Planning application
SITE OF FORMER BANGOR LEISURE CENTRE Adjacent to 7 Castle Park Avenue, Bangor, BT20 4BN
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Discharge of Condition 3 of approval LA06/2019/1295/F which states: Prior to the commencement of any development on site a final hard and soft landscaping scheme shall be submitted to and approved in writing by the Council in consultation with HED: Historic Buildings. The scheme shall include details of all new walls, fences, other boundary treatments and finished ground levels, details of the hard surface treatment of open parts of the site including details of the car park finish; details of trees to be retained, a planting specification to include species, size, position and method of planting of all new trees and shrubs; and a programme of implementation. The works shall be implemented in accordance with the approved details during the first available planting season following occupation of any part of the development hereby approved (unless otherwise agreed in writing by the Council). All hard and soft landscape areas and works shall be permanently retained in accordance with the approved details. Any existing or proposed trees or plants indicated on the approved plans which, within a period of 5 years from the date of planting, die are removed or become seriously damaged, diseased or dying shall be replaced during the next planting season with other trees or plants of a location, species and size, details of which shall have first been submitted to and approved in writing by the Council.
As published by the council, reference LA06/2024/0688/DC
Application record
- Reference
- LA06/2024/0688/DC
- Type
- Discharge of Condition
- Status
- Determined
- Decision
- Granted As published: Condition Partially Discharged
- Received
- 5 Aug 2024
- Validated
- 5 Aug 2024
- Decided
- 4 Nov 2024
- Ward
- Castle (North Down and Ards)
- Postcode
- BT20 4BN
Timeline
Dates from the published record
-
5 Aug 2024
Received by Ards and North Down
-
4 Nov 2024
Decision issued: Condition Partially Discharged
-
27 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
HR Jess Ltd Agent, registered in Newtownabbey
Active · incorporated 2006 · Newtownabbey
64 applications on PlanIndex · across 8 councils · 98% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
6 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Ards and North Down granted permission on 4 November 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Site of former Bangor Castle Leisure Centre Adjacent to 7 Castle Park Avenue, Bangor, BT20 4BN
100% historically approved · decision due ~19 Oct
Discharge of Condition 8 of previously approved application LA06/2019/1295/F which states:- No development shall take place on-site until the method of sewage disposal has been agreed in writing with Northern Ireland Water or a consent to discharge has been granted under the terms of the Water (Northern Ireland) Order 1999 and evidence of this is submitted to the Council. Northern Ireland Water: Final Response Correspondence
Awaiting decision Conditions 5 docs -
Bangor Town Hall CASTLE PARK ROAD BANGOR DOWN BT20 4TF
10 Street Lights
Withdrawn Heritage and listed buildings 9 docs -
On pavement 20m from front entrance of the Bus and Rail station on Abbey Street, Bangor.
Erection of freestanding 'Street Hub' (comprising two digital 75-inch LCD display screens -each side)
Granted Full applications 15 docs -
On pavement 20m from front entrance of the Bus and Rail station on Abbey Street, Bangor.
