Skip to content
PlanIndex Get alerts
Menu

Planning application

Strangford Integrated College Abbey Road, Carrowdore BT22 2GB

Awaiting decision Ards and North Down la06/2025/0707/S54 Section 54

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Variation of Condition 2 of planning approval LA06/2019/1207/F re vehicular access and sight splays (Full Description available on Planning Portal)

As published by the council, reference la06/2025/0707/S54

Application record

Reference
la06/2025/0707/S54
Type
Section 54
Status
Consultation Open
Received
12 Aug 2025
Validated
12 Aug 2025
Ward
Carrowdore
Postcode
BT22 2GB

Site history

Applications at this address on the Ards and North Down register

This site has had 2 applications since 2025.

  • LA06/2025/0707/F Awaiting decision

    Strangford Integrated College Abbey Road, Carrowdore BT22 2GB

    Retrospecive vehicular access and sight splays (Full Description available on Planning Portal) (Amended Application Form)

    Submitted 12 Aug 2025 Full applications

Timeline

Dates from the published record

  1. 12 Aug 2025

    Received by Ards and North Down

  2. 29 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 7 October 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Ards and North Down took a median of 78 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

AECOM Limited Agent, registered in London

Active · incorporated 1984 · London

240 applications on PlanIndex · across 66 councils · 98% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Ards and North Down for determination, against a statutory target of eight weeks. Over the last year Ards and North Down's median decision took 78 days. More in our guide to how long planning decisions take.

About this record

The published feed does not state which type of application this is; the register entry on Ards and North Down's portal will say. Our guide explains the common types.

Nearby applications

Within 500 metres

  • Strangford Integrated College Abbey Road, Carrowdore BT22 2GB

    LA06/2025/0707/F Submitted 12 Aug 2025 0m away

    99% historically approved · decision due ~7 Oct

    Retrospecive vehicular access and sight splays (Full Description available on Planning Portal) (Amended Application Form)

    Awaiting decision Full applications 4 docs
  • 18 McBriar Park, Carrowdore

    LA06/2025/0719/F Submitted 15 Aug 2025 362m away

    1.5-storey garage extension to side, dormer to rear, and second-floor window on gable.

    Granted Full applications Extension Loft or dormer +1 16 docs
  • 1 Church Road Carrowdore BT22 2HA

    LA06/2023/1371/F Submitted 19 Jan 2023 442m away

    Single storey front extension

    Granted Full applications Extension 12 docs
    Small domestic
  • Land East of 17 New Road Carrowdore BT22 2JJ

    LA06/2026/0448/RM Submitted 22 May 2026 450m away

    Two storey dwelling and associated road entrance

    Granted Reserved matters 22 docs
    Domestic
  • 17 New Road, Carrowdore, BT22 2JJ

    LA06/2025/0834/O Submitted 22 Sep 2025 455m away

    Two storey dwelling and associated road entrance

    Granted Outline 26 docs
    Domestic
  • The Paddocks Development, 50 Main Street and lands to rear of 38-48 Main Street Carrowdore

    LA06/2025/0740/DC Submitted 19 Aug 2025 471m away

    Discharge of Conditions 9 and 10 of previously approved application LA06/2022/1076/F, in relation to plots 61-67. Condition 9 - Prior to the occupation of the proposed development, a Verification Report shall be submitted to and agreed in writing by the Council. This report shall demonstrate the successful completion of remediation works and demonstrate that the site is now fit for end-use, including details of: a) Capping system • The report shall demonstrate that an appropriate capping system has been installed within the garden and landscaped areas. This must comprise a 600mm capping system with a minimum of 200mm crushed stone capillary break in the base overlain with 400mm of clean material above subsoil and topsoil. The report must include details of the methodology and programme of the capping system. • Photographs and records of any excavation works within the source area including photographs showing depths to accommodate the capping layer. • Records and photographs of the clean material being used and placed on the source area, also showing depths being placed. • Details of the materials that were used for the capping system along with laboratory certificates and results which confirm that the materials are suitable for use. b) Gas Protection measures • The measures must demonstrate compliance with the requirements of CS2 as prescribed in guidance within CIRIA C665 and attain a gas protection score of at least 3.5 with the report including. • Final designs of building gas protection measures • Details of any specific products used. • Records from the installation process including photographic records of: • The installation of the under-floor void • The construction of the concrete floor • Membrane installation works and • Records of inspection of installed gas protection measures Reason: Protection of human health. Condition 10 - If during the development works, new contamination or risks are encountered which have not previously been identified, works shall cease and the Council shall be notified immediately. This new contamination shall be fully investigated in accordance with the Model Procedures for the Management of Land Contamination (CLR11). In the event of unacceptable risks being identified, a remediation strategy shall be agreed with the Council in writing, and subsequently implemented and verified to its satisfaction. Reason: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other off site receptors. PLOTS 61-62-63-64-65-66-67 ONLY RSK REPORT FOR PLOTS 61-62-63-64-65-66-67 ONLY

    Granted Conditions 8 docs