Proposal

Discharge of Conditions 8 and 26 of planning approval LA06/2024/0623/F which state: Condition 8: Prior to the construction of the drainage network, a final Drainage Assessment, compliant with Policy FLD 3 and Annex D of PPS 15, shall be submitted to and agreed in writing by the Council. The final Drainage Assessment must demonstrate the safe management of any out of sewer flooding emanating from the surface water drainage network, agreed under Article 161, in a 1 in 100 year event including an allowance for climate change and urban creep. The drainage network must be provided in accordance with the approved details prior to the commencement of use of the development hereby approved. Reason: In order to safeguard against surface water flood risk to the development and manage and mitigate any increase in surface water flood risk from the development to elsewhere. Condition 26: A detailed landscape management and maintenance plan including long term design objectives, performance indicators, management responsibilities, and maintenance schedules for all landscaped areas shall be submitted to and agreed in writing by the Council prior to the commencement of operation of the development hereby approved. The landscape management and maintenance plan shall be permanently carried out as approved. Reason: To ensure the sustainability of the approved landscape design through its successful establishment and long-term maintenance.

As published by the council, reference LA06/2026/0184/DC

Application record

Reference
LA06/2026/0184/DC
Type
Discharge of Condition
Status
Determined
Decision
Granted As published: Condition Partially Discharged
Received
3 Mar 2026
Validated
3 Mar 2026
Decided
26 May 2026
Ward
Castle (North Down and Ards)

Site history

Applications at this address on the Ards and North Down register

This site has had 2 applications since 2026: 1 approved, 0 refused.

  • LA06/2026/0665/S54 Awaiting decision

    1-15 (odds) Skipperstone Park, 11-33 (odds) Skipperstone Avenue, 1-6 Skipperstone Gardens, and 100-122 (evens) Bloomfield Road South, Bangor

    Demolition of existing dwellings, erection of discount supermarket, provision of access, car parking, landscaping, removal of bus lay-by, relocation of bus shelter, relocation of pedestrian footway between Bloomfield Road South and Skipperstone Avenue, and associated site works (Relocation of existing Lidl supermarket from 97 Bloomfield Road to west of Bloomfield Road South and South of Skipperstone Park. Existing building at 97 Bloomfield Road to be retained but retail use to be extinguished). Variation of Conditions 2 (access) , 3 (splays), 5 (pedestrian path), 6 (road works), 7 (bus stop), 18 (hard surface) and 23 (landscaping) of previously approved application LA06/2024/0623/F (full proposal available on the public portal)

    Submitted 22 Jul 2026

Timeline

Dates from the published record

  1. 3 Mar 2026

    Received by Ards and North Down

  2. 26 May 2026

    Decision issued: Condition Partially Discharged

  3. 29 Jul 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

MBA Planning Ltd Agent, a planning consultancy registered in Belfast

Active · incorporated 2015 · Belfast

113 applications on PlanIndex · across 13 councils · 96% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Ards and North Down granted permission on 26 May 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 1-15 (odds) Skipperstone Park, 11-33 (odds) Skipperstone Avenue, 1-6 Skipperstone Gardens, and 100-122 (evens) Bloomfield Road South, Bangor

    LA06/2026/0665/S54 Submitted 22 Jul 2026 50 yards away

    96% historically approved · decision due ~23 Sep

    Demolition of existing dwellings, erection of discount supermarket, provision of access, car parking, landscaping, removal of bus lay-by, relocation of bus shelter, relocation of pedestrian footway between Bloomfield Road South and Skipperstone Avenue, and associated site works (Relocation of existing Lidl supermarket from 97 Bloomfield Road to west of Bloomfield Road South and South of Skipperstone Park. Existing building at 97 Bloomfield Road to be retained but retail use to be extinguished). Variation of Conditions 2 (access) , 3 (splays), 5 (pedestrian path), 6 (road works), 7 (bus stop), 18 (hard surface) and 23 (landscaping) of previously approved application LA06/2024/0623/F (full proposal available on the public portal)

