06/2020/0097/F - Amendment to drawing references showing plant rooms Variation of condition No. 16 of LA06/2020/0097/F - Amendment to reflect updated drawing reference Variation of condition No. 43 of LA06/2020/0097/F - Amended drainage proposals Variation of condition No. 44 of LA06/2020/0097/F - Amendment to reflect updated drawing reference Variation of condition No. 45 of LA06/2020/0097/F - Amendment to reflect updated drawing reference Variation of condition Nos. of 48, 49, 54 and 56 of LA06/2020/0097/F - Amended phasing of roadworks Variation of condition No. 57 of LA06/2020/0097/F - Amendment to reflect updated drawing reference (UPDATED WORDING FOR CONDITION No. 43) THE FULL PROPOSAL DESCRIPTION CAN BE VIEWED ON THE NIPP IN THE DOCUMENT ENTITLED "FULL PROPOSAL DESCRIPTION'
Granted Full applications New dwelling Extension +2 112 docsMajor scheme -
Lands at and to the rear of 18 – 52 Main Street (Reeds Rain to TK Maxx), 2 – 34 King Street, 5 -17 Southwell Road, 5 – 41 Queen’s Parade, Marine Gardens car park, the Esplande Gardens, and area around McKee Clock
Non Material Change to the planning approval LA06/2020/0097/F: Update to the landscape design for Marine Gardens to remove water feature, update to the description of development to remove reference to a water feature, amendments to footprint/roof plan of pavilion buildings, other minor landscaping design changes, updates to relevant drawing references within Conditions 2, 3, 4, 5, 6, 9, 10, 11, 12, 16, 43, 44, 45, 49, 54, 56 and 57 of LA06/2020/0097/F
Granted Amendments 40 docs -
Lands at and to the rear of 18 – 52 Main Street (Reeds Rain to TK Maxx), 2 – 34 King Street, 5 -17 Southwell Road, 5 – 41 Queen’s Parade, Marine Gardens car park, the Esplande Gardens, and area around McKee Clock, Bangor
96% historically approved · decision due ~31 Jul
Discharge of condition 12 of Planning Approval LA06/2024/0559/F which states ‘The proposed kiosks and shelters indicated as S1-S5 and K1-K4 on Drawing No. 64A shall not exceed 4.25m in height when measured from finished floor level. The internal floor space of the kiosks shall not exceed 20sqm and the footprint of the shelters hereby approved shall not exceed 32sqm. Details of the design and finishes shall be submitted to and approved in writing by the Council prior to commencement of construction of the kiosks and shelters. The development shall be carried out in accordance with the details as subsequently approved.’
Awaiting decision Conditions 4 docs -
Lands at and to the rear of 18 – 52 Main Street (Reeds Rain to TK Maxx), 2 – 34 King Street, 5 -17 Southwell Road, 5 – 41 Queen’s Parade, Marine Gardens car park, the Esplande Gardens, and area around McKee Clock
Discharge of conditions 16, 38 and 44 of Planning Approval LA06/2023/1500/F which read: Condition16 - No development, including ground preparation or vegetation clearance, shall take place, with the exception of the establishment of the two site compounds and any archaeological works required under conditions 17 and 18 as shown on phasing drawing No. 58C bearing the date stamp 30 June 2022 and any archaeological works required under conditions 17 and 18 below, until a final Construction and Environmental Management Plan (CEMP) has been submitted to and approved in writing by the Council. This shall reflect all of the mitigation and avoidance measures detailed in the outline CEMP and the Ecological Impact Assessment. The approved CEMP shall be implemented in accordance with the approved details and all works on site shall conform to the approved CEMP, unless otherwise agreed in writing by the Council. The CEMP shall include the following: a) Construction methodology and timings of works; b) Pollution Prevention Plan; including suitable buffers between the location of all construction works, storage of excavated spoil and construction materials, any refuelling, storage of oil/fuel, concrete mixing and washing areas and any watercourses or surface drains present on or adjacent to the site; c) Site Drainage Management Plan; including Sustainable Drainage Systems (SuDS), foul water disposal and silt management measures; d) Water Quality Monitoring Plan; e) Environmental Emergency Plan; f) Details of appropriate mitigation measures to protect hedgehogs; g) Details of updated Japanese knotweed surveys to be carried out and any necessary mitigation and/or management measures required; h) Details of the appointment of an Ecological Clerk of Works (ECoW) and their roles and responsibilities i) A Construction Event Management Plan and Construction Site Traffic Management Plan. Condition 38 - Prior to the commencement of development, a dust management plan shall be submitted to and agreed in writing by the Council. This shall outline the site-specific dust mitigation measures to be employed during demolition and construction phases to minimise the generation and movement of dust from the proposed development to surrounding areas. Condition 44 - Prior to the commencement of any works on site with the exception of the establishment of the two site compounds as shown on Drawing No. 58C bearing the date stamp 30 June 2022 and any archaeological works required under conditions 17 and 18 above, an inspection shall be undertaken to review the site conditions and the potential for any re-occurrence of Japanese knotweed. If Japanese knotweed or other invasive species are found, necessary action shall be taken prior to works commencing on site. Details of these inspections and any action required shall be included in the final Construction Environmental Management Plan (CEMP) referred to in condition16 above. The development shall be carried out in accordance with the approved details.
Decided Conditions Demolition 10 docs -
Lands at and to the rear of 18 – 52 Main Street (Reeds Rain to TK Maxx), 2 – 34 King Street, 5 -17 Southwell Road, 5 – 41 Queen’s Parade, Marine Gardens car park, the Esplanade Gardens, and area around McKee Clock, Queen's Parade, Bangor, BT20 3BJ
96% historically approved · decision due ~17 Dec
Discharge of Condition 11 of Planning Approval LA06/2024/0559/F which states 'The two pavilion buildings indicated as B1 and B2 on drawing No. 64A, shall be single storey and shall have a maximum ridge height of 6.5m in height when measured from finished floor level and a maximum internal floor space of 200sqm. Details of the design and finishes shall be submitted to and approved in writing by the Council prior to commencement of construction of either of the pavilion buildings. The development shall be carried out in accordance with the details as subsequently approved’
Awaiting decision Conditions Roofing 9 docsSmall domestic
Other full applications applications
In Ards and North Down
-
LA06/2026/0644/F Granted
31 Kensington Park, Bangor, BT20 3RF
Demolition of side integral garage with single storey rear extension.
-
LA06/2026/0631/F Granted
17 Maralin Avenue, Bangor, BT20 4RQ
Single-storey side extension (facing road); enlarged rear dormer
-
LA06/2026/0493/F Granted
8 Rhanbuoy Park, Holywood, BT18 0DX
Single-storey rear extension (replacing sunroom); alteration to materials/re-tile roof; dormer to front and rear; raised patio to rear.
-
LA06/2026/0630/F Granted
10 Dromena Gardens, Newtownards, BT23 4PX
Single-storey side extension; ramped access at rear. New vehicular access
-
LA06/2026/0613/F Granted
Within curtilage of 22 Ravara Road, Ballygowan (adjacent and southwest of No.22A)
Doube garage wih gym (to replace fire-damaged stables)