Skip to content
PlanIndex Get alerts
Menu

Planning application

LA06/2026/0031/A

Oasis Bingo, 1a Valentine Road, Bangor, BT20 4JH

Granted Ards and North Down Advertisement

Proposal

2x LED advertising screens

As published by the council, reference LA06/2026/0031/A

Timeline

Dates from the published record

  1. 14 Jan 2026

    Received by Ards and North Down

  2. 16 Jan 2026

    Validated

    Checked as complete and ready for consideration.

  3. 29 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About advertising applications

How this application type works

Advertisement consent controls signs, hoardings and other adverts. The council may only judge two things: amenity, meaning the effect on the appearance of the building and area, and public safety, chiefly whether a sign distracts road users or obstructs sight lines. Other planning considerations, such as competition between businesses, do not apply.

More on advertising applications in our guide

Nearby applications

Within 500 metres

  • Ward Park Hamilton Road, Bangor, BT20 4LG

    Non-Material Change to previous approval LA06/2016/1108/F to include: Addition of feature entrance arch at Hamilton Road entrance; addition of pathway to north of site; and removal of peacock enclosure.

    16 Apr 2026 445m away Amendments
  • LA06/2026/0567/DC Awaiting decision

    Ward Park, Hamilton Road, Bangor, BT20 4LG

    Discharge of condition 2 of previously approved application LA06/2016/1108/F which states : All hard and soft landscape works shall be carried out in accordance with the approved plans Drawing Nos. 08A and 09A bearing the date stamp 15 December 2020 and Drawing No. 10 bearing the date stamp 14 October 2016, and the appropriate British Standard or other recognised Codes of Practice and shall be retained thereafter. A specification detailing the timing for the implementation of hard and soft landscaping works shall be submitted to and approved in writing by the Council prior to commencement of any works on the site. All l hard and soft landscaping shall be carried out in accordance with the approved specification. Reason: To ensure the provision, establishment and maintenance of a high standard of landscape. Discharge of condition 7 of previously approved application LA06/2016/1108/F which states : A Final Construction Environmental Management Plan (CEMP) shall be submitted to and approved by the Council in writing prior to the commencement of any works on site. This final CEMP shall contain all the mitigation as described in the Outline Construction Environmental Management Plan completed by Doran Consulting, dated November 2019 and shall be implemented as approved during the construction phase to the satisfaction of the Council. Reason: To ensure that the appointed contractor is aware of and implements the appropriate environmental mitigation during improvements construction phase. Discharge of condition 11 of previously approved application LA06/2016/1108/F which states : A revised Noise Impact Assessment /Noise Management Plan for this development shall be submitted to and agreed by the Council in writing prior to any development works commencing on site. This report shall include: An assessment of the potential noise from construction activities which must have reference to BS 5228-1:2009+A1:2014 and include confirmation that the construction works will not exceed the Category A limit (65 dB LAeq daytime). An outline of the ongoing noise monitoring programme during all construction works, (including locations/ frequency) to verify compliance with the set levels. Details of all mitigation measures to control the construction noise from the site. The noise mitigation measures shall be implemented as approved during the construction phase to the satisfaction of the Council. Reason: In the interests of amenity.

    23 Jun 2026 445m away Conditions

In Ards and North Down

  • Gable Wall of No. 53 South Street Newtownards BT23 4JU

    1no. Digital sign

    13 Apr 2026 Advertising
  • Comber Pharmacy, 4 The Square, Comber, BT23 5DT

    2 Digital signs

    23 Apr 2026 Advertising
  • Units 3, Springhill Shopping Centre, Killeen Avenue, Bangor, BT19 1NB

    3 Shop sign, 2 Other - Lockable Poster Frames including internal illumination

    19 Dec 2025 Advertising
  • 61 Castle Street, Comber, BT23 5DY

    1x Shop sign with trough light, 1x fascia sign with trough light and 1x digital screen

    10 Feb 2026 Advertising
  • LA06/2026/0560/A Awaiting decision

    Unit 1 Bloomfield Retail Park, Bangor, BT19 7JD

    1 Other - High level front elevation (illuminated)- Sign A, 1 Other - Loading Bay sign Sign G,

    19 Jun 2026 Advertising