    Awaiting decision Demolition 14 docs
  • Approved supermarket on land bounded by Skipperstone Park, No 35 Skipperstone Avenue, No 124 Bloomfield Road South, and Bloomfield Road South, Bangor’

    LA06/2026/0674/A Submitted 26 Jul 2026 100 yards away

    100% historically approved · decision due ~29 Sep

    3x free standing signs (illuminated) and 6x wall mounted signs (illuminated)

    Awaiting decision Advertising 8 docs
  • Lesley Bloomfield Shopping Centre and Retail Park South Circular Road, Bangor, BT19 7HB

    LA06/2026/0709/S54 Submitted 4 Aug 2026 150 yards away

    Extension to existing front entrance of shopping centre to include one retail unit and two restaurant units including reorganisation of car park and associated site works. Variation of Condition 4 of LA06/2024/1082/F from: No development shall proceed beyond sub-floor construction until the foul sewerage network engineering solution, as agreed with NI Water is delivered by the developer to the satisfaction of NI Water. To: The development shall not be occupied until the foul sewerage network engineering solution and programme for delivery of the solution is agreed to the satisfaction of NI Water.

    Granted Extension 9 docs
  • 107a Bloomfield Road South, Bangor, BT19 7HR

    LA06/2026/0064/A Submitted 22 Jan 2026 150 yards away

    100% historically approved · decision due ~25 Mar

    Reinstate 1no existing freestanding sign with new lighting, 1no new freestanding advertising with lighting, 1no new freestanding LED sign

    Awaiting decision Advertising 9 docs
  • 107a Bloomfield Road South, Bangor, BT19 7HR

    LA06/2026/0063/F Submitted 22 Jan 2026 150 yards away

    98% historically approved · decision due ~30 Mar

    New build storage garage

    Awaiting decision Full applications New dwelling 5 docs
  • Wren Kitchens, Bloomfield Shopping Centre, South Circular Road, Bangor, BT19 7HB

    LA06/2026/0877/A Submitted 23 Sep 2026 250 yards away

    100% historically approved · decision due ~18 Nov

    1 Other - Flexface Sign, 1 Other - Flexface sign, 1 Other - Flexface Sign, 1 Other - Flexface Sign

    Awaiting decision Advertising 7 docs

In Ards and North Down

  • LA06/2026/0884/DC Awaiting decision

    Vacant site North of Balloo Road, West of Bangor Grammar sports pitches and to the rear of nos 1-13 Rowan Glen, Balloo Road, Bangor, BT19 7UU

    Discharge of Condiition 10 of previously approved application LA06/2022/0873/F which states - Prior to the construction of the drainage network, the applicant shall submit a Drainage Assessment, compliant with Policy FLD 3 & Annex D of PPS 15, to be agreed in writing with the Council, which demonstrates the safe management of any out of sewer flooding emanating from the surface water drainage network, agreed under Article 161 under the Water and Sewerage Services Act (Northern Ireland) 2016, in a 1 in 100 year event. Reason: In order to safeguard against surface water flood risk

    Received 25 Sep, published by the council 1 Oct 2026 Conditions
  • LA06/2026/0887/DC Awaiting decision

    Former Juvenile Justice Services Centre site (169 Rathgael Road) and surrounding lands which lie to the north of the Rathgael Road and west of the Rathgael Road/Balloo Road/Newtownards Road roundabout junction Bangor