Erection of a freestanding 'Street Hub' (comprising two digital 75-inch LCD display screens each side)
Granted Advertising 10 docs -
4A Abbey Street Bangor BT20 4JA
Change of Use from storage to office use (A2) (Amended Plans)
Granted Full applications 16 docs -
6 Abbey Street, Bangor, BT20 4JA
Change of use from a private apartment to short term let apartment on first and second floors
Granted Full applications 11 docs
Other condition discharge and variation applications
In Ards and North Down
-
LA06/2026/0884/DC Awaiting decision
Vacant site North of Balloo Road, West of Bangor Grammar sports pitches and to the rear of nos 1-13 Rowan Glen, Balloo Road, Bangor, BT19 7UU
Discharge of Condiition 10 of previously approved application LA06/2022/0873/F which states - Prior to the construction of the drainage network, the applicant shall submit a Drainage Assessment, compliant with Policy FLD 3 & Annex D of PPS 15, to be agreed in writing with the Council, which demonstrates the safe management of any out of sewer flooding emanating from the surface water drainage network, agreed under Article 161 under the Water and Sewerage Services Act (Northern Ireland) 2016, in a 1 in 100 year event. Reason: In order to safeguard against surface water flood risk
-
LA06/2026/0887/DC Awaiting decision
Former Juvenile Justice Services Centre site (169 Rathgael Road) and surrounding lands which lie to the north of the Rathgael Road and west of the Rathgael Road/Balloo Road/Newtownards Road roundabout junction Bangor
Discharge of Condition 9 of previously approved application LA06/2016/0596/F which states - Prior to the occupation of the proposed development, the applicant shall provide to the Council, for approval, a Verification Report. This report must demonstrate that all the measures outlined in Section 10 of the RPS report entitled Proposed Residential Development, Rathgael Road, Bangor, Remedial Strategy referenced IBR0736 and bearing the Council date stamp 17th June 2016 have been fully implemented. The Verification Report shall demonstrate the successful completion of the remediation works and that the site is now fit for end-use. It must demonstrate that the identified potential pollutant linkages are effectively broken. The Verification Report shall be in accordance with current best practice and guidance as outlined by the Environment Agency. In particular, this Verification Report must demonstrate: a) Full Details of the installation and depths of the clean cover barriers have been confirmed as per layout. b) All fuel transfer lines and all associated pipework have been traced and removed in accordance with PPG 2 Above Ground Oil Storage Tanks. All remaining soils (or base and side-walls of all excavations) have been sampled and proven suitable for the proposed end-use. c) The hotspots of heavy metal and hydrocarbon contamination have been removed by excavation to a depth of 0.5m below the depth of the exceedance. All remaining soils (or base and side-walls of all excavations) have been sampled and demonstrably proven suitable for the proposed end-use. d) All imported soil brought on to the site has been accompanied by traceability documentation and has been demonstrably proven to be suitable for the end use. Reason: In the interests of living conditions of residents of the proposed development. Remedial Verification Report
-
LA06/2026/0879/DC Awaiting decision
Royal Hotel and Windsor Bar, 22-28 Quay Street, Bangor, BT20 5ED
Discharge of Condition 6 of previously approved application LA06/2021/1477/F which states - Prior to the construction of the drainage network, a Drainage Assessment, compliant with FLD 3 & Annex D of PPS 15, shall be submitted to and agreed in writing by the Council which demonstrates the safe management of any out of sewer flooding emanating from the surface water drainage network, in a 1 in 100 year event with an additional allowance for climate change. Reason: To safeguard against flood risk to the development and from the development to elsewhere. Drainage Assessment produced by Design ID ref 19053-DID-ZZ-XX-RP-0002
-
LA06/2026/0878/DC Awaiting decision
Royal Hotel and Windsor Bar, 22-28 Quay Street, Bangor, T20 5ED
Discharge of Condition 5 of previously approved application LA06/2021/1477/F which states - No development shall take place on-site until the method of sewage disposal has been agreed in writing with Northern Ireland Water (NIW) or a consent to discharge has been granted under the terms of the Water (NI) Order 1999. Reason: To ensure there will be no adverse impact on the environment. NI Water agreement
-
LA06/2026/0873/DC Awaiting decision
Lands South of 37-77 Court Street and 1-11 Canal Row, situated within Bawn Wall and bounded by the canal, Newtowards
Discharge of Condition 15 of previously approved application LA06/2023/2434/F which states - On completion of the remediation and prior to the occupation of any dwelling hereby approved, the applicant shall provide to the Council, for approval in writing, a Verification Report. This report shall demonstrate that the remediation measures outlined in the report titled; ‘Contaminated Land Assessment (Phase 1 PRA, Phase 2 GQRA and Outline Remediation Strategy) Lands within the Bawn Wall, Newtownards, referenced P3098-1 and dated November 2023, have been fully implemented. This report shall demonstrate the successful completion of remediation works and demonstrate that the site is now fit for end-use and include details of: • Capping system • The methodology and programme of the capping system • Photographs and records of any excavation works within the source area including photographs showing depths to accommodate the capping layer • Photographs of the clean material being used and placed on the source area, also showing depths being placed • Records and photographs showing the depth of the capping system as required • Details of the materials that were used for the capping system along with laboratory certificates and results which confirm that the materials are suitable for use. Reason: Protection of human health. VERIFICATION REPORT FOR PHASE 5 (UNITS 1-6 AND 34-41)