    Discharge of Condition 9 of previously approved application LA06/2016/0596/F which states - Prior to the occupation of the proposed development, the applicant shall provide to the Council, for approval, a Verification Report. This report must demonstrate that all the measures outlined in Section 10 of the RPS report entitled Proposed Residential Development, Rathgael Road, Bangor, Remedial Strategy referenced IBR0736 and bearing the Council date stamp 17th June 2016 have been fully implemented. The Verification Report shall demonstrate the successful completion of the remediation works and that the site is now fit for end-use. It must demonstrate that the identified potential pollutant linkages are effectively broken. The Verification Report shall be in accordance with current best practice and guidance as outlined by the Environment Agency. In particular, this Verification Report must demonstrate: a) Full Details of the installation and depths of the clean cover barriers have been confirmed as per layout. b) All fuel transfer lines and all associated pipework have been traced and removed in accordance with PPG 2 Above Ground Oil Storage Tanks. All remaining soils (or base and side-walls of all excavations) have been sampled and proven suitable for the proposed end-use. c) The hotspots of heavy metal and hydrocarbon contamination have been removed by excavation to a depth of 0.5m below the depth of the exceedance. All remaining soils (or base and side-walls of all excavations) have been sampled and demonstrably proven suitable for the proposed end-use. d) All imported soil brought on to the site has been accompanied by traceability documentation and has been demonstrably proven to be suitable for the end use. Reason: In the interests of living conditions of residents of the proposed development. Remedial Verification Report

    Received 25 Sep, published by the council 1 Oct 2026 Conditions
  • LA06/2026/0879/DC Awaiting decision

    Royal Hotel and Windsor Bar, 22-28 Quay Street, Bangor, BT20 5ED

    Discharge of Condition 6 of previously approved application LA06/2021/1477/F which states - Prior to the construction of the drainage network, a Drainage Assessment, compliant with FLD 3 & Annex D of PPS 15, shall be submitted to and agreed in writing by the Council which demonstrates the safe management of any out of sewer flooding emanating from the surface water drainage network, in a 1 in 100 year event with an additional allowance for climate change. Reason: To safeguard against flood risk to the development and from the development to elsewhere. Drainage Assessment produced by Design ID ref 19053-DID-ZZ-XX-RP-0002

    Received 23 Sep, published by the council 1 Oct 2026 Conditions
  • LA06/2026/0878/DC Awaiting decision

    Royal Hotel and Windsor Bar, 22-28 Quay Street, Bangor, T20 5ED

    Discharge of Condition 5 of previously approved application LA06/2021/1477/F which states - No development shall take place on-site until the method of sewage disposal has been agreed in writing with Northern Ireland Water (NIW) or a consent to discharge has been granted under the terms of the Water (NI) Order 1999. Reason: To ensure there will be no adverse impact on the environment. NI Water agreement

    Received 23 Sep, published by the council 1 Oct 2026 Conditions
  • LA06/2026/0873/DC Awaiting decision

    Lands South of 37-77 Court Street and 1-11 Canal Row, situated within Bawn Wall and bounded by the canal, Newtowards

    Discharge of Condition 15 of previously approved application LA06/2023/2434/F which states - On completion of the remediation and prior to the occupation of any dwelling hereby approved, the applicant shall provide to the Council, for approval in writing, a Verification Report. This report shall demonstrate that the remediation measures outlined in the report titled; ‘Contaminated Land Assessment (Phase 1 PRA, Phase 2 GQRA and Outline Remediation Strategy) Lands within the Bawn Wall, Newtownards, referenced P3098-1 and dated November 2023, have been fully implemented. This report shall demonstrate the successful completion of remediation works and demonstrate that the site is now fit for end-use and include details of: • Capping system • The methodology and programme of the capping system • Photographs and records of any excavation works within the source area including photographs showing depths to accommodate the capping layer • Photographs of the clean material being used and placed on the source area, also showing depths being placed • Records and photographs showing the depth of the capping system as required • Details of the materials that were used for the capping system along with laboratory certificates and results which confirm that the materials are suitable for use. Reason: Protection of human health. VERIFICATION REPORT FOR PHASE 5 (UNITS 1-6 AND 34-41)

    Received 23 Sep, published by the council 1 Oct 2026 Conditions